ECB12/14/2006FAILURE TO MAINTAIN.NOTE. A LARGE HOLE APPROX 4' IN DIAMETER WAS OBSERVED IN THE CEILING (1ST FL)OF THIS INDUSTRIAL BLDG. THE HOLE IS EXPOSING THE FL OF THE 2ND STORY TO POSSIBLE FIRE DAMAGES AS NO FIRE STOPPINNothing owed — awaiting certificate of correction
ECB04/21/2006FAILURE TO MAINTAIN EXTERIOR BLDG WALL. NOTED:BULGED, LOOSE BRICK AND CRAKED ROOF PARAPET, APPROX. 10FT X 5FT AT S/E CORNER/FRONT. REMEDY:REPAIR DEFECTNothing owed — awaiting certificate of correction
ECB04/12/2006FAILURE TO MAINTAIN BUILDING WALL- HAZARDOUS DEFECT NOTED. AT ABOVE PREMISES 2 STORY BRICK BUILDING HAS VARIOUS CRACKS IN SEVERAL LOCATIONS.APPROX. 2"INCH X 3'FOOT VERTICAL CRACK, AT PARAPET LEVEL SOUTHNothing owed — awaiting certificate of correction
Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.