← Back
Two stories - detached, small or mid-size
248-25 CAMBRIA AVENUE
QUEENS · Douglaston-Little Neck · BIN 4170743
💬 Discuss this project
1945Year Built
2Stories
A1Building Class
R2AZoning
1,920 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
Two stories - detached, small or mid-size · 4,000 sf lot · 0.48 FAR built · Flood zone X
Locations of Work
Electrical
Roof1p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC101/22/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272101/22/2024
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Violation (2)Special Inspection (5)
01/30/2024
Permit issued — Solar
Q00984335-I1-SL
01/22/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00984335-I1
01/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
01/02/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
01/02/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
01/02/2024
Special inspection requirement — Final
Walid Abdulla
01/02/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
05/19/2002
Violation issued (HPD, open)
B
03/20/1996
Violation issued (ECB, closed)
HPD
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC01/30/2024
BISEQISSUEDANZEN CONSTRUCTION CORP06/07/2006
BISPLISSUEDMETROPOLITAN HEAT & POWER CO06/02/2005
BISEQISSUEDRYTE CONSTRUCTION INC05/18/2005
1 project · most recent 01/22/2024
FiledStatusContractorScope
01/22/2024CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 01/22/2024
FiledStatusContractorScope
01/22/2024Signed-offSUNRUN INSTALLATION SVC9 panels, 3.64 kw, 190 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
01/02/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
01/02/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
01/02/2024Energy Code Compliance InspectionsWalid Abdullaprogress
01/02/2024FinalWalid Abdullaprogress
01/02/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/23/2026Q00984335-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/23/2026Q00984335-I1Open ↗
08/23/2026Q00984335-I1Open ↗
08/23/2026Q00984335-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026Q00984335-I1Open ↗
08/23/2026Q00984335-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q00984335-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q00984335-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q00984335-I1Open ↗