249-14 CAMBRIA AVENUE
QUEENS · BIN 4171116
💬 Discuss this project
1960Year Built
1Stories
A3Building Class
R2Zoning
2,396 sfGross Floor Area
1Units
Large suburban residence · 5,700 sf lot · 0.42 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Site & exteriorFence installationUnder Construction2p · 1 filing · 2 docs
Filed — no permit issued9p · 1 filing · 4 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/07/2026$1.1M—Private party → CAMBRIA HOLDINGS INC.$440/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ADD209/23/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DHC Power ManagementScaffold109/23/2026
Building Lifecycle
10/14/2026
Objection raised — Other
09/23/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Horizontal and vertical enlargement of existing one family. Obtain new C of O.
Q01461400-I1
09/22/2026
Permit issued — Construction Fence
Q01447944-I1-FN
09/17/2026
Special inspection requirement — Ventilation and air distribution system
09/17/2026
Special inspection requirement — Concrete - Cast-In-Place
32 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedDHC Power Management09/22/2026
1 project · most recent 09/23/2026
Ventilation Systems
FiledStatusContractorScope
09/23/2026——Ventilation Systems
1 project · most recent 08/18/2026
Fence
FiledStatusContractorScope
08/18/2026Permit IssuedDHC Power ManagementFence
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
09/17/2026Ventilation and air distribution system—energy_progress
09/17/2026Concrete - Cast-In-Place—special
09/17/2026Excavations - Sheeting, Shoring, and Bracing—special
09/17/2026Fire-Resistant Penetrations and Joints—special
09/17/2026Heating Systems—special
09/17/2026Masonry—special
09/17/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
09/17/2026Subgrade Inspections—special
09/17/2026Maintenance information—energy_progress
09/17/2026Air barrier - visual inspection—energy_progress
09/17/2026Permanent certificate—energy_progress
09/17/2026Subsurface Investigations (Borings/Test Pits)—special
09/17/2026Energy Code Compliance Inspections—progress
09/17/2026Fire-Resistance Rated Construction—progress
09/17/2026HVAC-R and service water heating equipment—energy_progress
09/17/2026Fenestration air leakage—energy_progress
09/17/2026Electric vehicle service equipment requirements—energy_progress
09/17/2026HVAC-R and service water heating system controls—energy_progress
09/17/2026Fenestration and door U-factor and product ratings—energy_progress
09/17/2026Metering—energy_progress
09/17/2026HVAC-R and service water piping design and insulation—energy_progress
09/17/2026Interior lighting power—energy_progress
09/17/2026Air barrier — testing —energy_progress
09/17/2026Fenestration areas—energy_progress
09/17/2026Insulation placement and R values—energy_progress
Latest 25 of 28.