← Back
Over six families without stores
2474 MARION AVENUE
BRONX · BIN 2011067
💬 Discuss this project
1911Year Built
6Stories
C1Building Class
R7-1Zoning
25,025 sfGross Floor Area
25Units
LL97 CoveredRent Stabilized17 Open Violations ▸FISP: SAFEFDNY Report ↗
Over six families without stores · Owner of record: MOUNT HOPE PRESERVATION APARTMENTS 1A · 5,390 sf lot · 4.64 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbing
Roof1p · 1 filing · 17 docs
Cellar1p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ADVANCED CONSTRUCTION EQUIPMENT COR407/08/2026
ACE GROUP NY407/08/2026
MONADNOCK DEVELOPMENT104/21/2026
MONODNACK PROPERTY MANAGEMENT304/09/2026
MOUNT HOPE PRESERVATION APARTMENTS 1A103/22/2026
POWERS CONST. CO.103/22/2026
VALUE CONSTRUCTION BX203/21/2026
ST JOHNS UNIVERSITY703/21/2026
MOUNT HOPE PRESERVATION APARTMENTS LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EOC-NY204/17/2026
FAZAL BANGASH108/19/2025
M. HAMDI GUNAL, PE, P. C.511/19/2020
JOEL PHAGOO P.E. PLLC106/29/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CSR EXPEDITERS503/21/2026
A1 EXPEDITING SERVICE203/21/2026
MMSR CONSULTING GROUP LLC203/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ADVANCED CONSTRUCTION EQUIPMENTGeneral Contractor407/08/2026
FERNANDEZ HTG & MECH CORP.Plumbing207/08/2026
ALEXANDER EUGENEElectrical103/21/2026
ACE GROUP NY CORPGeneral Contractor107/08/2026
ANNEX ENTERPRISE, INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EOC-NY6548204/17/2026
M. HAMDI GUNAL, PE, P.C.3000511/19/2020
Building Lifecycle
All (103)Filed (9)Permit Issued (6)Signed Off (3)Facade (FISP) (3)Violation (60)Inspection (1)Special Inspection (21)
08/27/2026
Cycle 10 facade report signed — SAFE
08/07/2026
Cycle 10 facade inspection completed
07/01/2026
Violation issued (ECB, open)
Construction
04/17/2026
Filed — Alteration
PROPOSED FACADE RESTORATION AS PER PLANS NO CHANGE TO USE EGRESS OR OCCUPANCY.
X01217529-P1
04/17/2026
Special inspection requirement — Post-installed Anchors
David Merabyan
04/17/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
David Merabyan
04/17/2026
Special inspection requirement — Tenant Protection Plan Compliance
SHAHRIAR QUAYYUM
04/17/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
David Merabyan
04/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Merabyan
04/17/2026
Special inspection requirement — Final
David Merabyan
04/17/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
David Merabyan
04/16/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
David Merabyan
04/16/2026
Special inspection requirement — Final
David Merabyan
04/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/16/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
David Merabyan
04/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
David Merabyan
04/16/2026
Special inspection requirement — Post-installed Anchors
David Merabyan
04/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Merabyan
12/11/2025
Cycle 10 facade report submitted
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/06/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/02/2025
Permit issued — General Construction
X01217529-I1-GC
08/20/2025
Permit issued — Sidewalk Shed
X01273862-I1-SH
08/19/2025
Filed — Alteration
X01273862-I1
05/01/2025
Filed — Alteration
PROPOSED FACADE RESTORATION AS PER PLANS NO CHANGE TO USE EGRESS OR OCCUPANCY.
X01217529-I1
01/03/2025
Violation issued (HPD, closed)
C
12/26/2024
Violation issued (HPD, closed)
B
12/26/2024
Violation issued (HPD, open)
A
12/26/2024
Violation issued (HPD, closed)
B
09/07/2023
Violation issued (HPD, closed)
C
09/07/2023
Violation issued (HPD, closed)
A
09/07/2023
Violation issued (HPD, closed)
A
09/07/2023
Violation issued (HPD, closed)
A
09/07/2023
Violation issued (HPD, closed)
A
09/07/2023
Violation issued (HPD, closed)
A
09/07/2023
Violation issued (HPD, closed)
A
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/27/2023
Violation issued (HPD, closed)
B
02/10/2023
Violation issued (HPD, open)
B
02/10/2023
Violation issued (HPD, open)
B
12/20/2022
Violation issued (HPD, closed)
B
12/20/2022
Violation issued (HPD, closed)
B
07/13/2022
Violation issued (HPD, closed)
A
07/13/2022
Violation issued (HPD, open)
C
07/13/2022
Violation issued (HPD, closed)
B
07/13/2022
Violation issued (HPD, closed)
B
05/27/2022
Violation issued (HPD, open)
A
05/27/2022
Violation issued (HPD, open)
B
05/27/2022
Violation issued (HPD, closed)
B
05/27/2022
Violation issued (HPD, closed)
B
05/27/2022
Violation issued (HPD, closed)
C
03/15/2022
Violation issued (HPD, closed)
C
03/15/2022
Violation issued (HPD, closed)
B
03/15/2022
Violation issued (HPD, closed)
B
03/15/2022
Violation issued (HPD, closed)
C
03/15/2022
Violation issued (HPD, closed)
C
03/15/2022
Violation issued (HPD, closed)
C
03/15/2022
Violation issued (HPD, closed)
C
Latest 60 of 103 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedANNEX ENTERPRISE, INC09/02/2025
DOB NOWSidewalk ShedPermit IssuedACE GROUP NY CORP08/20/2025
DOB NOWPlumbingSigned-offFERNANDEZ HTG & MECH CORP.09/29/2020
DOB NOWBoiler EquipmentPermit IssuedFERNANDEZ HTG & MECH CORP.09/15/2020
DOB NOWSidewalk ShedSigned-offADVANCED CONSTRUCTION EQU11/05/2018
DOB NOWSidewalk ShedSigned-offADVANCED CONSTRUCTION EQU06/29/2018
BISOTISSUEDNOTIAS CONSTRUCTION INC07/28/2020
BISPLISSUEDFERNANDEZ HTG & MECH CORP.06/26/2020
BISOTISSUEDNOTIAS CONSTRUCTION INC03/27/2020
BISOTISSUEDNOTIAS CONSTRUCTION INC03/29/2019
BISOTISSUEDNOTIAS CONSTRUCTION INC08/02/2018
BISPLISSUEDFERNANDEZ HTG & MECH CORP.05/17/2018
BISOTISSUEDNOTIAS CONSTRUCTION INC12/15/2017
BISOTISSUEDVALUE CONSTRUCTION BX, IN06/27/2016
3 projects · most recent 08/29/2025
General Wiring
FiledStatusContractorScope
08/29/2025Permit IssuedHIGH QUALITY ELEC.OF NYC—
06/08/2018CompleteTECHNO-VOLT ELEC, INCGeneral Wiring
05/17/2018CompleteNASH ELECTRIC SERVICES IN—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
10/06/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
04/17/2026Post-installed AnchorsDavid Merabyanspecial
04/17/2026Structural Stability – Alterations of existing buildingsDavid Merabyanspecial
04/17/2026Tenant Protection Plan ComplianceSHAHRIAR QUAYYUMspecial
04/17/2026Wall Panels, Curtain Walls, and VeneersDavid Merabyanspecial
04/17/2026Fire-Resistant Penetrations and JointsDavid Merabyanspecial
04/17/2026FinalDavid Merabyanprogress
04/17/2026Exterior Insulation and Finish Systems (EIFS)David Merabyanspecial
04/16/2026Exterior Insulation and Finish Systems (EIFS)David Merabyanspecial
04/16/2026FinalDavid Merabyanprogress
04/16/2026Tenant Protection Plan Compliance—special
04/16/2026Wall Panels, Curtain Walls, and VeneersDavid Merabyanspecial
04/16/2026Structural Stability – Alterations of existing buildingsDavid Merabyanspecial
04/16/2026Post-installed AnchorsDavid Merabyanspecial
04/16/2026Fire-Resistant Penetrations and JointsDavid Merabyanspecial
11/24/2020Fire-Resistant Penetrations and JointsMehmet Gunalspecial
10/29/2020Fire-Resistant Penetrations and JointsMehmet Gunalspecial
08/25/2020HVAC and service water heating system controls Mehmet Gunalenergy_progress
08/25/2020Maintenance informationMehmet Gunalenergy_progress
08/25/2020HVAC and service water heating equipment Mehmet Gunalenergy_progress
08/25/2020Heating SystemsMehmet Gunalspecial
08/25/2020Fire-Resistant Penetrations and JointsMehmet Gunalspecial
▾Documents — 116 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch4
08/26/2026X00057564-I1Request digital key ↗
08/18/2026X01273862-I1Request digital key ↗
08/17/2026X01217529-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
08/25/2026X00398973-I1Request digital key ↗
08/15/2026X00398973-P1Request digital key ↗
08/15/2026X00398973-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment1
08/26/2026X00389760-I1Request digital key ↗
▸Applications & Permits14
▸BISPLAN / WORK APPROVAL APPLICATION9
01/19/2021240212051Open ↗
07/16/2020240208994Open ↗
12/06/2019240208994Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION5
06/30/2020240208994Open ↗
05/17/2018240208994Open ↗
12/14/2017240208994Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications37
▸DOB NOWSpecial Inspector Seal & Signature13
09/27/2026X01217529-I1Open ↗
09/27/2026X01217529-I1Open ↗
09/27/2026X01217529-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/26/2026X00057564-I1Open ↗
08/18/2026X01273862-I1Open ↗
08/17/2026X01217529-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/27/2026X01217529-I1Open ↗
09/23/2026X00389760-I1Open ↗
09/23/2026X00389760-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
01/22/2018240212051Open ↗
12/14/2017240208994Open ↗
06/23/2016240146542Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
01/22/2018240212051Open ↗
12/14/2017240208994Open ↗
06/23/2016240146542Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
01/22/2018240212051Open ↗
12/14/2017240208994Open ↗
06/23/2016240146542Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
01/06/2020240208994Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING2
01/22/2018240212051Open ↗
12/14/2017240208994Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
01/22/2018240212051Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
12/02/2019240208994Open ↗
▸Safety & Tenant Protection8
▸DOB NOWTenant Protection Plan5
08/13/2026X00389760-I1Open ↗
08/13/2026X00398973-P3Open ↗
08/13/2026X00398973-P2Open ↗
Showing 3 of 5 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES3
01/22/2018240212051Open ↗
12/14/2017240208994Open ↗
06/23/2016240146542Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/17/2026X01217529-P1Open ↗
08/13/2026X00389760-I1Open ↗
08/13/2026X01217529-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
01/22/2018240212051Open ↗
12/14/2017240208994Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
10/27/2020240208994Open ↗
10/27/2020240208994Open ↗
01/22/2018240212051Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
01/22/2018240212051Open ↗
12/14/2017240208994Open ↗
06/23/2016240146542Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/27/2020240208994Open ↗
▸BISNYCECC ANALYSIS1
01/22/2018240212051Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00389760-I1Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY8
10/27/2020240208994Open ↗
10/27/2020240208994Open ↗
10/27/2020240208994Open ↗
Showing 3 of 8 on file for this type
▸Approvals, Objections & Sign-offs6
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/13/2026X00398973-P2Open ↗
08/13/2026X00398973-I1Open ↗
08/13/2026X00389760-I1Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/27/2020240208994Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT4
10/27/2020240208994Open ↗
01/22/2018240212051Open ↗
12/14/2017240208994Open ↗
Showing 3 of 4 on file for this type
▸BISDEPT OF FINANCE VERIFICATION1
12/14/2017240208994Open ↗
▸Filing & Intake Forms6
▸BISEFILING JOB APPLICATION COVER SHEET3
01/22/2018240212051Open ↗
12/14/2017240208994Open ↗
06/23/2016240146542Open ↗
▸BISBOROUGH INTAKE FORM2
01/06/2020240208994Open ↗
07/05/2019240212051Open ↗
▸BISADDITIONAL INFORMATION1
12/05/2019240208994Open ↗