← Back
BuildNYC
Two stories - detached, small or mid-size
248-19 DEPEW AVENUE
QUEENS · BIN 4169208
💬 Discuss this project
1930Year Built
2Stories
A1Building Class
R2AZoning
2,508 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,536 sf lot · 0.55 FAR built · Flood zone X
Locations of Work
ElectricalGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSolar Electronic Generating System Installation11p · 1 filing · 9 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/18/2024$935K—Private party → Private party$373/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Tom Petersen Architect106/25/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Solar Contractingspecialty_contractor104/09/2026
Tower Buiding Groupspecialty_contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Thomas Petersen Architect7854106/25/2025
Building Lifecycle
04/27/2026
Signed off — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM.ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEING APPROVED AND/OR PERMITTED BY THENYC DEPARTMENT OF BUILDINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q01246345-I1
09/15/2025
Permit renewed — Solar
Renewed with changes
Q01246345-I1-SL
07/17/2025
Permit issued — Solar
Q01246345-I1-SL
06/25/2025
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM.ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEING APPROVED AND/OR PERMITTED BY THENYC DEPARTMENT OF BUILDINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q01246345-I1
06/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
9 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSolar Contracting09/15/2025
DOB NOWSolarSigned-offTower Buiding Group07/17/2025
1 project · most recent 06/25/2025
FiledStatusContractorScope
06/25/2025CompleteVillage Electl Contractors—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
06/24/2025Fire-Resistant Penetrations and JointsTOM PETERSENspecial
06/24/2025Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
06/24/2025Energy Code Compliance InspectionsTOM PETERSENprogress
06/24/2025FinalTOM PETERSENprogress
06/24/2025Air barrier - visual inspectionTOM PETERSENenergy_progress