ECB07/31/2026AT TIME OF INSPECTION OBSERVED WORKERS TESTING/DRILLING WITHOUT ENGINEER OVERSEEING GEOTECHNICAL INVESTIGATION AS PER 1802.4 CAUSING HAZARDOUS CONDITIONS.PROVIDE ENGINEER$2K due
ECB07/21/2026AT THE INSPECTION OF A 3-STORY HOUSE UNDER A FULL DEMOLITION PERMIT, THE STRUCTURE HAD BEEN DEMOLISHED. A LARGE AMOUNT OF DEMOLITION DEBRIS REMAINED ONSITE AND SCATTERED THROUGHOUT, CREATING HAZARDOUS CONDITION$2K due
ECB05/19/2026AT TIME OF INSPECTION, OBSERVED DEMO SITE, ASBESTOS STREET/STAGING AREA NOT PROPERLY MAINTAINED AT CONSTRUCTION SITE. YODOCK BARRIERS OBSERVED DISPLACED/NOT PROPERLY SECURED, CREATING UNSAFE CONDITION AND HAZAR$3K due
ECB04/30/2026AT TIME OF INSPECTION, 2-STORY BUILDING, ACTIVE WITH WORKERS PERFORMING DEMOLITION OPERATIONS. HOUSEKEEPING CONDITIONS OBSERVED IN POOR CONDITION WITH HEAVY DEBRIS OBSTRUCTING EGRESS PATHS, AND OVERFLOWING DUMP$3K due
ECB04/30/2026AT TIME OF INSPECTION, 2-STORY BUILDING WITH ONGOING DEMOLITION. WINDOWS/GLASS REMAIN IN PLACE AND DEMOLITION NOT PERFORMED SEQUENTIALLY. CONDITION CREATES FALLING DEBRIS AND UNSTABLE STRUCTURE, POSING DANGER T$655 due
ECB03/22/2026UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. NOTED: AT THE TIME OF INSPECTION OBSERVED WORKERS PERFORMING DEMOLITION OPERATIONS. UPON FURTHER RESEARCH OF DOB RECORDS A FULL SWO EXISTS ON PROP$25K due
ECB03/16/2026NO PERMITS WERE AVAILABLE ON SITE FOR ONGOING DEMOLITION WORK. NO SEQUENCE OF OPERATIONS OR DEMOLITION PLANS WERE PRESENTED TO THE INSPECTOR AT TIME OF INSPECTION (ATOI)., OBTAIN PERMIT$6K due
ECB03/16/2026AT TIME OF INSPECTION OBSERVED ACTIVE JOB PERMIT # X01349607-I1-FN WHICH EXPIRES ON 05/04/2026 ARE NOT POSTED AT THE PREMISES., POST/PROPERLY POST PERMIT$2K due
ECB03/16/2026CONSTRUCTION FENCE OBSERVED NOT CONSTRUCTED IN ACCORDANCE WITH CODE REQUIREMENTS. NO ACCESS DOOR/GATE INSTALLED IN FENCE AT TIME OF INSPECTION (ATOI)., COMPLY WITH CODE$5K due
ECB03/16/2026AT TIME OF INSPECTION OBSERVED WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS UNDER JOB X01349607-FN EXPIRES ON 05/04/2026 MISSING DOORS AND OPEN GATE ALSO FENCE PLYWOOD OPEN UNGUARDED., CONFORM WORK$12K due
ECB05/31/2023WORK WITHOUT A PERMIT.NOTED:AT ATTIC-FULL HEIGHT PARTITION WALLS ERECTED TO CREATE (2)BDRMS.AT 2ND FLR-ELECTRICAL WIRING INSTALLED:220V LINEFOR DRYER OUTLET.REM:OBTAIN PERMITS.Nothing owed — awaiting certificate of correction