← Back
Two stories - detached, small or mid-size
248-06 87 AVENUE
QUEENS · BIN 4176353
💬 Discuss this project
1935Year Built
2.5Stories
A1Building Class
R2AZoning
1,485 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,000 sf lot · 0.37 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Floor 21p · 1 filing · 20 docs
Floor 1
Cellar3p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/28/2021$775K—Private party → Private party$522/sf building
07/28/2014$560K—Private party → Private party$377/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CNA BUILDERS & CONSULTANT CORP404/02/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MONTI UNITED CONSTRUCTIONGeneral Contractor907/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CNA BUILDERS AND CONSULTA2898404/02/2024
Building Lifecycle
All (42)Filed (4)Permit Issued (6)Signed Off (4)Violation (5)Objection (8)Special Inspection (15)
03/24/2025
Signed off — Alteration
EXCAVATION UNDER THE EXISTING FOUNDATION AT THE REAR PORTION OF THE ONE-STORY BUILDING AT CRAWL SPACE LEVEL, CONVERT CRAWL SPACE TO CELLAR. TO REMOVE ECB VIOLATION#39107759Z.
Q00963050-S2
03/24/2025
Signed off — Alteration
EXCAVATION UNDER THE EXISTING FOUNDATION AT THE REAR PORTION OF THE ONE-STORY BUILDING AT CRAWL SPACE LEVEL, CONVERT CRAWL SPACE TO CELLAR. TO REMOVE ECB VIOLATION#39107759Z.
Q00963050-S3
03/12/2025
Signed off — Alteration
EXCAVATION UNDER THE EXISTING FOUNDATION AT THE REAR PORTION OF THE ONE-STORY BUILDING AT CRAWL SPACE LEVEL, CONVERT CRAWL SPACE TO CELLAR. TO REMOVE ECB VIOLATION#39107759Z.
Q00963050-I1
03/12/2025
Signed off — Alteration
EXCAVATION UNDER THE EXISTING FOUNDATION AT THE REAR PORTION OF THE ONE-STORY BUILDING AT CRAWL SPACE LEVEL, CONVERT CRAWL SPACE TO CELLAR. TO REMOVE ECB VIOLATION#39107759Z.
Q00963050-S4
02/19/2025
Permit issued — Structural
Q00963050-I1-ST
09/23/2024
Permit issued — Foundation
Q00963050-S4-FO
09/11/2024
Permit issued — Support of Excavation
Q00963050-S3-SE
09/06/2024
Permit issued — Structural
Q00963050-S2-ST
09/06/2024
Permit issued — General Construction
Q00963050-S2-GC
04/26/2024
Objection resolved — Addressed
04/26/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Choudhry Yusaf
04/09/2024
Objection resolved — Addressed
04/04/2024
Objection raised — Other
04/02/2024
Filed — Alteration
EXCAVATION UNDER THE EXISTING FOUNDATION AT THE REAR PORTION OF THE ONE-STORY BUILDING AT CRAWL SPACE LEVEL, CONVERT CRAWL SPACE TO CELLAR. TO REMOVE ECB VIOLATION#39107759Z.
Q00963050-S4
03/05/2024
Violation issued (ECB, closed)
Construction
02/16/2024
Filed — Alteration
EXCAVATION UNDER THE EXISTING FOUNDATION AT THE REAR PORTION OF THE ONE-STORY BUILDING AT CRAWL SPACE LEVEL, CONVERT CRAWL SPACE TO CELLAR. TO REMOVE ECB VIOLATION#39107759Z.
Q00963050-S3
02/16/2024
Special inspection requirement — Underpinning
Choudhry Yusaf
02/16/2024
Special inspection requirement — Subgrade Inspections
Choudhry Yusaf
02/16/2024
Special inspection requirement — Concrete - Cast-In-Place
Choudhry Yusaf
02/05/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Choudhry Yusaf
02/05/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Choudhry Yusaf
01/29/2024
Objection resolved — Addressed
01/22/2024
Objection resolved — Addressed
01/20/2024
Special inspection requirement — Subgrade Inspections
Choudhry Yusaf
01/20/2024
Special inspection requirement — Concrete - Cast-In-Place
Choudhry Yusaf
01/19/2024
Objection raised — Structural
01/19/2024
Objection raised — Inspections
01/19/2024
Objection raised — Scope
01/09/2024
Permit issued — Structural
Q00963050-I1-ST
01/08/2024
Filed — Alteration
EXCAVATION UNDER THE EXISTING FOUNDATION AT THE REAR PORTION OF THE ONE-STORY BUILDING AT CRAWL SPACE LEVEL, CONVERT CRAWL SPACE TO CELLAR. TO REMOVE ECB VIOLATION#39107759Z.
Q00963050-S2
12/22/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Choudhry Yusaf
12/22/2023
Special inspection requirement — Final
Choudhry Yusaf
12/22/2023
Special inspection requirement — Underpinning
Choudhry Yusaf
11/24/2023
Filed — Alteration
EXCAVATION UNDER THE EXISTING FOUNDATION AT THE REAR PORTION OF THE ONE-STORY BUILDING AT CRAWL SPACE LEVEL, CONVERT CRAWL SPACE TO CELLAR. TO REMOVE ECB VIOLATION#39107759Z.
Q00963050-I1
11/24/2023
Special inspection requirement — Subgrade Inspections
Choudhry Yusaf
11/22/2023
Special inspection requirement — Wood – Prefabricated I-Joists
Choudhry Yusaf
11/15/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Choudhry Yusaf
11/15/2023
Special inspection requirement — Final
Choudhry Yusaf
11/08/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/18/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/14/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/14/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offMONTI UNITED CONSTRUCTION02/19/2025
DOB NOWFoundationSigned-offMONTI UNITED CONSTRUCTION09/23/2024
DOB NOWSupport of ExcavationSigned-offMONTI UNITED CONSTRUCTION09/11/2024
DOB NOWStructuralSigned-offMONTI UNITED CONSTRUCTION09/06/2024
DOB NOWGeneral ConstructionSigned-offMONTI UNITED CONSTRUCTION09/06/2024
DOB NOWStructuralSigned-offMONTI UNITED CONSTRUCTION01/09/2024
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
04/26/2024Excavations - Sheeting, Shoring, and BracingChoudhry Yusafspecial
02/16/2024UnderpinningChoudhry Yusafspecial
02/16/2024Subgrade InspectionsChoudhry Yusafspecial
02/16/2024Concrete - Cast-In-PlaceChoudhry Yusafspecial
02/05/2024Excavations - Sheeting, Shoring, and BracingChoudhry Yusafspecial
02/05/2024Structural Stability – Alterations of existing buildingsChoudhry Yusafspecial
01/20/2024Subgrade InspectionsChoudhry Yusafspecial
01/20/2024Concrete - Cast-In-PlaceChoudhry Yusafspecial
12/22/2023Structural Stability – Alterations of existing buildingsChoudhry Yusafspecial
12/22/2023FinalChoudhry Yusafprogress
12/22/2023UnderpinningChoudhry Yusafspecial
11/24/2023Subgrade InspectionsChoudhry Yusafspecial
11/22/2023Wood – Prefabricated I-JoistsChoudhry Yusafspecial
11/15/2023Structural Stability – Alterations of existing buildingsChoudhry Yusafspecial
11/15/2023FinalChoudhry Yusafprogress
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/23/2026Q00963050-S4Request digital key ↗
08/23/2026Q00963050-I1Request digital key ↗
08/23/2026Q00963050-S2Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications19
▸DOB NOWSpecial Inspector Seal & Signature13
09/01/2026Q00963050-I1Open ↗
09/01/2026Q00963050-I1Open ↗
09/01/2026Q00963050-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/13/2026Q00963050-S4Open ↗
08/13/2026Q00963050-S2Open ↗
08/13/2026Q00963050-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026Q00963050-I1Open ↗
08/29/2026Q00963050-S2Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q00963050-S4Open ↗
08/13/2026Q00963050-S2Open ↗
▸Inspections & Test Reports4
▸DOB NOWGeotechnical Report (BC 1803.6)2
08/13/2026Q00963050-S3Open ↗
08/13/2026Q00963050-S4Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00963050-S4Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026Q00963050-S4Open ↗
▸Other Documents2
▸DOB NOWSurvey1
08/13/2026Q00963050-S2Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026Q00963050-S2Open ↗