← Back
BuildNYC
Gas station with service / auto repair
248-70 HORACE HARDING EXPRESSWAY
QUEENS · BIN 4171762
💬 Discuss this project
1996Year Built
1Stories
G4Building Class
R3-2Zoning
1,950 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Gas station with service / auto repair · Owner of record: Jaidibell Li Expwy · 13,900 sf lot · 0.14 FAR built · Flood zone X
Locations of Work
MechanicalCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofBP Gas Station, Spartan Petroleum3p · 2 filings · 17 docs
Floor 1Spartan Petroleum, BP Gas Station4p · 3 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Spartan Petroleum2007/08/2026
BP North America403/21/2026
Jaidibell L.i.expwy403/21/2026
Amoco Oil Company103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VAA203/18/2025
Applied HVAC Engineering206/02/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
VAA203/21/2026
Treasure Box Services403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Restore AmericaGeneral Contractor407/08/2026
Alvin Petroleum Systems IGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Applied HVAC Engineering7563206/02/2021
Kline Engineering1007102/18/2020
Building Lifecycle
All (26)Filed (4)Permit Issued (3)Signed Off (3)Violation (1)Inspection (4)Special Inspection (11)
06/17/2025
Signed off — Alteration
Proposed curb cut West Side of Marathon Parkway 6' South of Horace Harding Expressway Cut = 17' plus 2'-6" splay each side total cut equals 22'-0". No change in use egress or occupancy is proposed under this application.
Q01196250-I1
06/16/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
05/30/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
05/19/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
05/12/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
04/15/2025
Permit issued — Curb Cut
Q01196250-I1-CC
03/18/2025
Filed — Alteration
Proposed curb cut West Side of Marathon Parkway 6' South of Horace Harding Expressway Cut = 17' plus 2'-6" splay each side total cut equals 22'-0". No change in use egress or occupancy is proposed under this application.
Q01196250-I1
08/23/2021
Signed off — Alteration
PROPOSED INSTALLATION OF HVAC EQUIPMENT AT THE PREMISES AS PER PLANS FILED HEREWITH. THERE IS NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q00414489-I1
06/24/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexandra Herrera
06/24/2021
Special inspection requirement — Mechanical Systems
Alexandra Herrera
06/24/2021
Special inspection requirement — Final
Alexandra Herrera
06/24/2021
Special inspection requirement — HVAC insulation and sealing
Alexandra Herrera
06/24/2021
Special inspection requirement — HVAC and service water heating equipment
Alexandra Herrera
06/24/2021
Special inspection requirement — Maintenance information
Alexandra Herrera
06/24/2021
Special inspection requirement — HVAC and service water heating system controls
Alexandra Herrera
06/02/2021
Filed — Alteration
PROPOSED INSTALLATION OF HVAC EQUIPMENT AT THE PREMISES AS PER PLANS FILED HEREWITH. THERE IS NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q00414489-P1
11/18/2020
Permit issued — Mechanical Systems
Q00414489-I1-MS
11/10/2020
Filed — Alteration
PROPOSED INSTALLATION OF HVAC EQUIPMENT AT THE PREMISES AS PER PLANS FILED HEREWITH. THERE IS NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q00414489-I1
04/01/2020
Signed off — Alteration
Propose to install replacement mechanical equipment as per plans filed herewith
Q00308909-I1
03/06/2020
Permit issued — Mechanical Systems
Q00308909-I1-MS
02/18/2020
Filed — Alteration
Propose to install replacement mechanical equipment as per plans filed herewith
Q00308909-I1
02/03/2020
Special inspection requirement — Mechanical Systems
ARNOLD KLINE
02/03/2020
Special inspection requirement — Final
JAMES VASSALOTTI
02/03/2020
Special inspection requirement — HVAC insulation and sealing
JAMES VASSALOTTI
02/03/2020
Special inspection requirement — HVAC and service water heating system controls
JAMES VASSALOTTI
09/11/1998
Violation issued (ECB, closed)
Zoning
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offAlvin Petroleum Systems I04/15/2025
DOB NOWMechanical SystemsSigned-offRestore America11/18/2020
DOB NOWMechanical SystemsSigned-offRestore America03/06/2020
BIS—ISSUEDVAA08/25/2025
BIS—ISSUEDHigh Point Engineering04/19/2019
BIS—ISSUEDBohler Engineering09/05/2006
BISOTISSUEDParker Service Industries08/26/2002
BIS—ISSUEDParker Service Industries08/19/2002
BIS—ISSUEDParker Service Industries03/22/2002
BIS—ISSUEDParker Service Industries03/22/2002
BIS—ISSUEDTyree Organization04/09/1996
BISOTISSUEDTyree Organization10/30/1995
BIS—ISSUEDTyree Organization10/24/1995
BISOTISSUEDVic Construction10/06/1992
BIS—ISSUEDVic Construction04/18/1991
BIS—ISSUEDVic Construction04/18/1991
BIS—ISSUEDVic Construction04/18/1991
BIS—ISSUEDVic Construction04/16/1991
BIS—ISSUEDVic Construction03/19/1991
BIS—ISSUEDVic Construction03/19/1991
BISPLISSUEDKesten PLG and Heating02/05/1991
BISEQISSUEDScala Contracting Co10/23/1990
BISFPISSUEDVic Construction08/17/1990
BISFSISSUEDVic Construction08/17/1990
1 project · most recent 07/10/2018
FiledStatusContractorScope
07/10/2018CompleteRobert S. Covello—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/16/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
05/30/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
05/19/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
05/12/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
06/24/2021Fire-Resistant Penetrations and JointsAlexandra Herreraspecial
06/24/2021Mechanical SystemsAlexandra Herreraspecial
06/24/2021FinalAlexandra Herreraprogress
06/24/2021HVAC insulation and sealing Alexandra Herreraenergy_progress
06/24/2021HVAC and service water heating equipment Alexandra Herreraenergy_progress
06/24/2021Maintenance informationAlexandra Herreraenergy_progress
06/24/2021HVAC and service water heating system controls Alexandra Herreraenergy_progress
02/03/2020Mechanical SystemsARNOLD KLINEspecial
02/03/2020FinalJAMES VASSALOTTIprogress
02/03/2020HVAC insulation and sealing JAMES VASSALOTTIenergy_progress
02/03/2020HVAC and service water heating system controls JAMES VASSALOTTIenergy_progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Spartan PetroleumIndustrial / WarehouseFloor 1, Roof
Project Q01196250 Alteration · LOC Issued · 03/18/2025
Project Q00308909 Alteration · LOC Issued · 02/18/2020
BP Gas StationAutomotive / fuelFloor 1, Roof
Project Q00414489 Alteration · LOC Issued · 11/10/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch - Mechanical Systems3
08/28/2026Q00308909-I1Request digital key ↗
08/27/2026Q00414489-I1Request digital key ↗
08/15/2026Q00414489-P1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/20/2026Q01196250-I1Request digital key ↗
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION3
01/15/2026421843250Open ↗
05/20/2019421626002Open ↗
04/26/2018421626002Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
08/29/2025421843250Open ↗
05/02/2019421626002Open ↗
▸BISWORK PERMIT APPLICATION1
05/02/2019421626002Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
09/08/2025421843250Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
09/29/2025421843250Open ↗
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026Q00414489-I1Open ↗
09/01/2026Q00414489-I1Open ↗
09/01/2026Q00414489-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/27/2026Q00414489-I1Open ↗
08/20/2026Q01196250-I1Open ↗
08/13/2026Q00414489-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026Q00414489-I1Open ↗
09/01/2026Q00414489-I1Open ↗
08/22/2026Q00308909-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
04/26/2018421626002Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
08/20/2025421843250Open ↗
05/02/2019421626002Open ↗
▸Energy Compliance3
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/23/2025421843250Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
04/26/2018421626002Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/20/2019421626002Open ↗
▸Approvals, Objections & Sign-offs5
▸BISSCHEDULE A - OCCUPANCY / USE2
04/19/2019421626002Open ↗
04/26/2018421626002Open ↗
▸BISBSA/CPC APPROVAL1
08/20/2025421843250Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/02/2018421626002Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
05/20/2019421626002Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT4
02/04/2026421843250Open ↗
08/20/2025421843250Open ↗
05/20/2019421626002Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
09/23/2025421843250Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
05/20/2019421626002Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION4
02/05/2026421843250Open ↗
02/03/2026421843250Open ↗
08/20/2025421843250Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET1
04/26/2018421626002Open ↗
▸Other Documents2
▸BISBSA VARIANCE1
08/20/2025421843250Open ↗
▸BISPLOT DIAGRAM1
05/20/2019421626002Open ↗