← Back
BuildNYC
Predominantly retail with other uses
2481 86TH STREET
BROOKLYN · BIN 3185376
💬 Discuss this project
1928Year Built
2Stories
K4Building Class
R5Zoning
3,420 sfGross Floor Area
5Units
0 Active ViolationsFDNY Report ↗
Predominantly retail with other uses · Owner of record: A & J Realty of NY C · 2,000 sf lot · 1.71 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Commercial space energy analysis6p · 2 filings · 16 docs
Site & exteriorCommercial space energy analysis4p · 3 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
A & J Realty of NY C103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
J&R Design and Inspection301/16/2024
Farhad Bassiri-Tehrani101/16/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ecdesign Studio203/21/2026
Highquality Construction VNW603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kle ConstructionGeneral Contractor303/21/2026
Aero ElectricElectrical103/22/2026
High Quality ConstructionGeneral Contractor107/08/2026
American Standard P&H CororpPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
J&R Design and Inspection6637301/16/2024
Building Lifecycle
All (27)Filed (4)Permit Issued (3)Signed Off (2)Violation (3)Inspection (3)Special Inspection (12)
02/21/2024
Signed off — Alteration
FILE PLUMBING WORK IN CONJUNCTION WITH GC JOB #B00931587. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00939146-I1
02/06/2024
Signed off — Alteration
B00991084-I1
02/05/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/23/2024
Permit issued — General Construction
B00991084-I1-GC
01/18/2024
Special inspection requirement — Tenant Protection Plan Compliance
Robert Truskosky
01/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Truskosky
01/18/2024
Special inspection requirement — Energy Code Compliance Inspections
Robert Truskosky
01/18/2024
Special inspection requirement — HVAC-R and service water heating equipment
Robert Truskosky
01/18/2024
Special inspection requirement — HVAC-R and service water heating system controls
Robert Truskosky
01/18/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Truskosky
01/16/2024
Filed — Alteration
B00991084-I1
01/16/2024
Filed — Alteration
FILE PLUMBING WORK IN CONJUNCTION WITH GC JOB #B00931587. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00939146-P1
01/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Truskosky
01/16/2024
Special inspection requirement — Tenant Protection Plan Compliance
01/16/2024
Special inspection requirement — Energy Code Compliance Inspections
Robert Truskosky
01/16/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Truskosky
01/16/2024
Special inspection requirement — HVAC-R and service water heating system controls
Robert Truskosky
01/16/2024
Special inspection requirement — HVAC-R and service water heating equipment
Robert Truskosky
01/05/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/01/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/05/2023
Permit issued — Plumbing
B00939146-I1-PL
09/29/2023
Permit issued — Mechanical Systems
B00931587-I1-GC-CX
09/26/2023
Filed — Alteration
FILE PLUMBING WORK IN CONJUNCTION WITH GC JOB #B00931587. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00939146-I1
09/26/2023
Filed — Alteration
B00931587-I1
10/15/1992
Violation issued (FDNY_NOV, closed)
08/07/1992
Violation issued (FDNY_NOV, closed)
03/04/1992
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKle Construction01/23/2024
DOB NOWPlumbingSigned-offAmerican Standard P&H Cororp10/05/2023
DOB NOWMechanical SystemsPermit IssuedHigh Quality Construction09/29/2023
BISPLISSUEDChinatown Plumbing & Heating08/04/2004
2 projects · most recent 01/26/2024
General Wiring
FiledStatusContractorScope
01/26/2024CompleteKJK ElectricGeneral Wiring
01/05/2024CompleteAero ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/05/2024Pass-Final General Construction Non-Directive 14PassView ↗
01/05/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/01/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
01/18/2024Tenant Protection Plan ComplianceRobert Truskoskyspecial
01/18/2024Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
01/18/2024Energy Code Compliance InspectionsRobert Truskoskyprogress
01/18/2024HVAC-R and service water heating equipmentRobert Truskoskyenergy_progress
01/18/2024HVAC-R and service water heating system controlsRobert Truskoskyenergy_progress
01/18/2024HVAC-R and service water piping design and insulationRobert Truskoskyenergy_progress
01/16/2024Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
01/16/2024Tenant Protection Plan Compliance—special
01/16/2024Energy Code Compliance InspectionsRobert Truskoskyprogress
01/16/2024HVAC-R and service water piping design and insulationRobert Truskoskyenergy_progress
01/16/2024HVAC-R and service water heating system controlsRobert Truskoskyenergy_progress
01/16/2024HVAC-R and service water heating equipmentRobert Truskoskyenergy_progress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/26/2026B00931587-I1Request digital key ↗
08/26/2026B00939146-I1Request digital key ↗
08/26/2026B00939146-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026B00931587-I1Open ↗
08/13/2026B00939146-I1Open ↗
08/13/2026B00991084-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/21/2026B00939146-I1Open ↗
09/21/2026B00939146-I1Open ↗
08/31/2026B00939146-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/21/2026B00939146-I1Open ↗
09/21/2026B00939146-I1Open ↗
08/31/2026B00939146-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/26/2026B00931587-I1Open ↗
08/13/2026B00939146-P1Open ↗
08/13/2026B00939146-I1Open ↗