← Back
Two family converted from one family
2470 WENNER PLACE
BRONX · BIN 2080274
💬 Discuss this project
1920Year Built
2Stories
B3Building Class
R4AZoning
2,490 sfGross Floor Area
2Units
1 Open Violation ▸
Two family converted from one family · 4,200 sf lot · 0.59 FAR built · Flood zone X
Locations of Work
ArchitectureCivil
Floor 21 filing · 20 docs
Floor 11 filing · 20 docs
Cellar1p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/10/2017$462K—— → —$186/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TABRIZ GROUP ENTERPRISES212/19/2023
TABRIZ DESIGN GROUP306/05/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TABRIZ DESIGN GROUP503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROCK E SMALL PLBG&HTG INCPlumbing507/08/2026
HUNT B CONSTRUCTION INCGeneral Contractor203/21/2026
DIOGENES BRITOElectrical103/21/2026
DRM CONSTRUCTION CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TABRIZ GROUP ENTERPRISES3275212/19/2023
Building Lifecycle
All (61)Filed (5)Permit Issued (3)Signed Off (2)Violation (1)Inspection (6)Objection (14)Special Inspection (30)
08/03/2026
Violation issued (HPD, open)
B
01/23/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/15/2024
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH ALT 1 APP # X00854483. (The 3-fixture bathroom statement is mentioned in the comment section of the Certificate of Occupancy as BB 2011-10 part (C. Filing)(b))
X00862412-I1
01/05/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/20/2023
Special inspection requirement — Air barrier — testing
BAKHTIAR SHAMLOO
12/20/2023
Special inspection requirement — Subgrade Inspections
BAKHTIAR SHAMLOO
12/20/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
12/20/2023
Special inspection requirement — Mechanical Systems
BAKHTIAR SHAMLOO
12/20/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
12/20/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
BAKHTIAR SHAMLOO
12/20/2023
Special inspection requirement — Concrete - Cast-In-Place
BAKHTIAR SHAMLOO
12/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
12/20/2023
Special inspection requirement — Footing and Foundation
BAKHTIAR SHAMLOO
12/20/2023
Special inspection requirement — Energy Code Compliance Inspections
BAKHTIAR SHAMLOO
12/20/2023
Special inspection requirement — Final
HARI SONI
12/20/2023
Special inspection requirement — Structural Wood Frame
BAKHTIAR SHAMLOO
12/20/2023
Special inspection requirement — Fire-Resistance Rated Construction
BAKHTIAR SHAMLOO
12/20/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
BAKHTIAR SHAMLOO
12/20/2023
Special inspection requirement — Insulation placement and R values
BAKHTIAR SHAMLOO
12/20/2023
Special inspection requirement — Fenestration air leakage
BAKHTIAR SHAMLOO
12/20/2023
Special inspection requirement — Fenestration areas
BAKHTIAR SHAMLOO
12/20/2023
Special inspection requirement — Maintenance information
BAKHTIAR SHAMLOO
12/20/2023
Special inspection requirement — HVAC-R and service water heating equipment
BAKHTIAR SHAMLOO
12/20/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
BAKHTIAR SHAMLOO
12/20/2023
Special inspection requirement — Interior lighting power
BAKHTIAR SHAMLOO
12/20/2023
Special inspection requirement — Permanent certificate
BAKHTIAR SHAMLOO
12/20/2023
Special inspection requirement — Air barrier - visual inspection
BAKHTIAR SHAMLOO
12/20/2023
Special inspection requirement — HVAC-R and service water heating system controls
BAKHTIAR SHAMLOO
12/20/2023
Special inspection requirement — Metering
BAKHTIAR SHAMLOO
12/19/2023
Filed — Alteration CO
PROPOSED HORIZONTAL ENLARGEMENT, FULL INTERIOR AND EXTERIOR RENOVATION, AND CONVERSION TO TWO-FAMILY.
X00854483-P1
12/14/2023
Signed off — Alteration
X00862413-I1
12/05/2023
Special inspection requirement — Concrete - Cast-In-Place
BAKHTIAR SHAMLOO
12/05/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
BAKHTIAR SHAMLOO
12/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
12/05/2023
Special inspection requirement — Mechanical Systems
BAKHTIAR SHAMLOO
12/05/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
11/21/2023
Permit issued — Earth Work
X00854483-I1-GC-CX
10/13/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
10/13/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/29/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/29/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/19/2023
Permit issued — Plumbing
X00862412-I1-PL
06/27/2023
Permit issued — Construction Fence
X00862413-I1-FN
06/05/2023
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH ALT 1 APP # X00854483. (The 3-fixture bathroom statement is mentioned in the comment section of the Certificate of Occupancy as BB 2011-10 part (C. Filing)(b))
X00862412-I1
06/05/2023
Filed — Alteration
X00862413-I1
06/04/2023
Objection resolved — Addressed
06/01/2023
Filed — Alteration
X00878458-I1
05/25/2023
Objection resolved — Addressed
05/25/2023
Objection resolved — Addressed
05/25/2023
Objection resolved — Addressed
05/25/2023
Objection resolved — Addressed
05/20/2023
Objection resolved — Addressed
05/20/2023
Objection resolved — Addressed
05/18/2023
Objection raised — Scope
05/18/2023
Objection raised — Admin
05/18/2023
Objection raised — Fire_Protection
05/18/2023
Objection raised — Other
05/18/2023
Objection raised — Other
05/18/2023
Objection raised — Other
05/18/2023
Objection raised — Energy
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWEarth WorkPermit IssuedHUNT B CONSTRUCTION INC11/21/2023
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC09/19/2023
DOB NOWConstruction FenceSigned-offDRM CONSTRUCTION CORP06/27/2023
BISEQISSUEDC.J.B. EQUIPMENT CORP03/26/2004
BIS—ISSUEDC.J.B. EQUIPMENT CORP03/26/2004
BIS—ISSUEDC.J.B. EQUIPMENT CORP03/26/2004
BISOTISSUEDN/A08/05/1993
1 project · most recent 12/19/2023
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/19/2023Permit IssuedHUNT B CONSTRUCTION INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Goodman GOODMAN GSZB403610AA 5 tons · Split System ×2
Ventilation
Delta Breeze DELTA BREEZ MODEL # SLM70 300 CFM · Kitchen Exhaust ×2
2 projects · most recent 12/13/2023
General Wiring
FiledStatusContractorScope
12/13/2023CompleteREDGRAVE ELECTL MAINTNCEGeneral Wiring
12/13/2023CompleteREDGRAVE ELECTL MAINTNCE—
1 project · most recent 12/19/2023
FiledStatusContractorScope
12/19/2023Permit IssuedHUNT B CONSTRUCTION INC2 scope_items
1 project · most recent 12/19/2023
Earthwork
FiledStatusContractorScope
12/19/2023Permit IssuedHUNT B CONSTRUCTION INCEarthwork
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
01/23/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/05/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/13/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
10/13/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/29/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/29/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
12/20/2023Air barrier — testing BAKHTIAR SHAMLOOenergy_progress
12/20/2023Subgrade InspectionsBAKHTIAR SHAMLOOspecial
12/20/2023Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
12/20/2023Mechanical SystemsBAKHTIAR SHAMLOOspecial
12/20/2023Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
12/20/2023Excavations - Sheeting, Shoring, and BracingBAKHTIAR SHAMLOOspecial
12/20/2023Concrete - Cast-In-PlaceBAKHTIAR SHAMLOOspecial
12/20/2023Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
12/20/2023Footing and FoundationBAKHTIAR SHAMLOOprogress
12/20/2023Energy Code Compliance InspectionsBAKHTIAR SHAMLOOprogress
12/20/2023FinalHARI SONIprogress
12/20/2023Structural Wood FrameBAKHTIAR SHAMLOOprogress
12/20/2023Fire-Resistance Rated ConstructionBAKHTIAR SHAMLOOprogress
12/20/2023Fenestration and door U-factor and product ratingsBAKHTIAR SHAMLOOenergy_progress
12/20/2023Insulation placement and R valuesBAKHTIAR SHAMLOOenergy_progress
12/20/2023Fenestration air leakageBAKHTIAR SHAMLOOenergy_progress
12/20/2023Fenestration areasBAKHTIAR SHAMLOOenergy_progress
12/20/2023Maintenance informationBAKHTIAR SHAMLOOenergy_progress
12/20/2023HVAC-R and service water heating equipmentBAKHTIAR SHAMLOOenergy_progress
12/20/2023HVAC-R and service water piping design and insulationBAKHTIAR SHAMLOOenergy_progress
12/20/2023Interior lighting powerBAKHTIAR SHAMLOOenergy_progress
12/20/2023Permanent certificateBAKHTIAR SHAMLOOenergy_progress
12/20/2023Air barrier - visual inspectionBAKHTIAR SHAMLOOenergy_progress
12/20/2023HVAC-R and service water heating system controlsBAKHTIAR SHAMLOOenergy_progress
12/20/2023MeteringBAKHTIAR SHAMLOOenergy_progress
Latest 25 of 50.
▾Documents — 55 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/23/2026X00878458-I1Request digital key ↗
08/23/2026X00862413-I1Request digital key ↗
08/23/2026X00862412-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
09/10/2019220711512Open ↗
07/30/2019220711512Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026X00854483-I1Open ↗
08/13/2026X00854483-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026X00854483-P1Open ↗
08/13/2026X00854483-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00854483-I1Open ↗
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026X00854483-P1Open ↗
09/01/2026X00854483-P1Open ↗
09/01/2026X00854483-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/23/2026X00878458-I1Open ↗
08/23/2026X00862413-I1Open ↗
08/23/2026X00862412-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026X00854483-P1Open ↗
09/01/2026X00854483-P1Open ↗
08/23/2026X00854483-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/30/2019220711512Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
07/30/2019220711512Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist2
08/21/2026X00854483-P1Open ↗
08/14/2026X00854483-I1Open ↗
▸BISTenant Protection Plan and Notes1
07/30/2019220711512Open ↗
▸BISSTREET TREE CHECKLIST1
07/30/2019220711512Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/23/2026X00862412-I1Open ↗
08/21/2026X00854483-P1Open ↗
08/14/2026X00854483-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/30/2019220711512Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/30/2019220711512Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026X00854483-I1Open ↗
08/13/2026X00854483-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X00854483-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
07/30/2019220711512Open ↗
▸Filing & Intake Forms3
▸DOB NOWAI1 Form2
08/13/2026X00854483-P1Open ↗
08/13/2026X00854483-I1Open ↗
▸BISEFILING COVER SHEET1
07/30/2019220711512Open ↗
▸Other Documents10
▸DOB NOWProperty Ownership Certification2
08/21/2026X00854483-P1Open ↗
08/14/2026X00854483-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026X00854483-I1Open ↗
08/13/2026X00854483-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026X00854483-P1Open ↗
08/13/2026X00854483-I1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026X00854483-I1Open ↗
08/13/2026X00854483-P1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X00854483-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00854483-I1Open ↗