← Back
BuildNYC
One story retail building
249-20 HILLSIDE AVENUE
QUEENS · Bellerose · BIN 4175485
💬 Discuss this project
1949Year Built
1Stories
K1Building Class
R3-2Zoning
14,000 sfGross Floor Area
7Units
2 Active Violations 0 unresolved · 2 paperwork only 14 likely answered ▸FDNY Report ↗
One story retail building · Owner of record: Bell · 20,000 sf lot · 0.7 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofTop HVAC units installation1p · 1 filing · 10 docs
Floor 1Guac-Time15p · 4 filings · 20 docs
Site & exteriorH&R Block Guac Time Mexican Grill1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Bell1807/08/2026
97 Seaview1703/22/2026
Kali & K Construction203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
McHenery Testing Lab202/11/2025
Eab Architectural Designs301/25/2024
AZ Professional Engineering201/13/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Dhillon Consulting403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Empac ContractingGeneral Contractor603/21/2026
DRM ConstructionGeneral Contractor303/21/2026
Arm and HammerGeneral Contractor207/08/2026
Unique Fire SystemsGeneral Contractor203/21/2026
SKY Tech Electrical CoElectrical103/21/2026
Infiniti Esc PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
City-Wide Testing416201/25/2024
AZ Professional Engineering766201/13/2022
Building Lifecycle
All (103)Filed (7)Permit Issued (8)Violation (44)Inspection (1)Objection (18)Special Inspection (25)
12/02/2025
Violation issued (FDNY_NOV, closed)
04/16/2025
Permit issued — General Construction
Q01102736-I1-GC
04/08/2025
Permit issued — General Construction
Q01176606-I1-GC
02/11/2025
Filed — Alteration
HEREWITH FILING FOR REMOVAL OF EXTERIOR SIGNS AND AWNINGS AND CORRECT VIOLATIONS # 35347330N, 35271298Y, 35361496Y AS PER PLANS.
Q01176606-I1
02/07/2025
Permit issued — Mechanical Systems
Q00983264-I1-MS
08/31/2024
Filed — Alteration
Q01102736-I1
07/30/2024
Objection resolved — Addressed
07/01/2024
Violation issued (FDNY_NOV, closed)
06/14/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/12/2024
Permit issued — General Construction
Q00983266-I1-GC
05/31/2024
Objection resolved — Addressed
05/31/2024
Objection resolved — Addressed
05/31/2024
Special inspection requirement — HVAC-R and service water heating system controls
ELIAS RASABI
05/31/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ELIAS RASABI
05/31/2024
Special inspection requirement — HVAC-R and service water heating equipment
ELIAS RASABI
05/16/2024
Permit issued — Plumbing
Q00983265-I1-PL
05/14/2024
Permit issued — General Construction
Q00983266-I1-GC
04/05/2024
Permit issued — General Construction
Q00983266-I1-GC
03/26/2024
Objection resolved — Addressed
03/26/2024
Special inspection requirement — Maintenance information
ELIAS RASABI
03/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
03/26/2024
Special inspection requirement — HVAC-R and service water heating equipment
ELIAS RASABI
03/26/2024
Special inspection requirement — HVAC-R and service water heating system controls
ELIAS RASABI
03/26/2024
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
03/06/2024
Objection resolved — Addressed
02/20/2024
Objection resolved — Addressed
02/20/2024
Objection resolved — Addressed
02/05/2024
Objection resolved — Addressed
02/05/2024
Objection resolved — Addressed
02/05/2024
Special inspection requirement — HVAC-R and service water heating equipment
ELIAS RASABI
02/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
ELIAS RASABI
02/02/2024
Objection raised — Fire_Protection
02/02/2024
Objection raised — Admin
02/02/2024
Objection raised — Inspections
02/02/2024
Objection raised — Fire_Protection
02/02/2024
Objection raised — Fire_Protection
02/02/2024
Objection raised — Inspections
02/02/2024
Objection raised — Inspections
02/02/2024
Objection raised — Accessibility
02/02/2024
Objection raised — Scope
01/25/2024
Filed — Alteration
INSTALLATION OF NEW TYPE 1 HOOD, HVAC UNIT AND BATHROOM EXHAUST FAN
Q00983264-I1
01/25/2024
Filed — Alteration
NO CHANGE IN BULK FLOOR AREA OR OCCUPANCY UNDER THIS APPLICATION. SCOPE OF WORK TO INCLUDE REMOVAL OF EXISTING NON BEARING PARTITIONS, CEILING FINISHES, & PLUMBING FIXTURES, NEW PARTITIONS, NEW FINISHES WALL AND FLOOR THROUGHOUT & NEW TYPE 1 HOOD.
Q00983266-I1
01/25/2024
Filed — Alteration
SCOPE OF WORK TO INCLUDE REMOVAL OF PLUMBING AND INSTALL NEW PLUMBING FIXTURES AND GAS COMMERICAL COOKING EQUIPMENT.
Q00983265-I1
01/19/2024
Special inspection requirement — Maintenance information
ELIAS RASABI
01/19/2024
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
01/19/2024
Special inspection requirement — Duct leakage testing, insulation and design
ELIAS RASABI
01/19/2024
Special inspection requirement — Lighting controls
ELIAS RASABI
01/19/2024
Special inspection requirement — Maintenance information
ELIAS RASABI
01/19/2024
Special inspection requirement — Interior lighting power
ELIAS RASABI
01/19/2024
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
01/19/2024
Special inspection requirement — Duct leakage testing, insulation and design
ELIAS RASABI
01/15/2024
Special inspection requirement — Final
ELIAS RASABI
12/28/2023
Special inspection requirement — Mechanical Systems
ELIAS RASABI
12/28/2023
Special inspection requirement — Final
ELIAS RASABI
10/25/2023
Violation issued (FDNY_NOV, closed)
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 103 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedArm Hammer04/16/2025
DOB NOWGeneral ConstructionPermit IssuedArm Hammer04/08/2025
DOB NOWMechanical SystemsPermit IssuedJJK Building Consulting02/07/2025
DOB NOWGeneral ConstructionPermit IssuedEmpac Contracting06/12/2024
DOB NOWPlumbingPermit IssuedInfiniti Esc Plumbing05/16/2024
DOB NOWGeneral ConstructionPermit IssuedEmpac Contracting05/14/2024
DOB NOWGeneral ConstructionPermit IssuedEmpac Contracting04/05/2024
DOB NOWMechanical SystemsPermit IssuedDRM Construction07/13/2021
BISOTISSUEDKali & K Construction07/27/2017
BIS—ISSUEDNeptune Signs & Awnings07/21/2016
BISMHISSUEDNY Eagle Construction06/17/2013
BISFPISSUEDNY Fire04/30/2012
BISPLISSUEDCatman Plumbing03/02/2012
BISMHISSUEDLiu Jin Interior Contracting02/27/2012
BISPLISSUEDDoug's Plumbing & Heating Service Co04/14/2011
BISOTISSUEDNorth Pole Air Condition03/21/2011
BISMHISSUEDNorth Pole Air Condition03/21/2011
BIS—ISSUEDNew York Sign City02/26/2004
BISPLISSUEDJodinan Plumbing & Heating12/22/1998
BISOTISSUEDA. P. General Cont11/27/1998
BISOTISSUEDHerco Mach10/14/1994
BISMHISSUEDDual Fuel Plumbing & Heating05/15/1992
2 projects · most recent 01/25/2024
Heating and Air Conditioning Systems Ventilation Systems Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
01/25/2024Permit IssuedUnique Fire SystemsHeating and Air Conditioning Systems, Ventilation Systems—
01/13/2022Permit IssuedDRM ConstructionAir Conditioning Systems, Heating Systems
Cooling
York ZF150N24D2A1BAA1A1 156,000 BTU · Rooftop Unit ×8
Heating
York ZF150N24D2A1BAA1A1 240,000 BTU · Rooftop Unit ×8
1 project · most recent 01/25/2024
Gas Water/Sanitary
FiledStatusContractorScope
01/25/2024Permit IssuedInfiniti Esc PlumbingGas, Water/Sanitary
1 project · most recent 04/16/2024
General Wiring
FiledStatusContractorScope
04/16/2024Permit IssuedJoseph Weinstein ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
06/14/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
05/31/2024HVAC-R and service water heating system controlsELIAS RASABIenergy_progress
05/31/2024HVAC-R and service water piping design and insulationELIAS RASABIenergy_progress
05/31/2024HVAC-R and service water heating equipmentELIAS RASABIenergy_progress
03/26/2024Maintenance informationELIAS RASABIenergy_progress
03/26/2024Fire-Resistant Penetrations and JointsELIAS RASABIspecial
03/26/2024HVAC-R and service water heating equipmentELIAS RASABIenergy_progress
03/26/2024HVAC-R and service water heating system controlsELIAS RASABIenergy_progress
03/26/2024Energy Code Compliance InspectionsELIAS RASABIprogress
02/05/2024HVAC-R and service water heating equipmentELIAS RASABIenergy_progress
02/05/2024HVAC-R and service water heating system controlsELIAS RASABIenergy_progress
01/19/2024Maintenance informationELIAS RASABIenergy_progress
01/19/2024Energy Code Compliance InspectionsELIAS RASABIprogress
01/19/2024Duct leakage testing, insulation and designELIAS RASABIenergy_progress
01/19/2024Lighting controlsELIAS RASABIenergy_progress
01/19/2024Maintenance informationELIAS RASABIenergy_progress
01/19/2024Interior lighting powerELIAS RASABIenergy_progress
01/19/2024Energy Code Compliance InspectionsELIAS RASABIprogress
01/19/2024Duct leakage testing, insulation and designELIAS RASABIenergy_progress
01/15/2024FinalELIAS RASABIprogress
12/28/2023Mechanical SystemsELIAS RASABIspecial
12/28/2023FinalELIAS RASABIprogress
01/12/2022FinalVIJAY KUMARprogress
01/12/2022Mechanical SystemsVIJAY KUMARspecial
04/20/2021Mechanical SystemsVIJAY KUMARspecial
04/20/2021FinalVIJAY KUMARprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
H&R Block Guac Time Mexican GrillRetailFloor 1
Project Q01176606 Alteration · Permit Entire · 02/11/2025
Guac-TimeRestaurant / Food ServiceFloor 1
Project Q00983264 Alteration · Permit Entire · 01/25/2024
Project Q00983265 Alteration · Permit Entire · 01/25/2024
Project Q00983266 Alteration · Permit Entire · 01/25/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 152 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/26/2026Q00507376-S1Request digital key ↗
08/26/2026Q00507376-I1Request digital key ↗
08/23/2026Q00983266-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits23
▸BISPLAN / WORK APPROVAL APPLICATION15
02/01/2019421690995Open ↗
07/26/2017440418317Open ↗
07/25/2016421350825Open ↗
Showing 3 of 15 on file for this type
▸BISWORK PERMIT APPLICATION7
07/26/2017440418317Open ↗
07/25/2016421350825Open ↗
05/03/2012420534194Open ↗
Showing 3 of 7 on file for this type
▸BISIntent to Revoke Approval/Permit1
03/05/2013420530054Open ↗
▸Seals & Professional Certifications42
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
11/18/2019440418317Open ↗
09/18/2019440418317Open ↗
02/01/2019421690995Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
08/29/2026Q00507376-I1Open ↗
08/29/2026Q00507376-S1Open ↗
08/27/2026Q00983266-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/26/2026Q00507376-I1Open ↗
08/26/2026Q00507376-S1Open ↗
08/23/2026Q00983265-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
02/01/2019421690995Open ↗
07/26/2017440418317Open ↗
07/25/2016421350825Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
02/01/2019421690995Open ↗
07/25/2016421350825Open ↗
06/29/2016421341364Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/29/2026Q00507376-I1Open ↗
08/29/2026Q00507376-S1Open ↗
08/26/2026Q00983265-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
02/17/2012420530054Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/26/2017440418317Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/26/2017440418317Open ↗
▸Trade Schedules & Equipment13
▸BISSELF-CERT PLUMBING NOTICE5
05/17/2012420530054Open ↗
05/07/2012420530054Open ↗
04/28/2012420530054Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING3
03/28/2012420530054Open ↗
02/17/2012420530054Open ↗
02/04/2011420312959Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
08/15/2013420312959Open ↗
08/01/2013420312959Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
02/01/2019421690995Open ↗
06/29/2016421341364Open ↗
▸BISEQUIPMENT USE PERMITS1
08/14/2013420312959Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
03/07/2013420808040Open ↗
▸BISTenant Protection Plan and Notes1
06/29/2016421341364Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/26/2026Q00507376-S1Open ↗
08/26/2026Q00507376-I1Open ↗
08/23/2026Q00983265-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
02/01/2019421690995Open ↗
07/26/2017440418317Open ↗
07/25/2016421350825Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
03/07/2012420534194Open ↗
02/17/2012420530054Open ↗
02/04/2011420312959Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
11/18/2019440418317Open ↗
09/18/2019440418317Open ↗
02/01/2019421690995Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
11/18/2019440418317Open ↗
09/18/2019440418317Open ↗
08/15/2013420312959Open ↗
▸BISTECHNICAL REPORT: ENERGY1
02/17/2012420530054Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/26/2017440418317Open ↗
▸BISTR8: Energy Code Progress Inspections1
05/10/2013420312959Open ↗
▸Inspections & Test Reports2
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
09/18/2019440418317Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/26/2017440418317Open ↗
▸Approvals, Objections & Sign-offs9
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
11/18/2019440418317Open ↗
09/27/2019440418317Open ↗
09/19/2019440418317Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
03/07/2013420808040Open ↗
03/07/2012420534194Open ↗
02/17/2012420530054Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
11/18/2019440418317Open ↗
08/15/2013420312959Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT12
11/18/2019440418317Open ↗
09/18/2019440418317Open ↗
02/01/2019421690995Open ↗
Showing 3 of 12 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST1
07/27/2017440418317Open ↗
▸Filing & Intake Forms11
▸BISEFILING COVER SHEET8
02/01/2019421690995Open ↗
07/22/2016421350825Open ↗
06/29/2016421341364Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
07/26/2017440418317Open ↗
▸BISADDITIONAL INFORMATION1
03/28/2012420530054Open ↗
▸BISBOROUGH INTAKE FORM1
11/18/2019440418317Open ↗
▸Other Documents1
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS1
05/17/2012420530054Open ↗