← Back
Two stories - detached, small or mid-size
248-19 88 ROAD
QUEENS · BIN 4176310
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R2AZoning
1,526 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,380 sf lot · 0.35 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC108/08/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272108/08/2025
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
10/17/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01263409-I1
08/15/2025
Permit issued — Solar
Q01263409-I1-SL
08/08/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01263409-I1
07/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
07/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
07/29/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
07/29/2025
Special inspection requirement — Final
Walid Abdulla
07/29/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC08/15/2025
1 project · most recent 08/05/2025
FiledStatusContractorScope
08/05/2025CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
07/29/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
07/29/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
07/29/2025Energy Code Compliance InspectionsWalid Abdullaprogress
07/29/2025FinalWalid Abdullaprogress
07/29/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/19/2026Q01263409-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/25/2026Q01263409-I1Open ↗
08/25/2026Q01263409-I1Open ↗
08/25/2026Q01263409-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026Q01263409-I1Open ↗
08/25/2026Q01263409-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q01263409-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01263409-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01263409-I1Open ↗