← Back
BuildNYC
Elevator apt, fireproof without stores
2484 BEDFORD AVENUE
BROOKLYN · BIN 3428925
💬 Discuss this project
0Year Built
6Stories
D3Building Class
R6AZoning
20,389 sfGross Floor Area
25Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: 2484 Bedford · 6,000 sf lot · 3.4 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofTriplex water booster system, cellar level52p · 5 filings · 20 docs
BulkheadMechanical and plumbing work1p · 1 filing · 3 docs
Floor 6Triplex water booster system, cellar level52p · 5 filings · 20 docs
Floor 5Triplex water booster system, cellar level52p · 5 filings · 20 docs
Floor 4Triplex water booster system, cellar level52p · 5 filings · 20 docs
Floor 3Triplex water booster system, cellar level52p · 5 filings · 20 docs
Floor 2Triplex water booster system, cellar level52p · 5 filings · 20 docs
Floor 1Triplex water booster system, cellar level52p · 6 filings · 20 docs
CellarTriplex water booster system, cellar level43p · 3 filings · 20 docs
Site & exteriorTriplex water booster system, cellar level63p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
311 Jefferson Streetllc3707/08/2026
2484 Bedford703/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/20/2019$3.0M—MOLABA LLC → 2484 BEDFORD LLC$147/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Patuxent Engineering603/21/2026
Speedy Expediting2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Park Management USAGeneral Contractor1003/22/2026
Manhattan D EnterprisesScaffold407/08/2026
J & G Construction ServicesScaffold303/21/2026
Park Management USAScaffold303/21/2026
Design 2020Scaffold303/21/2026
S Wieder ArchitectGeneral Contractor203/22/2026
Power Direct ElectricElectrical203/21/2026
Power Direct ElectricGeneral Contractor203/22/2026
Prime Piping & HeatingFire Protection107/08/2026
Design 2020General Contractor107/08/2026
AmokFire Protection107/08/2026
AmokPlumbing107/08/2026
Prime Piping & HeatingPlumbing107/08/2026
Power Direct ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BGM Engineering1514811/30/2021
Building Lifecycle
09/28/2026
Elevator Category 1 inspection report filed
01/31/2026
VC20: failed to conduct required (initial/periodic) inspection or test of water based fire protection system at premises.
FDNY_NOV violation · closed
09/02/2025
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6A,…
HPD violation · closed
06/16/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
04/18/2024
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
84 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPrime Piping & Heating09/14/2021
DOB NOWCurb CutSigned-offPark Management USA08/31/2021
DOB NOWMechanical SystemsSigned-offPark Management USA08/06/2021
DOB NOWSprinklersSigned-offAmb Mechanical07/28/2021
DOB NOWStructuralSigned-offPark Management USA05/11/2021
DOB NOWConstruction FenceSigned-offPark Management USA05/11/2021
DOB NOWSupported ScaffoldSigned-offManhattan D Enterprises03/25/2021
DOB NOWSprinklersSigned-offAmok02/23/2021
DOB NOWSidewalk ShedSigned-offManhattan D Enterprises02/18/2021
DOB NOWPlumbingSigned-offAmok12/24/2020
DOB NOWStructuralSigned-offDesign 202010/28/2020
DOB NOWSidewalk ShedSigned-offJ & G Construction Services07/07/2020
DOB NOWConstruction FenceSigned-offDesign 202005/07/2020
BISEQISSUEDManhattan D Enterprises04/22/2021
BISEQISSUEDManhattan D Enterprises03/26/2021
BIS—ISSUEDDesign 202010/28/2020
BIS—ISSUEDDesign 202010/28/2020
BIS—ISSUEDAll Star 106/26/2020
3 projects · most recent 07/20/2021
General Wiring
FiledStatusContractorScope
07/20/2021CompletePower Direct ElectricGeneral Wiring
02/09/2021CompleteV. Vass Electric—
01/01/2021CompletePower Direct Electric—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
11/16/2021Pass-Final Curb Cut Non-Directive 14PassView ↗
05/27/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
01/21/2022Fire-Resistant Penetrations and JointsJOSEPH BADINTERspecial
11/29/2021Fire-Resistant Penetrations and JointsJOSEPH BADINTERspecial
11/03/2021Sprinkler SystemsJOSEPH BADINTERspecial
11/03/2021Fire-Resistant Penetrations and JointsJOSEPH BADINTERspecial
10/27/2021Sprinkler SystemsJOSEPH BADINTERspecial
10/27/2021Fire-Resistant Penetrations and JointsJOSEPH BADINTERspecial
06/09/2021Fire-Resistant Penetrations and JointsRAUL VELASQUEZ MARTINEZspecial
03/16/2021FinalJOHN O'CONNOR, P.E.progress
03/12/2021FinalSANTIAGO HELMANprogress
09/21/2020Final—progress
09/21/2020Concrete - Cast-In-Place—special
09/21/2020Post-installed Anchors—special
190 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account