← Back
BuildNYC
Two stories - detached, small or mid-size
248-31 THORNHILL AVENUE
QUEENS · BIN 4170816
💬 Discuss this project
2024Year Built
2Stories
A1Building Class
R2AZoning
2,803 sfGross Floor Area
1Units
1 Active Violation ▸FDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: Lam Holding248 · 5,576 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofResidential Rooftop Grid-tied Solar PV SystemUnder Construction3p · 2 filings · 20 docs
AtticUnder Construction16p · 1 filing · 20 docs
Floor 2Under Construction19p · 1 filing · 20 docs
Floor 1Under Construction19p · 1 filing · 20 docs
CellarUnder Construction20p · 1 filing · 20 docs
Site & exteriorUnder Construction27p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/03/2023$839K—Private party → LAM HOLDING248 LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Chun Feng, Architect210/20/2026
Fang Architect303/31/2025
Agt Architecture303/31/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Fang Architect303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NTF ManagementGeneral Contractor504/09/2026
Haian Honest RenovationScaffold303/21/2026
Amm General Contractingspecialty_contractor308/04/2026
Procore MechanicalPlumbing107/08/2026
QMB Plumbing & HeatingPlumbing107/08/2026
NTF ManagementScaffold104/09/2026
Amergy Solarspecialty_contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Sq. Arch4802210/20/2026
Fang Architect5513403/31/2025
Triangle Inspection & Tes7495109/16/2024
Building Lifecycle
11/03/2026
Permit expired, never signed off — Construction Fence
The city's record still shows this permit as issued, with no sign-off on its filing
Q00986150-S2-FN
10/20/2026
Filed — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Q01394388-P1
10/19/2026
Special inspection requirement — Air barrier - visual inspection
Chun Feng
10/19/2026
Special inspection requirement — Final
Chun Feng
10/19/2026
Special inspection requirement — Energy Code Compliance Inspections
Chun Feng
57 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedAmm General Contracting08/03/2026
DOB NOWSolarPermit IssuedAmergy Solar05/08/2026
DOB NOWGeneral ConstructionPermit IssuedNTF Management03/09/2026
DOB NOWPlumbingPermit IssuedAmm General Contracting12/30/2025
DOB NOWConstruction FencePermit IssuedNTF Management11/03/2025
DOB NOWSprinklersPermit IssuedAmm General Contracting06/11/2025
DOB NOWGeneral ConstructionPermit IssuedNTF Management03/05/2025
DOB NOWPlumbingSigned-offQMB Plumbing & Heating02/28/2025
DOB NOWPlumbingPermit IssuedProcore Mechanical09/24/2024
DOB NOWGeneral ConstructionPermit IssuedNTF Management08/15/2024
DOB NOWConstruction FencePermit IssuedHaian Honest Renovation06/28/2024
1 project · most recent 03/31/2025
Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
03/31/2025Permit IssuedAmm General ContractingPlumbing-Sprinkler, Storm, Water/Sanitary
3 projects · most recent 10/21/2026
General Wiring
FiledStatusContractorScope
10/21/2026CompleteKJK ElectricGeneral Wiring
05/05/2026CompleteI.P. Electric—
09/13/2024CompleteKJK Electric—
1 project · most recent 10/20/2026
FiledStatusContractorScope
10/20/2026Permit IssuedAmergy Solar—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/03/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/01/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/21/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/05/2025Pass-Final House ConnectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
10/19/2026Air barrier - visual inspectionChun Fengenergy_progress
10/19/2026FinalChun Fengprogress
10/19/2026Energy Code Compliance InspectionsChun Fengprogress
10/19/2026Fire-Resistant Penetrations and JointsChun Fengspecial
09/03/2025Structural Stability – Alterations of existing buildingsDEZHANG FANGspecial
09/03/2025MasonryDEZHANG FANGspecial
09/03/2025Structural Steel - High Strength BoltingDEZHANG FANGspecial
09/03/2025Footing and FoundationDEZHANG FANGprogress
09/03/2025FinalDEZHANG FANGprogress
09/03/2025Fire-Resistance Rated ConstructionDEZHANG FANGprogress
09/03/2025Structural Wood FrameDEZHANG FANGprogress
09/03/2025Energy Code Compliance InspectionsDEZHANG FANGprogress
09/03/2025MeteringDEZHANG FANGenergy_progress
09/03/2025Protection of exposed foundation insulationDEZHANG FANGenergy_progress
09/03/2025Fenestration and door U-factor and product ratingsDEZHANG FANGenergy_progress
09/03/2025Fenestration areasDEZHANG FANGenergy_progress
09/03/2025Permanent certificateDEZHANG FANGenergy_progress
09/03/2025Fenestration air leakageDEZHANG FANGenergy_progress
09/03/2025Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
09/03/2025Electric vehicle service equipment requirementsDEZHANG FANGenergy_progress
09/03/2025Interior lighting powerDEZHANG FANGenergy_progress
09/03/2025Insulation placement and R valuesDEZHANG FANGenergy_progress
09/03/2025Maintenance informationDEZHANG FANGenergy_progress
09/03/2025Air barrier - visual inspectionDEZHANG FANGenergy_progress
09/03/2025Air barrier — testing DEZHANG FANGenergy_progress
Latest 25 of 37.
60 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account