← Back
BuildNYC
Over six families without stores
2474 MARION AVENUE
BRONX · BIN 2011067
💬 Discuss this project
1911Year Built
6Stories
C1Building Class
R7-1Zoning
25,025 sfGross Floor Area
25Units
LL97 CoveredRent Stabilized20 Active Violations 19 unresolved · 1 paperwork only 4 likely answered ▸FISP: No Report FiledFDNY Report ↗
Over six families without stores · Owner of record: Mount Hope Preservation Apartments 1A · 5,390 sf lot · 4.64 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 17 docs
CellarBoiler system analysis and schematic6p · 2 filings · 20 docs
Site & exteriorInstallation of sidewalk shed7p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
St John's University1503/22/2026
Mount Hope Preservation Apartments 1A203/22/2026
Monadnock Development104/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Eoc-NY204/17/2026
Fazal Bangash108/19/2025
M. Hamdi Gunal, PE, P511/19/2020
Joel Phagoo P.E.106/29/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CSR Expediters503/21/2026
A1 Expediting Service203/21/2026
MMSR Consulting Group203/21/2026
Green Studio203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Advanced Construction EquipmentScaffold407/08/2026
Notias ConstructionGeneral Contractor203/21/2026
Fernandez Heating & MechanicalPlumbing207/08/2026
High Quality ElectricElectrical103/21/2026
Annex EnterpriseGeneral Contractor104/09/2026
Ace Group NYScaffold107/08/2026
Value Construction BXGeneral Contractor106/27/2016
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Eoc-NY6548204/17/2026
HRF Services5616105/01/2025
M. Hamdi Gunal, PE3000511/19/2020
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 10, sub-cycle A)
The filing window opened 02/21/2025. 1 Cycle 10 filing on record, latest 12/11/2025, status No Report Filed
10/15/2026
Signed off — Alteration
PROPOSED FACADE RESTORATION AS PER PLANS NO CHANGE TO USE EGRESS OR OCCUPANCY.
X01217529-I1
08/20/2026
Permit expired, never signed off — Sidewalk Shed
The city's record still shows this permit as issued, with no sign-off on its filing
X01273862-I1-SH
07/01/2026
Failure to maintain exterior building facade and appurtenances. Note: at time of inspection i observed cracked brick, damaged mortar joints,and…
ECB violation · open
04/17/2026
Filed — Alteration
PROPOSED FACADE RESTORATION AS PER PLANS NO CHANGE TO USE EGRESS OR OCCUPANCY.
X01217529-P1
251 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offAnnex Enterprise09/02/2025
DOB NOWSidewalk ShedPermit IssuedAce Group NY08/20/2025
DOB NOWPlumbingSigned-offFernandez Heating & Mechanical09/29/2020
DOB NOWBoiler EquipmentPermit IssuedFernandez Heating & Mechanical09/15/2020
DOB NOWSidewalk ShedSigned-offAdvanced Construction Equipment11/05/2018
DOB NOWSidewalk ShedSigned-offAdvanced Construction Equipment06/29/2018
BISOTISSUEDNotias Construction07/28/2020
BISPLISSUEDFernandez Heating & Mechanical06/26/2020
BISOTISSUEDNotias Construction03/27/2020
BISOTISSUEDNotias Construction03/29/2019
BISOTISSUEDNotias Construction08/02/2018
BISPLISSUEDFernandez Heating & Mechanical05/17/2018
BISOTISSUEDNotias Construction12/15/2017
BISOTISSUEDValue Construction BX06/27/2016
3 projects · most recent 08/29/2025
General Wiring
FiledStatusContractorScope
08/29/2025Permit IssuedHigh Quality Electric of NYC—
06/08/2018CompleteTechno-Volt ElectricGeneral Wiring
05/17/2018CompleteNash Electric Services—
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
04/17/2026Exterior Insulation and Finish Systems (EIFS)David Merabyanspecial
04/17/2026FinalDavid Merabyanprogress
04/17/2026Fire-Resistant Penetrations and JointsDavid Merabyanspecial
04/17/2026Wall Panels, Curtain Walls, and VeneersDavid Merabyanspecial
04/17/2026Tenant Protection Plan ComplianceSHAHRIAR QUAYYUMspecial
04/17/2026Structural Stability – Alterations of existing buildingsDavid Merabyanspecial
04/17/2026Post-installed AnchorsDavid Merabyanspecial
04/16/2026FinalDavid Merabyanprogress
04/16/2026Exterior Insulation and Finish Systems (EIFS)David Merabyanspecial
04/16/2026Fire-Resistant Penetrations and JointsDavid Merabyanspecial
04/16/2026Post-installed AnchorsDavid Merabyanspecial
04/16/2026Structural Stability – Alterations of existing buildingsDavid Merabyanspecial
04/16/2026Wall Panels, Curtain Walls, and VeneersDavid Merabyanspecial
04/16/2026Tenant Protection Plan Compliance—special
11/24/2020Fire-Resistant Penetrations and JointsMehmet Gunalspecial
10/29/2020Fire-Resistant Penetrations and JointsMehmet Gunalspecial
10/21/2020Fire-Resistant Penetrations and JointsMehmet Gunalspecial
08/25/2020Maintenance informationMehmet Gunalenergy_progress
08/25/2020Heating SystemsMehmet Gunalspecial
08/25/2020HVAC and service water heating equipment Mehmet Gunalenergy_progress
08/25/2020Fire-Resistant Penetrations and JointsMehmet Gunalspecial
08/25/2020HVAC and service water heating system controls Mehmet Gunalenergy_progress
117 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account