248-09 CAMBRIA AVENUE
QUEENS · BIN 4170747
💬 Discuss this project
1945Year Built
1.5Stories
A0Building Class
R2AZoning
1,140 sfGross Floor Area
1Units
Cape Cod · 5,000 sf lot · 0.23 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 15 docs
Floor 213p · 2 filings · 20 docs
Floor 1Unit PH99p · 1 filing · 15 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Defonseca Architects310/23/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
New York International Builders *General Contractor603/21/2026
M Burton P & HPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Diego Aguilera Architect5084110/23/2023
Socotec Engineering4983109/01/2022
Building Lifecycle
10/20/2025
Signed off — Alteration
NEW BATHROOM ON SECOND FLOOR
Q08013890-I1
06/11/2025
Signed off — Alteration
new bathroom on second floor
Q00786332-I1
03/04/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/30/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/24/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
33 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offM Burton P & H02/02/2024
DOB NOWGeneral ConstructionSigned-offNew York International Builders *01/26/2024
DOB NOWGeneral ConstructionSigned-offNew York International Builders *11/17/2023
1 project · most recent 07/25/2024
General Wiring
FiledStatusContractorScope
07/25/2024CompletePower Surge ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/04/2025Pass-Final General Construction Non-Directive 14PassView ↗
01/30/2025Fail-Final General Construction Non-Directive 14FailView ↗
09/24/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/13/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
10/26/2023Fire-Resistant Penetrations and JointsDIEGO AGUILERAspecial
10/26/2023Energy Code Compliance InspectionsCARLOS DEFONSECAprogress
10/26/2023HVAC-R and service water piping design and insulationCARLOS DEFONSECAenergy_progress
04/29/2023Insulation placement and R values—energy_progress
04/29/2023Interior lighting power—energy_progress
04/29/2023Fenestration areas—energy_progress
04/29/2023Fire-Resistant Penetrations and Joints—special
04/29/2023Lighting controlsCARLOS DEFONSECAenergy_progress
04/29/2023Fenestration and door U-factor and product ratingsCARLOS DEFONSECAenergy_progress
04/29/2023Lighting in dwelling units—energy_progress
04/29/2023Structural Stability – Alterations of existing buildings—special
04/29/2023Air barrier — testing —energy_progress
21 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account