← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
195 BERRY STREET
BROOKLYN · BIN 3396636
💬 Discuss this project
2010Year Built
5Stories
RMBuilding Class
M1-4/R6BZoning
138,233 sfGross Floor Area
88Units
LL97 CoveredRent Stabilized8 Open Violations 7 unresolved · 1 paperwork only ▸FDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 41,419 sf lot · 3.34 FAR built · Flood zone X
Locations of Work
ElectricalMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction7p · 2 filings · 20 docs
Floor 2Under Construction13p · 1 filing · 20 docs
Floor 1Under Construction13p · 1 filing · 20 docs
Cellar4p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRITON REALTY GROUP3807/08/2026
PLAZA MANAGEMENT507/08/2026
248-250 BEDFORD NYT LLC303/22/2026
DUANE READE STORE #426203/22/2026
CGT CONSTRUCTION103/22/2026
JANBAR703/22/2026
JAMBAR INC103/22/2026
HENRY PALUMBO C/O 201 BER103/22/2026
PLAZA MANAGEMENT USA203/21/2026
201 BERRY603/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KAZAM CONSULTANTS403/21/2026
RIZZO GROUP403/21/2026
NEW YORK ENGINEERING203/21/2026
CONVERSANO ASSOCIATES, INC.403/21/2026
ALL IN PERMIT CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
P.H. WORKS INCPlumbing207/08/2026
BALATON CONSULTING LLCScaffold207/08/2026
NORTH SHORE NEON SIGNScaffold207/08/2026
COIL TECHS HVAC SERVICESGeneral Contractor107/08/2026
M. FRIED STORE FIXTURES,General Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851302/18/2026
TWIG SPECIAL INSPECTIONS885410/10/2025
SPECIAL INSPECTION SERVIC1200205/18/2021
Building Lifecycle
All (114)Filed (10)Permit Issued (8)Signed Off (3)Violation (60)Inspection (3)Special Inspection (30)
06/05/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/02/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/23/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/09/2026
Permit issued — Boiler Equipment
B01352012-I1-BE
03/06/2026
Permit issued — Plumbing
B01352012-S1-PL
02/18/2026
Filed — Alteration
GAS CONNECTION TO REPLACEMENT GAS BOILERS AND HOT WATER HEATERS. INSTALL DOMESTIC HOT WATER STORAGE TANKS. AKA 129 NORTH 3RD STREET, BROOKLYN
B01352012-I1
02/18/2026
Filed — Alteration
GAS CONNECTION TO REPLACEMENT GAS BOILERS AND HOT WATER HEATERS. INSTALL DOMESTIC HOT WATER STORAGE TANKS. AKA 129 NORTH 3RD STREET, BROOKLYN
B01352012-S1
02/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
02/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
02/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
02/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
02/06/2026
Special inspection requirement — Maintenance information
LOUIS ARENA
02/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
02/03/2026
Permit issued — Sign
B01339034-I1-SG
02/03/2026
Permit issued — Sign
B01339030-I1-SG
02/03/2026
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
02/03/2026
Special inspection requirement — Maintenance information
LOUIS ARENA
02/03/2026
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
02/03/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
01/30/2026
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
01/30/2026
Special inspection requirement — Heating Systems
LOUIS ARENA
01/23/2026
Filed — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS SIGN ON WALL FOR CITIZENS BANK ON BEDFORD AVE ELEVATION.
B01339034-I1
01/23/2026
Filed — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN FOR CITIZENS BANK ON N. 3RD STREET.
B01339030-I1
12/22/2025
Special inspection requirement — Final
JERE MURDOCH
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/10/2025
Filed — Alteration
MODIFICATIONS TO THE EXISTING HVAC SYSTEM ON THE 1ST AND 2ND FLOORS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01212922-P1
10/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
Dave Wall
10/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
Dave Wall
10/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Dave Wall
10/10/2025
Special inspection requirement — Duct leakage testing, insulation and design
Dave Wall
10/10/2025
Special inspection requirement — Mechanical Systems
Dave Wall
10/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Dave Wall
10/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
Dave Wall
10/10/2025
Special inspection requirement — Energy Code Compliance Inspections
Dave Wall
10/10/2025
Special inspection requirement — Post-installed Anchors
Dave Wall
10/10/2025
Special inspection requirement — Final
Dave Wall
10/10/2025
Special inspection requirement — Maintenance information
Dave Wall
08/13/2025
Special inspection requirement — Final
Dave Wall
08/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Dave Wall
08/13/2025
Special inspection requirement — Mechanical Systems
Dave Wall
08/13/2025
Special inspection requirement — Post-installed Anchors
Dave Wall
08/13/2025
Special inspection requirement — Tenant Protection Plan Compliance
Dave Wall
08/13/2025
Special inspection requirement — Energy Code Compliance Inspections
Dave Wall
05/20/2025
Permit issued — Mechanical Systems
B01212922-I1-MS
04/25/2025
Filed — Alteration
MODIFICATIONS TO THE EXISTING HVAC SYSTEM ON THE 1ST AND 2ND FLOORS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01212922-I1
04/25/2025
Violation issued (FDNY_NOV, closed)
01/30/2025
Violation issued (HPD, closed)
A
12/12/2024
Violation issued (ECB, closed)
Construction
10/16/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/08/2024
Violation issued (ECB, open)
Elevators
07/07/2024
Violation issued (HPD, closed)
C
06/28/2024
Violation issued (HPD, closed)
B
06/28/2024
Violation issued (HPD, closed)
B
06/26/2024
Violation issued (HPD, closed)
B
07/29/2023
Violation issued (HPD, open)
C
06/28/2023
Violation issued (HPD, open)
C
06/28/2023
Violation issued (HPD, closed)
C
06/28/2023
Violation issued (HPD, closed)
A
06/28/2023
Violation issued (HPD, closed)
C
Latest 60 of 114 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedP.H. WORKS INC03/09/2026
DOB NOWPlumbingPermit IssuedP.H. WORKS INC03/06/2026
DOB NOWSignPermit IssuedNORTH SHORE NEON SIGN CO02/03/2026
DOB NOWSignPermit IssuedNORTH SHORE NEON SIGN CO02/03/2026
DOB NOWMechanical SystemsPermit IssuedCOIL TECHS HVAC SERVICES05/20/2025
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO11/23/2021
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO11/23/2021
DOB NOWMechanical SystemsSigned-offM. FRIED STORE FIXTURES,03/10/2021
BISMHISSUEDBAR CONSTRUCTION SERVICES06/18/2021
BISSPISSUEDPRECISION PLBG SVCS., INC08/23/2013
BISPLISSUEDHYDRO TECH MECHANICAL CORP08/23/2013
BISSPISSUEDSKINNER PLMNG & HTG CORP06/27/2012
BISSPISSUEDMERCURY FIRE SUPP INC05/04/2012
BISPLISSUEDSKINNER PLUMBING & HEATING12/02/2011
BISMHISSUEDGAZEBO CONTRACTING INC12/01/2011
BISBLISSUEDHYDRO TECH MECHANICAL CORP11/10/2011
BISOTISSUEDGAZEBO CONTRACTING INC10/11/2011
BISSPISSUEDPRECISION PLBG SVCS., INC01/13/2011
BISSPISSUEDMANHATTAN AUTO SPRINKLER10/12/2010
BISSPISSUEDRAM FIRE PROTECTION CORP09/30/2010
BISSPISSUEDMANHATTAN AUTOMATIC SPR07/19/2010
BISMHISSUEDDUANE READE - A NY PARTNE07/14/2010
BISOTISSUEDDUANE READE - A NY PARTNE06/28/2010
BISOTISSUEDACC CONSTRUCTION CORP04/27/2010
BISMHISSUEDACC CONSTRUCTION CORP04/27/2010
BISMHISSUEDACC CONSTRUCTION CORP04/16/2010
BISOTISSUEDACC CONSTRUCTION CORP04/16/2010
BISEQISSUEDH & B CONSTRUCTION NY INC01/04/2010
BISEQISSUEDJANBAR INC11/23/2009
BISOTISSUEDJANBAR INC11/23/2009
BISOTISSUEDJANBAR INC01/26/2009
BISEQISSUEDH & B CONSTRUCTION NY INC01/14/2009
BISEQISSUEDH & B CONSTRUCTION NY INC.02/25/2008
BISEQISSUEDH & B CONST11/28/2007
BISOTISSUEDALCON BUILDERS GROUP, INC.10/24/2007
BISEQISSUEDALCON BUILDERS GROUP, INC.10/24/2007
BISEQISSUEDKREW MAINTENANCE01/05/2007
BISEQISSUEDKREW MAINTENANCE01/05/2007
BISEQISSUEDKREW MAINTENANCE01/05/2007
BISEQISSUEDKREW MAINTENANCE12/05/2006
+ 8 more permits on file
1 project · most recent 10/10/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/10/2025Permit IssuedCOIL TECHS HVAC SERVICESHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PFFY-P12NRMU-E 35,000 BTU · Vrf Indoor ×18
PEFY-P24NMAU-E4 27,000 BTU · Vrf Indoor ×8
PEFY-P12NMAU-E4 13,500 BTU · Vrf Indoor ×6
PEFY-P54NMHU-E4 60,000 BTU · Vrf Indoor ×4
PFFY-P06NRMU-E 6,700 BTU · Vrf Indoor ×4
PUHY-EP120TNU-A1 135,000 BTU · Vrf Outdoor ×2
PUHY-EP384TSNU-A1 160,000 BTU · Vrf Outdoor ×2
6 projects · most recent 08/20/2026
General Wiring Lighting
FiledStatusContractorScope
08/20/2026Permit IssuedMARTINEZ ELECTRICAL CONTGeneral Wiring
05/22/2025Permit IssuedD'ALCO ELECTRICAL, INC.General Wiring
03/27/2023CompleteSRM ELECTRICAL SVC INCGeneral Wiring, Lighting
01/20/2022CompleteCITY ELEC'L SIGN ERECTORS—
01/20/2022CompleteCITY ELEC'L SIGN ERECTORS—
08/25/2020CompleteFQE ELECTRIC LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/05/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/02/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/23/2026Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
02/12/2026Tenant Protection Plan ComplianceLOUIS ARENAspecial
02/12/2026Tenant Protection Plan ComplianceLOUIS ARENAspecial
02/06/2026HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
02/06/2026HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
02/06/2026Maintenance informationLOUIS ARENAenergy_progress
02/06/2026HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
02/03/2026HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
02/03/2026Maintenance informationLOUIS ARENAenergy_progress
02/03/2026HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
02/03/2026HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
01/30/2026Energy Code Compliance InspectionsLOUIS ARENAprogress
01/30/2026Heating SystemsLOUIS ARENAspecial
12/22/2025FinalJERE MURDOCHprogress
10/10/2025HVAC-R and service water heating equipmentDave Wallenergy_progress
10/10/2025HVAC-R and service water heating system controlsDave Wallenergy_progress
10/10/2025HVAC-R and service water piping design and insulationDave Wallenergy_progress
10/10/2025Duct leakage testing, insulation and designDave Wallenergy_progress
10/10/2025Mechanical SystemsDave Wallspecial
10/10/2025Fire-Resistant Penetrations and JointsDave Wallspecial
10/10/2025Tenant Protection Plan ComplianceDave Wallspecial
10/10/2025Energy Code Compliance InspectionsDave Wallprogress
10/10/2025Post-installed AnchorsDave Wallspecial
10/10/2025FinalDave Wallprogress
10/10/2025Maintenance informationDave Wallenergy_progress
08/13/2025FinalDave Wallprogress
Latest 25 of 50.
▾Documents — 518 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch8
08/31/2026B00622935-I1Request digital key ↗
08/31/2026B00622931-I1Request digital key ↗
08/20/2026B01212922-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/01/2026B00451577-I1Request digital key ↗
08/15/2026B00451577-P1Request digital key ↗
▸Applications & Permits99
▸BISPLAN / WORK APPROVAL APPLICATION61
05/26/2021321300043Open ↗
05/30/2020320493667Open ↗
01/21/2016321300043Open ↗
Showing 3 of 61 on file for this type
▸BISWORK PERMIT APPLICATION29
06/18/2021321300043Open ↗
06/14/2021321300043Open ↗
06/10/2021321300043Open ↗
Showing 3 of 29 on file for this type
▸BISPLACE OF ASSEMBLY3
06/08/2020320493667Open ↗
05/30/2020320493667Open ↗
06/15/2012320493667Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
01/10/2020320493667Open ↗
11/21/2019320493667Open ↗
11/13/2019321300043Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
03/05/2013320713821Open ↗
Showing 1 of 2 on file for this type
▸BISPLACE OF ASSEMBLY SIGN OFF1
12/03/2014320493667Open ↗
▸Seals & Professional Certifications122
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION43
01/21/2016321300043Open ↗
07/27/2015320493667Open ↗
07/27/2015320493667Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWProgress Inspector Seal & Signature34
09/23/2026B01352012-S1Open ↗
09/01/2026B00451577-I1Open ↗
09/01/2026B00451577-I1Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/23/2026B01352012-S1Open ↗
09/01/2026B00451577-I1Open ↗
08/29/2026B01352012-I1Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
01/21/2016321300043Open ↗
07/11/2013320787788Open ↗
11/28/2011320397584Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/01/2026B00451577-P1Open ↗
09/01/2026B00451577-I1Open ↗
08/20/2026B01212922-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM8
07/11/2013320787788Open ↗
11/28/2011320397584Open ↗
Showing 2 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/21/2016321300043Open ↗
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment65
▸BISSELF-CERT PLUMBING NOTICE19
07/10/2014320787788Open ↗
02/01/2014320787788Open ↗
03/07/2013320395513Open ↗
Showing 3 of 19 on file for this type
▸BISSCHEDULE B - PLUMBING15
01/30/2014320787788Open ↗
10/09/2013320787788Open ↗
07/11/2013320787788Open ↗
Showing 3 of 15 on file for this type
▸BISEQUIPMENT USE PERMITS7
07/21/2021321300043Open ↗
07/21/2021321300043Open ↗
07/21/2021321300043Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT6
08/22/2012320183341Open ↗
Showing 1 of 6 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA6
06/30/2015320282546Open ↗
06/29/2015320282546Open ↗
08/29/2014320240949Open ↗
Showing 3 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
07/21/2021321300043Open ↗
07/21/2021321300043Open ↗
07/08/2021321300043Open ↗
Showing 3 of 5 on file for this type
▸BISSPRINKLER INSP REPORT : FP-855
03/07/2013320395513Open ↗
06/09/2012320175617Open ↗
Showing 2 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
01/30/2014320787788Open ↗
01/03/2014320787788Open ↗
▸Safety & Tenant Protection12
▸DOB NOWHPD-1: Anti-Harassment Area Checklist8
08/13/2026B00622935-I1Open ↗
08/13/2026B01352012-S1Open ↗
08/13/2026B01212922-P1Open ↗
Showing 3 of 8 on file for this type
▸BISHPD-1 - Anti-Harassment Area Checklist3
02/15/2012320411247Open ↗
Showing 1 of 3 on file for this type
▸BISANTI-HARASSMENT CHECKLIST1
07/11/2013320787788Open ↗
▸Environmental & Asbestos22
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/01/2026B00451577-P1Open ↗
09/01/2026B00451577-I1Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY4
03/26/2012320356707Open ↗
12/23/2011320411247Open ↗
Showing 2 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
01/21/2016321300043Open ↗
07/22/2014320397584Open ↗
06/23/2014320397584Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
07/22/2014320397584Open ↗
03/26/2012320356707Open ↗
▸BISEMERGENCY LIGHTING(IF NOT IN COMPLIANCE WITH MEMO 2/18/81)1
07/27/2015320493667Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/08/2021321300043Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00451577-I1Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY2
07/08/2021321300043Open ↗
07/08/2021321300043Open ↗
▸BISHYDRO FLOW TEST LETTER2
03/05/2013320395513Open ↗
05/29/2012320395513Open ↗
▸Approvals, Objections & Sign-offs73
▸BISADMINISTRATIVE OBJECTIONS28
07/11/2013320787788Open ↗
06/15/2012320493667Open ↗
12/30/2011320411256Open ↗
Showing 3 of 28 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST28
07/13/2021321300043Open ↗
06/30/2015320282546Open ↗
06/29/2015320282546Open ↗
Showing 3 of 28 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION11
07/28/2015320493667Open ↗
07/27/2015320493667Open ↗
04/25/2014310045411Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE A - OCCUPANCY - USE3
11/07/2012320411256Open ↗
09/19/2012320411256Open ↗
12/30/2011320411256Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISThird Party Electrical Signoff Compliance Report1
05/22/2013320089391Open ↗
▸BISFLAME SPREAD/FIRE LETTER1
07/28/2015320493667Open ↗
▸Cost, Insurance & Ownership46
▸BISCOST AFFIDAVIT44
01/21/2016321300043Open ↗
06/30/2015320282546Open ↗
08/29/2014320240949Open ↗
Showing 3 of 44 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
07/13/2021321300043Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
07/08/2021321300043Open ↗
▸Filing & Intake Forms36
▸BISEFILING COVER SHEET23
01/21/2016321300043Open ↗
07/12/2013320787788Open ↗
02/20/2013320713821Open ↗
Showing 3 of 23 on file for this type
▸BISADDITIONAL INFORMATION10
07/29/2021320493667Open ↗
05/26/2021321300043Open ↗
08/29/2014320240949Open ↗
Showing 3 of 10 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT32
03/05/2013320713821Open ↗
Showing 1 of 2 on file for this type
▸BISBOROUGH INTAKE FORM1
06/14/2021321300043Open ↗
▸Other Documents16
▸BISENVIRONMENTAL -E- DEP NOTICE OF SATIS6
08/29/2014320240949Open ↗
05/13/2013320183341Open ↗
Showing 2 of 6 on file for this type
▸BISENVIRONMENTAL(E) DEP NOTICE TO PROCEED4
08/29/2014320240949Open ↗
Showing 1 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
07/29/2021320493667Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWDHCR Document2
08/13/2026B00622931-I1Open ↗
08/13/2026B00622935-I1Open ↗
▸BISPLOT DIAGRAM1
12/30/2011320411256Open ↗
▸BISOP-129 INTERNAL (SECONDARY) BACKFLOW PREVENTION DEVICE TEST REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type