← Back
BuildNYC
Two stories - detached, small or mid-size
248-34 THEBES AVENUE
QUEENS · BIN 4170705
💬 Discuss this project
0Year Built
2.5Stories
A1Building Class
R2AZoning
2,489 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 5,000 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof3p · 1 filing · 20 docs
Attic16p · 1 filing · 20 docs
Floor 223p · 1 filing · 20 docs
Floor 135p · 1 filing · 20 docs
Cellar26p · 1 filing · 20 docs
Site & exterior34p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/21/2023$830K—Private party → Private party$333/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ameriland Brook1009/14/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Dynasty ContractingGeneral Contractor1203/21/2026
L&L Construction DevelopmentGeneral Contractor407/08/2026
Dynasty ContractingScaffold303/21/2026
Dynasty Contractingspecialty_contractor303/21/2026
L&L Construction DevelopmentScaffold107/08/2026
Watson's Plumbing, Heating, & BuildingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ameriland Brook1506709/14/2024
Building Lifecycle
01/17/2025
Signed off — New Building
PROPOSE A TWO STORY WITH ONE FAMILY HOUSE. OBTAIN NEW C OF O.
Q00884947-I1
12/03/2024
Signed off — New Building
PROPOSE A TWO STORY WITH ONE FAMILY HOUSE. OBTAIN NEW C OF O.
Q00884947-S3
12/02/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/21/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
11/13/2024
Signed off — New Building
PROPOSE A TWO STORY WITH ONE FAMILY HOUSE. OBTAIN NEW C OF O.
Q00884947-S4
66 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offL&L Construction Development09/16/2024
DOB NOWGeneral ConstructionPermit IssuedL&L Construction Development02/01/2024
DOB NOWConstruction FenceSigned-offL&L Construction Development01/12/2024
DOB NOWPlumbingSigned-offWatson's Plumbing, Heating, & Building12/11/2023
DOB NOWFoundationSigned-offDynasty Contracting10/12/2023
DOB NOWMechanical SystemsSigned-offDynasty Contracting10/10/2023
DOB NOWEarth WorkPermit IssuedDynasty Contracting10/10/2023
DOB NOWFoundationSigned-offDynasty Contracting09/08/2023
DOB NOWFull DemolitionSigned-offDynasty Contracting08/15/2023
DOB NOWConstruction FenceSigned-offDynasty Contracting08/07/2023
1 project · most recent 09/14/2024
Associated Ducts and Piping Heating Systems
FiledStatusContractorScope
09/14/2024Signed-offL&L Construction DevelopmentAssociated Ducts and Piping, Heating Systems
1 project · most recent 09/14/2024
FiledStatusContractorScope
09/14/2024———
1 project · most recent 09/14/2024
Gas Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
09/14/2024Signed-offWatson's Plumbing, Heating, & BuildingGas, Plumbing-Sprinkler, Storm, Water/Sanitary
1 project · most recent 12/18/2023
General Wiring
FiledStatusContractorScope
12/18/2023CompleteKJK ElectricGeneral Wiring
1 project · most recent 09/14/2024
Masonry Wood
FiledStatusContractorScope
09/14/2024Signed-offL&L Construction DevelopmentMasonry, Wood
1 project · most recent 09/14/2024
Fence
FiledStatusContractorScope
09/14/2024Signed-offL&L Construction DevelopmentFence
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
12/02/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
11/21/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
11/08/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/15/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/15/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/15/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/15/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/15/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 94
DateRequirementInspectorRole
10/30/2024MasonryXIAOHONG ZHAOspecial
10/30/2024Chimneys and ventsXIAOHONG ZHAOspecial
10/30/2024Subsurface Investigations (Borings/Test Pits)TONY ONYEAGOROspecial
10/30/2024Ventilation and air distribution systemXIAOHONG ZHAOenergy_progress
10/30/2024Duct leakage testing, insulation and designXIAOHONG ZHAOenergy_progress
10/30/2024Fenestration air leakageXIAOHONG ZHAOenergy_progress
10/30/2024Permanent certificateXIAOHONG ZHAOenergy_progress
10/30/2024Air barrier - visual inspectionXIAOHONG ZHAOenergy_progress
10/30/2024Excavations - Sheeting, Shoring, and BracingXIAOHONG ZHAOspecial
10/30/2024Concrete - Cast-In-PlaceXIAOHONG ZHAOspecial
10/30/2024Structural Steel - WeldingXIAOHONG ZHAOspecial
10/30/2024Structural Steel - High Strength BoltingXIAOHONG ZHAOspecial
10/30/2024Mechanical SystemsXIAOHONG ZHAOspecial
10/30/2024Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
10/30/2024Subgrade InspectionsXIAOHONG ZHAOspecial
10/30/2024Structural Steel - DetailsXIAOHONG ZHAOspecial
10/30/2024Heating SystemsXIAOHONG ZHAOspecial
10/30/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationXIAOHONG ZHAOspecial
10/30/2024FinalXIAOHONG ZHAOprogress
10/30/2024Footing and FoundationXIAOHONG ZHAOprogress
10/30/2024Fire-Resistance Rated ConstructionXIAOHONG ZHAOprogress
10/30/2024Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
10/30/2024MeteringXIAOHONG ZHAOenergy_progress
10/30/2024Fenestration areasXIAOHONG ZHAOenergy_progress
10/30/2024HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
Latest 25 of 94.
97 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account