← Back
Office with commercial, 7-19 stories
Bricken Center Building
247 WEST 37 STREET · BIN 1014454
💬 Discuss this project
1924Year Built
18Stories
O6Building Class
M1-9AZoning
214,130 sfGross Floor Area
50Units
LL97 Covered56 Open Violations 55 unresolved · 1 paperwork only ▸FISP: SWARMP
Office with commercial, 7-19 stories · Owner of record: 247 WEST 37TH ST. ASSOCIATES, · 14,812 sf lot · 14.46 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
Roof5p · 6 filings · 20 docs
Floor 141p · 1 filing · 5 docs
Floor 13
Floor 121p · 2 filings · 17 docs
Floor 111p · 2 filings · 7 docs
Floor 101p · 1 filing · 6 docs
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 41p · 1 filing · 10 docs
Floor 3
Floor 2Under Construction2p · 2 filings · 18 docs
Floor 1Under Construction7p · 3 filings · 20 docs
CellarUnder Construction3p · 2 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GFP REAL ESTATE9508/28/2026
NEWMARK2007/08/2026
PYRAMID RESTORATION NY404/09/2026
ALL OVER CONSTRUCTION CORP503/22/2026
247 WEST 37TH STREET2303/22/2026
247 WEST 37 STREET403/22/2026
REGAL ORIGINALS 3 FL (BU103/22/2026
SUNSHINE SPORTS INC (BUSI103/22/2026
B2K CORP.103/22/2026
FRESCA FASHIONS INC.103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
COOL BREEZE AIR CON INCGeneral Contractor907/08/2026
URBAN INTELLIGENCE, INCGeneral Contractor707/08/2026
AVARGA CONTRACTING CORPGeneral Contractor603/21/2026
ALL OVER CONSTRUCTION CORGeneral Contractor507/08/2026
AVARGA CONSTRUCTION CORPGeneral Contractor307/08/2026
NORTH STAR AIR CONDITION*General Contractor307/08/2026
TOUGH STALLION LLCElectrical303/21/2026
BIRNBAUM, ALANElectrical303/21/2026
NAT'L MECH. SVCS PLBG LLCPlumbing307/08/2026
ANDREW CHARNOWElectrical203/21/2026
DYNAMIC AIR CONDITIONINGGeneral Contractor203/21/2026
ACE-ATLAS PLBING & HTGPlumbing107/08/2026
ABE HIMELFARBElectrical103/21/2026
ZONE PLUMBING & HEATING CPlumbing109/01/2026
EUSEBIO MCQUEENElectrical103/21/2026
GREGORY PUZZOElectrical103/21/2026
JOHN CORBETTElectrical103/21/2026
JOSE GONZALEZElectrical103/21/2026
NEW PHASE ELEC'L CONTR'SElectrical103/22/2026
RONALD STEWARTElectrical103/21/2026
STEWART RONALDElectrical103/21/2026
STUART ISER, INCFire Protection103/21/2026
RCJ CONTRUCTIONS L.L.CGeneral Contractor108/27/2026
SETPOINT TECHNICAL CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PRIME ZONE BUILDING CONSU9474107/15/2026
HOWARD L ZIMMERMAN ARCHIT1712306/06/2025
MSA CONSULTING GROUP LLC7616103/31/2024
WALTER T. GORMAN, P.E., P268801/15/2023
Building Lifecycle
All (187)Filed (30)Permit Issued (32)Signed Off (18)Facade (FISP) (12)Violation (60)Inspection (3)Objection (2)Special Inspection (30)
08/31/2026
Permit issued — Plumbing
M01425435-I1-PL
08/26/2026
Permit issued — General Construction
M01421135-I1-GC
07/15/2026
Filed — Alteration
INTERIOR RENOVATION IN EXISTING COMMERCIAL STORE. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
M01421135-I1
07/14/2026
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH ALT-2 APPLICATION # APPLICATION #M01421135. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
M01425435-I1
07/09/2026
Signed off — Alteration
M01300380-I1
07/01/2026
Special inspection requirement — Energy Code Compliance Inspections
JICHEN SUN
07/01/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JICHEN SUN
07/01/2026
Special inspection requirement — HVAC-R and service water heating system controls
JICHEN SUN
07/01/2026
Special inspection requirement — HVAC-R and service water heating equipment
JICHEN SUN
06/23/2026
Special inspection requirement — Interior lighting power
JICHEN SUN
06/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JICHEN SUN
06/23/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JICHEN SUN
06/23/2026
Special inspection requirement — Fenestration areas
JICHEN SUN
06/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
JICHEN SUN
06/23/2026
Special inspection requirement — Energy Code Compliance Inspections
JICHEN SUN
06/23/2026
Special inspection requirement — Fenestration air leakage
JICHEN SUN
06/03/2026
Cycle 10 facade report signed — SWARMP
05/26/2026
Cycle 10 facade inspection completed
05/12/2026
Cycle 10 facade report submitted
04/22/2026
Signed off — Alteration
8th Cycle FISP repairs. No change in use, egress or occupancy.
M08037285-I1
04/13/2026
Permit issued — Structural
M00791846-I1-GC
04/13/2026
Permit issued — General Construction
M00791846-I1-ST
12/03/2025
Permit issued — Suspended Scaffold
M01300380-I1-SC
11/26/2025
Signed off — Alteration
INSTALLATION AND USE OF TEMPORARY SUSPENDED SCAFFOLD FOR FACADE INSPECTION AND REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01024295-I1
10/31/2025
Permit issued — Suspended Scaffold
M01300380-I1-SC
10/20/2025
Filed — Alteration
M01300380-I1
07/10/2025
Violation issued (ECB, closed)
Boilers
06/24/2025
Special inspection requirement — Final
Howard Zimmerman
06/24/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Howard Zimmerman
06/24/2025
Special inspection requirement — Masonry
Howard Zimmerman
06/24/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Howard Zimmerman
06/09/2025
Permit issued — General Construction
M08037285-I1-GC
06/06/2025
Filed — Alteration
8th Cycle FISP repairs. No change in use, egress or occupancy.
M08037285-P1
05/06/2025
Permit issued — Suspended Scaffold
M01024295-I1-SC
03/20/2025
Signed off — Alteration
TEMPORARY INSTALLATION OF SUPPORTED PIPE SCAFFOLD AS SHOWN ON PLANS. SHALL COMPLY WITH BSA-362-44-SM, LL-33/91, CHAP 33, SECTION 33 OF 2014 NYC DOB BC & TPPN # 9/99. NO CHANGE IN EGRESS, OC
M00808472-I1
10/10/2024
Permit issued — Suspended Scaffold
M01024295-P1-SC
10/03/2024
Filed — Alteration
INSTALLATION AND USE OF TEMPORARY SUSPENDED SCAFFOLD FOR FACADE INSPECTION AND REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01024295-P1
09/18/2024
Signed off — Alteration
REPLACE ELECTRIC BOILER ON 11th FLOOR.
M01011449-I1
08/26/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/29/2024
Signed off — Alteration
FILING HEREWITH REPLACEMENT OF EXISITING AIR COOLED SPLIT SYSTEM ALONG WITH ASSOCIATED DUCT AND PIPING.
M01004613-I1
07/03/2024
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED FOR PEDESTRIAN SAFETY DURING CONSTRUCTION. SIDEWALK SHED SHALL COMPLY WITH NYCC 2014 CHAPTER 33 . NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M08018431-I1
06/07/2024
Permit issued — General Construction
M08037285-I1-GC
05/24/2024
Permit issued — Mechanical Systems
M01004613-I1-MS
05/17/2024
Filed — Alteration
REPLACE ELECTRIC BOILER ON 11th FLOOR.
M01011449-I1
05/17/2024
Permit issued — Boiler Equipment
M01011449-I1-BE
05/06/2024
Permit issued — Suspended Scaffold
M01024295-I1-SC
04/25/2024
Violation issued (ECB, closed)
Local Law
04/08/2024
Violation issued (ECB, closed)
Plumbing
03/31/2024
Filed — Alteration
FILING HEREWITH REPLACEMENT OF EXISITING AIR COOLED SPLIT SYSTEM ALONG WITH ASSOCIATED DUCT AND PIPING.
M01004613-I1
03/25/2024
Permit issued — Suspended Scaffold
M01024295-I1-SC
03/22/2024
Filed — Alteration
INSTALLATION AND USE OF TEMPORARY SUSPENDED SCAFFOLD FOR FACADE INSPECTION AND REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01024295-I1
02/26/2024
Special inspection requirement — HVAC-R and service water heating system controls
Manmohan Siwan
02/26/2024
Special inspection requirement — HVAC-R and service water heating equipment
Manmohan Siwan
02/26/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Manmohan Siwan
02/26/2024
Special inspection requirement — Shutoff dampers
Manmohan Siwan
02/26/2024
Special inspection requirement — Maintenance information
Manmohan Siwan
02/13/2024
Special inspection requirement — Energy Code Compliance Inspections
Manmohan Siwan
02/12/2024
Special inspection requirement — Mechanical Systems
Manmohan Siwan
02/12/2024
Special inspection requirement — Final
Manmohan Siwan
01/16/2024
Permit issued — Supported Scaffold
M00808472-I1-SF
Latest 60 of 187 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedZONE PLUMBING & HEATING C08/31/2026
DOB NOWGeneral ConstructionPermit IssuedRCJ CONTRUCTIONS L.L.C08/26/2026
DOB NOWStructuralPermit IssuedALL OVER CONSTRUCTION COR04/13/2026
DOB NOWGeneral ConstructionPermit IssuedALL OVER CONSTRUCTION COR04/13/2026
DOB NOWSuspended ScaffoldSigned-offSTREAMLINE CONSULTANTS NY12/03/2025
DOB NOWSuspended ScaffoldSigned-offSTREAMLINE CONSULTANTS NY10/31/2025
DOB NOWGeneral ConstructionSigned-offAVARGA CONSTRUCTION CORP06/09/2025
DOB NOWSuspended ScaffoldSigned-offAVARGA CONSTRUCTION CORP05/06/2025
DOB NOWSuspended ScaffoldPermit IssuedAVARGA CONSTRUCTION CORP10/10/2024
DOB NOWGeneral ConstructionSigned-offAVARGA CONSTRUCTION CORP06/07/2024
DOB NOWMechanical SystemsSigned-offSETPOINT TECHNICAL CORP05/24/2024
DOB NOWBoiler EquipmentSigned-offNAT'L MECH. SVCS PLBG LLC05/17/2024
DOB NOWSuspended ScaffoldSigned-offAVARGA CONSTRUCTION CORP05/06/2024
DOB NOWSuspended ScaffoldSigned-offAVARGA CONSTRUCTION CORP03/25/2024
DOB NOWSupported ScaffoldSigned-offAVARGA CONTRACTING CORP01/16/2024
DOB NOWSidewalk ShedSigned-offURBAN INTELLIGENCE, INC01/08/2024
DOB NOWGeneral ConstructionSigned-offAVARGA CONSTRUCTION CORP05/25/2023
DOB NOWMechanical SystemsSigned-offNORTH STAR AIR CONDITION*01/18/2023
DOB NOWSupported ScaffoldSigned-offAVARGA CONTRACTING CORP01/17/2023
DOB NOWSidewalk ShedSigned-offURBAN INTELLIGENCE, INC01/06/2023
DOB NOWSidewalk ShedSigned-offURBAN INTELLIGENCE, INC10/15/2022
DOB NOWMechanical SystemsSigned-offNORTH STAR AIR CONDITION*03/16/2022
DOB NOWBoiler EquipmentSigned-offNAT'L MECH. SVCS PLBG LLC11/05/2021
DOB NOWMechanical SystemsSigned-offA&R HOME IMPROV & CONSTR10/20/2021
DOB NOWMechanical SystemsSigned-offCOOL BREEZE AIR CON INC08/16/2021
DOB NOWBoiler EquipmentSigned-offNAT'L MECH. SVCS PLBG LLC05/28/2021
DOB NOWMechanical SystemsSigned-offCOOL BREEZE AIR CON INC04/16/2021
DOB NOWMechanical SystemsSigned-offCOOL BREEZE AIR CON INC04/16/2021
DOB NOWMechanical SystemsSigned-offCOOL BREEZE AIR CON INC04/16/2021
DOB NOWMechanical SystemsSigned-offCOOL BREEZE AIR CON INC10/19/2020
DOB NOWPlumbingSigned-offACE-ATLAS PLBING & HTG11/27/2019
DOB NOWSupported ScaffoldPermit IssuedALL OVER CONSTRUCTION COR09/17/2019
BISOTISSUEDINTERIOR BUILDING SERVICE01/23/2020
BISOTISSUEDALL OVER CONSTRUCTION COR08/27/2019
BISOTISSUEDPHASE 3 INTERIORS LLC08/13/2018
BISMHISSUEDCENTRAL AIR CONDITIONING10/19/2016
BISSPISSUEDGO PRO FIRE PROTECTION C12/28/2015
BISPLISSUEDCOMMERICAL PLBG SVCES LLC12/28/2015
BISOTISSUEDTRASK LTD12/10/2015
BISPLISSUEDNAT'L MECH. SVCS PLBG LLC06/10/2014
+ 42 more permits on file
1 project · most recent 07/14/2026
Water/Sanitary
FiledStatusContractorScope
07/14/2026Permit IssuedZONE PLUMBING & HEATING CWater/Sanitary
4 projects · most recent 05/14/2026
General Wiring
FiledStatusContractorScope
05/14/2026Permit IssuedCABIN ELECTRICAL SVCS INCGeneral Wiring
10/05/2025Permit IssuedRM ELECTRIC CO., INC.General Wiring
10/18/2022Complete5 J'S ELECTL CONTS CORP—
06/21/2021CompleteNEW PHASE ELEC'L CONTR'S1 meters
1 project · most recent 09/29/2022
Steel
FiledStatusContractorScope
09/29/2022Permit IssuedALL OVER CONSTRUCTION CORSteel
1 project · most recent 09/16/2019
Scaffold
FiledStatusContractorScope
09/16/2019Permit IssuedALL OVER CONSTRUCTION CORScaffold
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/26/2024Pass-Final Boiler Equipment InspectionPassView ↗
01/07/2022Pass-Final Boiler Equipment InspectionPassView ↗
06/30/2021Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
07/01/2026Energy Code Compliance InspectionsJICHEN SUNprogress
07/01/2026HVAC-R and service water piping design and insulationJICHEN SUNenergy_progress
07/01/2026HVAC-R and service water heating system controlsJICHEN SUNenergy_progress
07/01/2026HVAC-R and service water heating equipmentJICHEN SUNenergy_progress
06/23/2026Interior lighting powerJICHEN SUNenergy_progress
06/23/2026Fire-Resistant Penetrations and JointsJICHEN SUNspecial
06/23/2026Fenestration and door U-factor and product ratingsJICHEN SUNenergy_progress
06/23/2026Fenestration areasJICHEN SUNenergy_progress
06/23/2026Fire-Resistance Rated ConstructionJICHEN SUNprogress
06/23/2026Energy Code Compliance InspectionsJICHEN SUNprogress
06/23/2026Fenestration air leakageJICHEN SUNenergy_progress
06/24/2025FinalHoward Zimmermanprogress
06/24/2025Structural Stability – Alterations of existing buildingsHoward Zimmermanspecial
06/24/2025MasonryHoward Zimmermanspecial
06/24/2025Construction Operations Influencing Adjacent StructuresHoward Zimmermanspecial
02/26/2024HVAC-R and service water heating system controlsManmohan Siwanenergy_progress
02/26/2024HVAC-R and service water heating equipmentManmohan Siwanenergy_progress
02/26/2024HVAC-R and service water piping design and insulationManmohan Siwanenergy_progress
02/26/2024Shutoff dampersManmohan Siwanenergy_progress
02/26/2024Maintenance informationManmohan Siwanenergy_progress
02/13/2024Energy Code Compliance InspectionsManmohan Siwanprogress
02/12/2024Mechanical SystemsManmohan Siwanspecial
02/12/2024FinalManmohan Siwanprogress
10/31/2022Mechanical SystemsWalter Gormanspecial
10/31/2022HVAC-R and service water piping design and insulationWalter Gormanenergy_progress
Latest 25 of 54.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Jazz Foundation of AmericaOfficeFloor 2
Project M01004613 Alteration · LOC Issued · 03/31/2024
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 449 on file (BIS + DOB NOW)
▸Plans & Drawings29
▸DOB NOWPlans/Sketch21
09/03/2026M00526293-I1Request digital key ↗
09/03/2026M00565128-I1Request digital key ↗
09/03/2026M00565331-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
09/05/2026M00329278-I1Request digital key ↗
09/04/2026M00437635-I1Request digital key ↗
09/04/2026M00433971-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/05/2026M00266365-I1Request digital key ↗
08/15/2026M00266365-P2Request digital key ↗
08/15/2026M00266365-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00228216-I1Request digital key ↗
▸Applications & Permits65
▸BISWORK PERMIT APPLICATION33
01/24/2020123700815Open ↗
08/26/2019140864740Open ↗
08/14/2018123201347Open ↗
Showing 3 of 33 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION27
01/24/2020123700815Open ↗
11/25/2019123771418Open ↗
08/26/2019140864740Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit5
09/04/2026M00433971-I1Open ↗
08/13/2026M00565128-I1Open ↗
08/13/2026M00329278-I1Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications136
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION39
01/24/2020123700815Open ↗
01/24/2020123700815Open ↗
11/25/2019123771418Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWProgress Inspector Seal & Signature27
09/23/2026M00614135-I1Open ↗
09/23/2026M00526293-I1Open ↗
08/31/2026M01004613-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature26
09/05/2026M00266365-I1Open ↗
09/05/2026M00329278-I1Open ↗
09/04/2026M00433971-I1Open ↗
Showing 3 of 26 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST16
01/24/2020123700815Open ↗
11/25/2019123771418Open ↗
06/26/2018123201347Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM9
01/04/2013121422086Open ↗
11/01/2011120871949Open ↗
08/11/2011120770692Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
08/31/2026M01004613-I1Open ↗
08/28/2026M08037285-I1Open ↗
08/26/2026M01421135-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
01/24/2020123700815Open ↗
11/25/2019123771418Open ↗
08/26/2019140864740Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/26/2019140864740Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/26/2019140864740Open ↗
▸Trade Schedules & Equipment34
▸BISSELF-CERT PLUMBING NOTICE11
08/21/2014122035234Open ↗
08/19/2014122035234Open ↗
04/17/2014121931446Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE B - PLUMBING5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION4
08/19/2014122035234Open ↗
04/17/2014121931446Open ↗
10/08/2011120757369Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
06/18/2014122035234Open ↗
03/03/2014121931446Open ↗
Showing 2 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
12/18/2015122619782Open ↗
06/18/2014122035234Open ↗
03/03/2014121931446Open ↗
▸BISEQUIPMENT USE PERMITS3
12/15/2016122619782Open ↗
12/15/2016122619782Open ↗
Showing 2 of 3 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
12/15/2016122619782Open ↗
Showing 1 of 3 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
01/19/2012110186138Open ↗
▸Safety & Tenant Protection25
▸DOB NOWHPD-1: Anti-Harassment Area Checklist18
09/05/2026M00266365-I1Open ↗
09/04/2026M00433971-I1Open ↗
09/03/2026M00565331-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWCertificate of No Harassment4
09/04/2026M00433971-I1Open ↗
08/13/2026M00444772-I1Open ↗
08/13/2026M00437635-I1Open ↗
Showing 3 of 4 on file for this type
▸BISANTI-HARASSMENT CHECKLIST3
11/25/2019123771418Open ↗
06/26/2018123201347Open ↗
12/18/2015122619782Open ↗
▸Environmental & Asbestos35
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
09/05/2026M00266365-I1Open ↗
09/05/2026M00329278-I1Open ↗
09/03/2026M00565128-I1Open ↗
Showing 3 of 11 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'9
08/11/2011120770692Open ↗
Showing 1 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
01/24/2020123700815Open ↗
11/25/2019123771418Open ↗
08/26/2019140864740Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
03/03/2014121931446Open ↗
03/03/2014121931446Open ↗
11/01/2011120871949Open ↗
Showing 3 of 4 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
01/03/2013121422086Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/23/2026M08037285-I1Open ↗
▸Energy Compliance37
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS13
01/24/2020123700815Open ↗
11/26/2019123771418Open ↗
06/26/2018123201347Open ↗
Showing 3 of 13 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
11/13/2020123700815Open ↗
12/01/2016122619782Open ↗
10/28/2014122035234Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY7
09/13/2011120771575Open ↗
Showing 1 of 7 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.7
09/04/2026M00433971-I1Open ↗
09/03/2026M00565331-I1Open ↗
09/03/2026M00614135-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/26/2019140864740Open ↗
▸BISTR8: Energy Code Progress Inspections1
01/04/2013121422086Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/26/2019140864740Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
11/13/2020123700815Open ↗
11/13/2020123700815Open ↗
08/26/2019140864740Open ↗
▸Approvals, Objections & Sign-offs27
▸BISADMINISTRATIVE OBJECTIONS11
12/03/2013121767686Open ↗
01/04/2013121422086Open ↗
11/01/2011120871949Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
11/13/2020123700815Open ↗
12/01/2016122619782Open ↗
10/28/2014122035234Open ↗
Showing 3 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
10/28/2014122035234Open ↗
03/27/2014120757369Open ↗
07/31/2012120871949Open ↗
▸BISSHED LETTER1
03/30/2012120668651Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/23/2026M08037285-I1Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026M01004613-I1Open ↗
▸Cost, Insurance & Ownership26
▸BISCOST AFFIDAVIT26
11/13/2020123700815Open ↗
01/24/2020123700815Open ↗
11/25/2019123771418Open ↗
Showing 3 of 26 on file for this type
▸Filing & Intake Forms25
▸BISEFILING COVER SHEET20
01/24/2020123700815Open ↗
11/25/2019123771418Open ↗
06/26/2018123201347Open ↗
Showing 3 of 20 on file for this type
▸BISADDITIONAL INFORMATION4
06/29/2017110186129Open ↗
03/05/2014121767686Open ↗
07/26/2012120654112Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
08/26/2019140864740Open ↗
▸Other Documents7
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
09/30/2011120384912Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWManufacturer's Specifications2
08/26/2026M01024295-I1Open ↗
08/13/2026M01024295-P1Open ↗
▸DOB NOWCalculations2
08/26/2026M01024295-I1Open ↗
08/13/2026M01024295-P1Open ↗
▸DOB NOWIRA Certification1
08/13/2026M01300380-I1Open ↗