← Back
Walk-up apt, over six families with stores
2473 ADAM C POWELL BLVD
MANHATTAN · Harlem (North) · BIN 1060156
💬 Discuss this project
1920Year Built
5Stories
C7Building Class
R7-2Zoning
13,168 sfGross Floor Area
15Units
Rent Stabilized17 Open Violations ▸
Walk-up apt, over six families with stores · Owner of record: NYC HOUSING AUTHORITY · 3,800 sf lot · 3.47 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction14p · 1 filing · 20 docs
Floor 5Under Construction10p · 1 filing · 20 docs
Floor 4Under Construction9p · 1 filing · 20 docs
Floor 3Under Construction12p · 1 filing · 20 docs
Floor 2Under Construction9p · 1 filing · 20 docs
Floor 1Under Construction9p · 1 filing · 20 docs
CellarUnder Construction16p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK CITY HOUSING AUTHORITY2108/14/2026
NYC HOUSING AUTHORITY203/22/2026
BAS COMMUNICATION INC103/21/2026
NYCHA103/21/2026
SAM CITY MASTER TENANT LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EMTG CONSULTANTS INC808/05/2026
WELLWORTH CONSULTING LLC110/04/2024
GACE DPC103/22/2024
SLM ARCHITECTURE, P.C.103/21/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
UNITED SAFETY CONSULTANTS103/21/2026
JM ZONING, LLC.1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CEGF & G PLUMBING CORPPlumbing707/08/2026
PREMIER CONSTRUCTION INCGeneral Contractor507/08/2026
DUAL FUEL PLUBING & HTINGPlumbing507/08/2026
SPRING SCAFFOLDING LLCGeneral Contractor504/10/2026
DUAL FUEL COMPANY LLCGeneral Contractor407/08/2026
MONADNOCK GEN'L CONT INCGeneral Contractor308/14/2026
CLIFTON WALDRONElectrical103/21/2026
BELL CONSTRUCTION SVCSGeneral Contractor107/08/2026
MARK REYESElectrical103/21/2026
JEROME GORDONElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MILROSE CONSULTANTS LLC20031208/05/2026
Building Lifecycle
All (111)Filed (12)Permit Issued (18)Signed Off (3)Violation (32)Inspection (8)Objection (8)Special Inspection (30)
09/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/03/2026
Special inspection requirement — Mechanical Systems
Christopher Drutjons
09/03/2026
Special inspection requirement — Heating Systems
Christopher Drutjons
09/03/2026
Special inspection requirement — Post-installed Anchors
Christopher Drutjons
09/03/2026
Special inspection requirement — Energy Code Compliance Inspections
Christopher Drutjons
09/03/2026
Special inspection requirement — Final
Christopher Drutjons
09/03/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
09/03/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Drutjons
09/03/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Drutjons
09/03/2026
Special inspection requirement — Maintenance information
Christopher Drutjons
09/03/2026
Special inspection requirement — Permanent certificate
Christopher Drutjons
09/03/2026
Special inspection requirement — Shutoff dampers
Christopher Drutjons
08/13/2026
Permit issued — General Construction
M00882395-I1-GC
08/05/2026
Filed — Alteration
INTERIOR RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: DIRECT REPLACEMENT OF FINISHES THROUGHOUT, DIRECT REPLACEMENT OF KITCHEN, BATHROOM, DOORS AND WINDOWS. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
M00882395-P4
07/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/06/2026
Permit issued — Suspended Scaffold
M01251450-I1-SC
06/22/2026
Permit issued — General Construction
M00882395-S1-GC
05/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
05/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
05/29/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Drutjons
05/29/2026
Special inspection requirement — Maintenance information
Christopher Drutjons
05/29/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Drutjons
05/29/2026
Special inspection requirement — Permanent certificate
Christopher Drutjons
05/29/2026
Special inspection requirement — Energy Code Compliance Inspections
Christopher Drutjons
05/29/2026
Special inspection requirement — Post-installed Anchors
Christopher Drutjons
05/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
Christopher Drutjons
05/26/2026
Filed — Alteration
INTERIOR RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: DIRECT REPLACEMENT OF FINISHES THROUGHOUT, DIRECT REPLACEMENT OF KITCHEN, BATHROOM, DOORS AND WINDOWS. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
M00882395-P3
05/13/2026
Permit issued — Mechanical Systems
M00882395-S3-MS
05/12/2026
Special inspection requirement — Maintenance information
Christopher Drutjons
05/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
05/12/2026
Special inspection requirement — Post-installed Anchors
Christopher Drutjons
05/12/2026
Special inspection requirement — Energy Code Compliance Inspections
Christopher Drutjons
05/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
05/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Drutjons
05/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Drutjons
05/12/2026
Special inspection requirement — Permanent certificate
Christopher Drutjons
05/05/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY. THE SIDEWALK SHED AT THE FRONT OF THE BUILDING ON ADAM CLAYTON POWELL BLVD.
M01121727-I1
04/29/2026
Violation issued (HPD, closed)
A
04/07/2026
Signed off — Alteration
INTERIOR RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: DIRECT REPLACEMENT OF FINISHES THROUGHOUT, DIRECT REPLACEMENT OF KITCHEN, BATHROOM, DOORS AND WINDOWS. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
M00882395-S4
03/30/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/17/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/09/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/03/2026
Permit issued — Sidewalk Shed
M01121727-I1-SH
02/04/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/14/2026
Signed off — Alteration
INTERIOR RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: DIRECT REPLACEMENT OF FINISHES THROUGHOUT, DIRECT REPLACEMENT OF KITCHEN, BATHROOM, DOORS AND WINDOWS. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
M00882395-S2
01/07/2026
Permit issued — Plumbing
M00882395-S5-PL
01/05/2026
Permit issued — Boiler Equipment
M00882395-S4-BE
01/05/2026
Permit issued — Mechanical Systems
M00882395-S3-MS
12/20/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
12/20/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/09/2025
Filed — Alteration
INTERIOR RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: DIRECT REPLACEMENT OF FINISHES THROUGHOUT, DIRECT REPLACEMENT OF KITCHEN, BATHROOM, DOORS AND WINDOWS. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
M00882395-P2
12/03/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
11/17/2025
Violation issued (HPD, closed)
I
10/01/2025
Permit issued — Sidewalk Shed
M01121727-I1-SH
09/16/2025
Violation issued (HPD, closed)
C
09/09/2025
Permit issued — General Construction
M00882395-I1-GC
08/25/2025
Violation issued (HPD, closed)
C
08/11/2025
Filed — Alteration
INTERIOR RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: DIRECT REPLACEMENT OF FINISHES THROUGHOUT, DIRECT REPLACEMENT OF KITCHEN, BATHROOM, DOORS AND WINDOWS. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
M00882395-P1
07/09/2025
Permit issued — Suspended Scaffold
M01251450-I1-SC
Latest 60 of 111 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMONADNOCK GEN'L CONT INC08/13/2026
DOB NOWSuspended ScaffoldPermit IssuedPREMIER CONSTRUCTION INC07/06/2026
DOB NOWGeneral ConstructionSigned-offPREMIER CONSTRUCTION INC06/22/2026
DOB NOWMechanical SystemsPermit IssuedBELL CONSTRUCTION SVCS05/13/2026
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC03/03/2026
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING01/07/2026
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING01/05/2026
DOB NOWMechanical SystemsPermit IssuedDUAL FUEL COMPANY LLC01/05/2026
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC10/01/2025
DOB NOWGeneral ConstructionSigned-offMONADNOCK GEN'L CONT INC09/09/2025
DOB NOWSuspended ScaffoldPermit IssuedPREMIER CONSTRUCTION INC07/09/2025
DOB NOWGeneral ConstructionSigned-offPREMIER CONSTRUCTION INC06/26/2025
DOB NOWMechanical SystemsPermit IssuedDUAL FUEL COMPANY LLC03/05/2025
DOB NOWPlumbingSigned-offBELL CONST SERV INC01/30/2025
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING01/09/2025
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING01/09/2025
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC10/04/2024
DOB NOWGeneral ConstructionSigned-offMONADNOCK GEN'L CONT INC10/01/2024
BISBLISSUEDCRESCENT CONTRACTING08/21/2002
BISPLISSUEDLEROY WILLIAMS PLG & HTG03/11/1993
BISOTISSUEDCHARLES MAFFO02/08/1993
1 project · most recent 08/05/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/05/2026Signed-offMONADNOCK GEN'L CONT INCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PUY-AH24NL 24,500 BTU · Condensing Unit ×1
PUZ-HA24NHAI 24,000 BTU · Condensing Unit ×1
1 project · most recent 08/05/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/05/2026Signed-offDUAL FUEL PLUBING & HTINGGas, Storm, Water/Sanitary
5 projects · most recent 05/19/2026
General Wiring Boiler Controls
FiledStatusContractorScope
05/19/2026Permit IssuedCONDE ELECTRIC INCGeneral Wiring
12/15/2025CompleteSTX ELECTRICAL CORPBoiler Controls
12/11/2024Permit IssuedGOTHAM TECHNICAL SERVICESGeneral Wiring
10/04/2024Permit IssuedTOP SHELF ELECTRIC CORP—
09/18/2020CompleteHERTZ ELECTRIC LLC—
1 project · most recent 07/04/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
07/04/2025Permit IssuedPREMIER CONSTRUCTION INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
07/22/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/30/2026Pass-Final Boiler Equipment InspectionPassView ↗
03/17/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/09/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/04/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/20/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
12/20/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/03/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 60
DateRequirementInspectorRole
09/03/2026Tenant Protection Plan Compliance—special
09/03/2026Mechanical SystemsChristopher Drutjonsspecial
09/03/2026Heating SystemsChristopher Drutjonsspecial
09/03/2026Post-installed AnchorsChristopher Drutjonsspecial
09/03/2026Energy Code Compliance InspectionsChristopher Drutjonsprogress
09/03/2026FinalChristopher Drutjonsprogress
09/03/2026HVAC-R and service water piping design and insulationChristopher Drutjonsenergy_progress
09/03/2026HVAC-R and service water heating system controlsChristopher Drutjonsenergy_progress
09/03/2026HVAC-R and service water heating equipmentChristopher Drutjonsenergy_progress
09/03/2026Maintenance informationChristopher Drutjonsenergy_progress
09/03/2026Permanent certificateChristopher Drutjonsenergy_progress
09/03/2026Shutoff dampersChristopher Drutjonsenergy_progress
05/29/2026Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
05/29/2026HVAC-R and service water piping design and insulationChristopher Drutjonsenergy_progress
05/29/2026HVAC-R and service water heating equipmentChristopher Drutjonsenergy_progress
05/29/2026Maintenance informationChristopher Drutjonsenergy_progress
05/29/2026HVAC-R and service water heating system controlsChristopher Drutjonsenergy_progress
05/29/2026Permanent certificateChristopher Drutjonsenergy_progress
05/29/2026Energy Code Compliance InspectionsChristopher Drutjonsprogress
05/29/2026Post-installed AnchorsChristopher Drutjonsspecial
05/29/2026Tenant Protection Plan ComplianceChristopher Drutjonsspecial
05/12/2026Maintenance informationChristopher Drutjonsenergy_progress
05/12/2026Tenant Protection Plan Compliance—special
05/12/2026Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
05/12/2026Post-installed AnchorsChristopher Drutjonsspecial
Latest 25 of 60.
▾Documents — 65 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/26/2026M01121727-I1Request digital key ↗
08/23/2026M01251450-I1Request digital key ↗
08/22/2026M00882395-S2Request digital key ↗
Showing 3 of 12 on file for this type
▸Seals & Professional Certifications31
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/22/2026M00882395-S2Open ↗
08/22/2026M00882395-S1Open ↗
08/22/2026M00882395-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/06/2026M00882395-S3Open ↗
09/06/2026M00882395-S3Open ↗
09/05/2026M00882395-S5Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/06/2026M00882395-S3Open ↗
09/05/2026M00882395-S5Open ↗
09/05/2026M00882395-S5Open ↗
Showing 3 of 10 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/22/2026M00882395-S1Open ↗
08/22/2026M00882395-I1Open ↗
08/22/2026M00882395-P4Open ↗
Showing 3 of 10 on file for this type
▸Approvals, Objections & Sign-offs10
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
08/22/2026M00882395-P4Open ↗
08/22/2026M00882395-P3Open ↗
08/13/2026M00882395-I1Open ↗
Showing 3 of 10 on file for this type
▸Other Documents2
▸DOB NOWManufacturer's Specifications1
08/13/2026M01251450-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01251450-I1Open ↗