← Back
Two family frame
247 SWINNERTON STREET
STATEN ISLAND · Tottenville-Charleston · BIN 5150677
💬 Discuss this project
2001Year Built
2Stories
B2Building Class
R3XZoning
2,736 sfGross Floor Area
2Units
Two family frame · 5,070 sf lot · 0.54 FAR built · Flood zone X
Locations of Work
Electrical
Roof1p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC107/11/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272107/11/2024
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
02/14/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01077368-I1
07/24/2024
Permit issued — Solar
S01077368-I1-SL
07/11/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01077368-I1
07/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
07/08/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
07/08/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
07/08/2024
Special inspection requirement — Final
Walid Abdulla
07/08/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC07/24/2024
BIS—ISSUEDNICOLE DEVELOPMENT CORP05/09/2001
BIS—ISSUEDNICOLE DEVELOPMENT CORP11/22/2000
BIS—ISSUEDNICOLE DEVELOPMENT CORP06/07/2000
1 project · most recent 07/11/2024
FiledStatusContractorScope
07/11/2024CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
07/08/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
07/08/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
07/08/2024Energy Code Compliance InspectionsWalid Abdullaprogress
07/08/2024FinalWalid Abdullaprogress
07/08/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026S01077368-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
09/02/2026S01077368-I1Open ↗
09/02/2026S01077368-I1Open ↗
09/02/2026S01077368-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026S01077368-I1Open ↗
09/02/2026S01077368-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S01077368-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01077368-I1Open ↗