2475 WEST 16TH STREET · BIN 3337265
💬 Discuss this project
1963Year Built
19Stories
D4Building Class
R5Zoning
421,800 sfGross Floor Area
364Units
LL97 CoveredRent Stabilized38 Active Violations 37 unresolved · 1 paperwork only 3 old, status unconfirmed ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: Harway Terrace · 188,350 sf lot · 2.24 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralPlumbingGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofHarway Terrace, INC.1 filing · 3 docs
Floor 191p · 1 filing · 2 docs
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8Unit 8H4p · 1 filing · 12 docs
Floor 7
Floor 6Unit 6F7p · 2 filings · 8 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Site & exterior5p · 1 filing · 2 docs
Filed — no permit issuedFence Replacement6p · 2 filings · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Harway Terrace3210/04/2026
Aggressive103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Jaj Engineering509/30/2026
FC Architect204/02/2024
A Degree of Freedom Structural Engineering109/28/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
City Building NY Architect P603/21/2026
Insite Design Studio103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Prograde ConstructionGeneral Contractor303/21/2026
CMY ElectricalElectrical303/22/2026
Matsikas VasiliosElectrical103/21/2026
Apollo Electric NYGElectrical103/21/2026
Tower ElectricElectrical103/21/2026
Cube Builders Group NYGeneral Contractor107/08/2026
Premier Painting & Contracting*specialty_contractor107/08/2026
Gregg NY PlumbingPlumbing107/08/2026
PipestylistsPlumbing107/08/2026
TJ Doyle Electric EntpsElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FC Architect5851204/02/2024
Jaj Engineering930109/29/2023
A Degree of Freedom Structural925109/28/2022
Building Lifecycle
All (116)Filed (9)Permit Issued (5)Signed Off (5)Facade (FISP) (18)Violation (60)Inspection (7)Special Inspection (12)
09/30/2026
Filed — Alteration
REPAIR /REPLACE ROOF AS REQUIRED PER PLANS FILED
B01463311-I1
09/30/2026
Special inspection requirement — Energy Code Compliance Inspections
Joseph Jabour
09/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/21/2026
Special inspection requirement — Final
09/20/2026
Filed — Alteration
facade inspection
B01461877-I1
06/11/2026
Filed — Alteration
Fence Replacement
B01408941-I1
06/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/28/2026
Special inspection requirement — Final
02/24/2026
Violation issued (ECB, closed)
Elevators
02/24/2026
Violation issued (ECB, closed)
Elevators
09/22/2025
Violation issued (HPD, closed)
B
05/05/2025
Violation issued (HPD, closed)
B
05/05/2025
Violation issued (HPD, closed)
B
04/08/2025
Violation issued (HPD, closed)
C
12/02/2024
Violation issued (HPD, open)
C
11/26/2024
Violation issued (HPD, closed)
I
09/16/2024
Signed off — Alteration
PROPOSED SUBSEQUENT FILING OF PLUMBING WORK ON 8TH FLOOR AT UNIT 8H AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00994131-I1
08/26/2024
Signed off — Alteration
PROPOSED SUBSEQUENT FILING OF PLUMBING WORK ON 8TH FLOOR AT UNIT 8H AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00994131-S1
08/14/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/16/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/16/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/17/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/25/2024
Signed off — Alteration
To file PL plumbing work type in conjunction with DOB Now Build application B00932719. No change in use, egress or occupancy under this application.
B00932730-I1
04/18/2024
Permit issued — Plumbing
B00994131-S1-PL
04/18/2024
Permit issued — General Construction
B00994131-I1-GC
04/16/2024
Filed — Alteration
To file PL plumbing work type in conjunction with DOB Now Build application B00932719. No change in use, egress or occupancy under this application.
B00932730-P1
04/02/2024
Filed — Alteration
PROPOSED SUBSEQUENT FILING OF PLUMBING WORK ON 8TH FLOOR AT UNIT 8H AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00994131-I1
04/02/2024
Filed — Alteration
PROPOSED SUBSEQUENT FILING OF PLUMBING WORK ON 8TH FLOOR AT UNIT 8H AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00994131-S1
03/25/2024
Signed off — Alteration
B00932719-I1
03/05/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/29/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/29/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/28/2024
Permit issued — Plumbing
B00932730-I1-PL
01/25/2024
Cycle 9 facade report submitted
01/22/2024
Cycle 9 facade report signed — SAFE
01/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FEI CHAN
01/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FEI CHAN
01/22/2024
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
FEI CHAN
01/22/2024
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
FEI CHAN
01/22/2024
Special inspection requirement — Energy Code Compliance Inspections
FEI CHAN
01/22/2024
Special inspection requirement — Fire-Resistance Rated Construction
FEI CHAN
01/22/2024
Special inspection requirement — Lighting in dwelling units
FEI CHAN
01/18/2024
Cycle 9 facade inspection completed
01/11/2024
Signed off — Alteration
B07994862-I1
12/20/2023
Permit issued — Structural
B07994862-I1-ST
11/21/2023
Violation issued (HPD, closed)
C
11/21/2023
Violation issued (HPD, closed)
B
11/21/2023
Violation issued (HPD, closed)
C
11/21/2023
Violation issued (HPD, closed)
C
11/21/2023
Violation issued (HPD, closed)
C
11/21/2023
Violation issued (HPD, closed)
C
11/21/2023
Violation issued (HPD, closed)
C
11/21/2023
Violation issued (HPD, closed)
C
11/21/2023
Violation issued (HPD, closed)
B
11/21/2023
Violation issued (HPD, closed)
B
11/21/2023
Violation issued (HPD, closed)
B
11/21/2023
Violation issued (HPD, closed)
A
11/21/2023
Violation issued (HPD, closed)
C
11/21/2023
Violation issued (HPD, closed)
C
11/21/2023
Violation issued (HPD, closed)
B
Latest 60 of 116 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offT & T Plumbing04/18/2024
DOB NOWGeneral ConstructionSigned-offCube Builders Group NY04/18/2024
DOB NOWPlumbingSigned-offGregg NY Plumbing02/28/2024
DOB NOWStructuralSigned-offPrograde Construction12/20/2023
DOB NOWGeneral ConstructionSigned-offPremier Painting & Contracting*11/02/2023
BISEQISSUEDIntersystems Installation S&S10/10/2023
BISOTISSUEDPrograde Construction07/28/2023
BISOTISSUEDPrograde Construction01/10/2023
BISEQISSUEDIntersystem Installation09/26/2022
BISOTISSUEDPrograde Construction08/17/2022
BISOTISSUEDPrograde Construction04/13/2022
BISOTISSUEDPrime Development03/21/2022
BISEQISSUEDPratt Construction & Restoration11/03/2021
BISEQISSUEDPratt Construction & Restoration11/01/2021
BISOTISSUEDPrime Development03/23/2021
BISEQISSUEDPratt Construction & Restoration10/13/2020
BISOTISSUEDPrime Development08/31/2020
BISOTISSUEDPrime Development08/27/2020
BISOTISSUEDV&P Altitude05/15/2020
BISEQISSUEDPratt Construction & Restoration10/10/2019
BISOTISSUEDRahil Contracting10/09/2019
BISOTISSUEDQosaj Construction11/20/2018
BISOTISSUEDQosaj Construction11/20/2018
BISEQISSUEDPratt Construction & Restoration11/08/2018
BISOTISSUEDApa Group07/06/2018
BISOTISSUEDApa Group03/13/2018
BISPLISSUEDRite Way Plumbing & Heating02/02/2018
BISOTISSUEDFinix U.S.A. Construction01/02/2018
BISOTISSUEDApa Group12/11/2017
BISEQISSUEDPratt Construction & Restoration12/07/2017
BISEQISSUEDIntersystem S&S09/20/2017
BISOTISSUEDAggressive Heating07/07/2016
BISEQISSUEDXinos Construction05/13/2016
BISOTISSUEDAggressive Heating10/29/2015
6 projects · most recent 09/25/2024
General Wiring
FiledStatusContractorScope
09/25/2024Permit IssuedCMY ElectricalGeneral Wiring
09/25/2024CompleteCMY ElectricalGeneral Wiring
11/01/2023CompleteCMY ElectricalGeneral Wiring
01/25/2023CompleteAll Ways Electric Corp.w—
03/24/2022Permit IssuedLens ElectricGeneral Wiring
01/18/2018CompleteKings Electric Co—
1 project · most recent 09/20/2026
FiledStatusContractorScope
09/20/2026———
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
08/14/2024Pass-Final General Construction Non-Directive 14PassView ↗
07/16/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/16/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/17/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/29/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/29/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
09/30/2026Energy Code Compliance InspectionsJoseph Jabourprogress
09/23/2026Tenant Protection Plan Compliance—special
09/21/2026Final—progress
06/05/2026Tenant Protection Plan Compliance—special
05/28/2026Final—progress
01/22/2024Fire-Resistant Penetrations and JointsFEI CHANspecial
01/22/2024Fire-Resistant Penetrations and JointsFEI CHANspecial
01/22/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)FEI CHANspecial
01/22/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)FEI CHANspecial
01/22/2024Energy Code Compliance InspectionsFEI CHANprogress
01/22/2024Fire-Resistance Rated ConstructionFEI CHANprogress
01/22/2024Lighting in dwelling unitsFEI CHANenergy_progress
▾Documents — 250 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
10/04/2026B01463311-I1Request digital key ↗
10/04/2026B01461877-I1Request digital key ↗
08/28/2026B07994862-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits47
▸BISWORK PERMIT APPLICATION25
10/20/2023340545921Open ↗
09/27/2022340545921Open ↗
04/14/2022321154031Open ↗
Showing 3 of 25 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION17
06/28/2021321154031Open ↗
06/21/2021321154031Open ↗
04/05/2021340545921Open ↗
Showing 3 of 17 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION5
03/20/2020321154031Open ↗
04/12/2019321154031Open ↗
04/11/2018321523188Open ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records3
▸BISFLOOD ZONE DESIGN CERTIFICATION3
08/04/2016340408749Open ↗
06/29/2016340397038Open ↗
10/28/2015340318187Open ↗
▸Seals & Professional Certifications54
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION17
01/08/2020340699257Open ↗
04/30/2019321154031Open ↗
04/30/2019321154031Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
10/08/2019340699257Open ↗
01/03/2018321523188Open ↗
09/19/2017340545921Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
10/04/2026B01463311-I1Open ↗
08/28/2026B07994862-I1Open ↗
08/26/2026B00932730-I1Open ↗
Showing 3 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION7
10/08/2019340699257Open ↗
09/19/2017340545921Open ↗
02/15/2017340470412Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY7
10/08/2019340699257Open ↗
09/19/2017340545921Open ↗
02/15/2017340470412Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/29/2026B00994131-I1Open ↗
08/29/2026B00994131-I1Open ↗
08/24/2026B00994131-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/29/2026B00994131-I1Open ↗
08/29/2026B00994131-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment6
▸BISSELF-CERT PLUMBING NOTICE3
09/17/2014320819824Open ↗
Showing 1 of 3 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
01/02/2018321523188Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
08/04/2016340408749Open ↗
▸BISSCHEDULE B - PLUMBING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection7
▸BISTENANT PROTECTION PLAN AND NOTES7
10/08/2019340699257Open ↗
09/19/2017340545921Open ↗
08/04/2016340408749Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos10
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
01/02/2018321523188Open ↗
09/15/2016321154031Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
10/04/2026B01463311-I1Open ↗
08/13/2026B00994131-I1Open ↗
08/13/2026B00994131-S1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/26/2026B00932730-I1Open ↗
08/26/2026B00932719-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
10/28/2015340318187Open ↗
▸Energy Compliance25
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS13
04/30/2019321154031Open ↗
08/28/2018321154031Open ↗
06/15/2018321523188Open ↗
Showing 3 of 13 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
06/15/2018321523188Open ↗
12/15/2016340397038Open ↗
09/28/2016340318187Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
01/04/2024321154031Open ↗
01/03/2024321154031Open ↗
10/28/2015340318187Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
06/29/2016340397038Open ↗
10/28/2015340318187Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/03/2024321154031Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
09/19/2017340545921Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
01/03/2024321154031Open ↗
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY14
01/08/2024321154031Open ↗
01/04/2024321154031Open ↗
01/04/2024321154031Open ↗
Showing 3 of 14 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
06/15/2018321523188Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
01/03/2024321154031Open ↗
▸BISMASONRY1
01/03/2024321154031Open ↗
▸Approvals, Objections & Sign-offs21
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
01/03/2025340545921Open ↗
01/09/2024321154031Open ↗
01/17/2020340699257Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
10/20/2023340545921Open ↗
10/10/2019340545921Open ↗
11/09/2018340545921Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER4
10/20/2023340545921Open ↗
09/27/2022340545921Open ↗
11/23/2018340470412Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
01/02/2018321523188Open ↗
Showing 1 of 3 on file for this type
▸BISFINAL1
01/03/2024321154031Open ↗
▸Cost, Insurance & Ownership17
▸BISCOST AFFIDAVIT16
01/08/2020340699257Open ↗
10/08/2019340699257Open ↗
06/15/2018321523188Open ↗
Showing 3 of 16 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
01/03/2024321154031Open ↗
▸Filing & Intake Forms30
▸BISADDITIONAL INFORMATION10
11/04/2021340545921Open ↗
08/12/2021321154031Open ↗
04/05/2021340545921Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM8
09/27/2022340545921Open ↗
11/04/2021340545921Open ↗
09/23/2021340545921Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
10/08/2019340699257Open ↗
09/19/2017340545921Open ↗
02/15/2017340470412Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET5
01/03/2018321523188Open ↗
09/15/2016321154031Open ↗
08/23/2016321432302Open ↗
Showing 3 of 5 on file for this type
▸Other Documents4
▸BISSupporting Document: Fee Exempt1
07/31/2018321154031Open ↗
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS1
06/29/2016340397038Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
12/15/2016340397038Open ↗
▸DOB NOWIRA Certification1
10/04/2026B01461877-I1Open ↗