← Back
Two family converted from one family
2464 DEVOE TERRACE
BRONX · BIN 2014796
💬 Discuss this project
1910Year Built
2.5Stories
B3Building Class
R6Zoning
1,448 sfGross Floor Area
2Units
3 Open Violations ▸
Two family converted from one family · 2,250 sf lot · 0.64 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 2 filings · 12 docs
Floor 2Under Construction4p · 1 filing · 6 docs
Floor 1Under Construction4p · 1 filing · 6 docs
CellarUnder Construction4p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ANSWER CONSTRUCTION307/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BANGASH ASSOCIATES INC.201/15/2026
MOMENTUM SOLAR102/04/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHITECTURAL DESIGN SOLUTIONS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ISLAND ELECTRIC CORPElectrical103/22/2026
ANSWER CONSTRUCTION CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARC-HI-TECH ASSOCIATES IN6963101/15/2026
MXV SIA LLC9281102/04/2025
BANGASH ASSOCIATES INC84881—
Building Lifecycle
All (29)Filed (2)Permit Issued (2)Violation (3)Objection (16)Special Inspection (6)
05/29/2026
Permit issued — General Construction
X01342432-I1-GC
04/21/2026
Objection resolved — Resolved
03/18/2026
Objection resolved — Addressed
03/18/2026
Objection resolved — Addressed
03/18/2026
Objection resolved — Addressed
03/18/2026
Objection resolved — Addressed
03/18/2026
Objection resolved — Addressed
03/11/2026
Objection resolved — Addressed
03/06/2026
Objection resolved — Addressed
01/28/2026
Objection raised — Zoning
01/28/2026
Objection raised — Structural
01/28/2026
Objection raised — Structural
01/28/2026
Objection raised — Other
01/28/2026
Objection raised — Structural
01/28/2026
Objection raised — Plumbing
01/28/2026
Objection raised — Zoning
01/28/2026
Objection raised — Cost
01/15/2026
Filed — Alteration
APPLICATION TO RENOVATE THE INTERIOR OF THE EXISTING 2.5 STORYHOUSE, INCLUDING PARTITIONS AS PER THE PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE REQUIRED PLUMBING WORK WILL BE FILED SEPARATELY
X01342432-I1
01/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
IGOR LISOVENKO
06/23/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/23/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/23/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/06/2025
Permit issued — Solar
X01176067-I1-SL
02/04/2025
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 15 Panels, 6.15 kW
X01176067-I1
02/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
02/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
02/04/2025
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
02/04/2025
Special inspection requirement — Final
Mina Makar
02/04/2025
Special inspection requirement — Air barrier - visual inspection
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedANSWER CONSTRUCTION CORP05/29/2026
DOB NOWSolarPermit IssuedMOMENTUM SOLAR02/06/2025
2 projects · most recent 06/25/2026
General Wiring
FiledStatusContractorScope
06/25/2026Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
02/04/2025Permit IssuedISLAND ELECTRIC CORP—
1 project · most recent 02/04/2025
FiledStatusContractorScope
02/04/2025Permit IssuedMOMENTUM SOLAR15 panels, 6.15 kw, 264 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
01/05/2026Fire-Resistant Penetrations and JointsIGOR LISOVENKOspecial
02/04/2025Fire-Resistant Penetrations and JointsMina Makarspecial
02/04/2025Structural Stability – Alterations of existing buildingsMina Makarspecial
02/04/2025Energy Code Compliance InspectionsMina Makarprogress
02/04/2025FinalMina Makarprogress
02/04/2025Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/20/2026X01176067-I1Request digital key ↗
08/17/2026X01342432-S1Request digital key ↗
08/14/2026X01342432-I1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/17/2026X01342432-I1Open ↗
08/13/2026X01176067-I1Open ↗
08/13/2026X01342432-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/30/2026X01176067-I1Open ↗
08/30/2026X01176067-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/30/2026X01176067-I1Open ↗
08/23/2026X01342432-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/17/2026X01342432-S1Open ↗
08/14/2026X01342432-I1Open ↗
08/13/2026X01176067-I1Open ↗