249-28 THEBES AVENUE
QUEENS · BIN 4171022
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R2AZoning
1,364 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,000 sf lot · 0.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof2p · 1 filing · 8 docs
Floor 14p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Tom Petersen Architect109/06/2025
A. Giannopoulos Architects307/10/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Manhattan ConstructionGeneral Contractor203/21/2026
770 Electricspecialty_contractor104/09/2026
Flint MechanicalPlumbing107/08/2026
770 ElectricGeneral Contractor109/05/2018
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Thomas Petersen Architect7854109/06/2025
A. Giannopoulos Architect2196307/10/2023
Building Lifecycle
11/25/2025
Permit expired, never signed off — Solar
The city's record still shows this permit as issued, with no sign-off on its filing
Q01283109-I1-SL
09/11/2025
Permit issued — Solar
Q01283109-I1-SL
09/06/2025
Filed — Alteration
Installation of PV System on existing rooftop. No changes to Egress or use of occupancy.
Q01283109-I1
09/06/2025
Special inspection requirement — Air barrier - visual inspection
TOM PETERSEN
09/06/2025
Special inspection requirement — Final
TOM PETERSEN
43 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit Issued770 Electric09/11/2025
DOB NOWPlumbingSigned-offFlint Mechanical01/06/2023
DOB NOWStructuralSigned-offManhattan Construction12/06/2022
BISOTISSUED770 Electric09/05/2018
1 project · most recent 07/10/2023
Air Conditioning Systems
FiledStatusContractorScope
07/10/2023Signed-offManhattan ConstructionAir Conditioning Systems
4 projects · most recent 07/24/2026
General Wiring
FiledStatusContractorScope
07/24/2026CompleteGrid City Electric—
06/05/2023CompleteEos ElectricalGeneral Wiring
10/15/2020CompleteRiviera ElectricGeneral Wiring
08/09/2018CompleteGrid City Electric—
1 project · most recent 07/10/2023
FiledStatusContractorScope
07/10/2023Signed-offManhattan Construction—
1 project · most recent 09/06/2025
FiledStatusContractorScope
09/06/2025Permit Issued770 Electric—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/01/2023Pass-Final General Construction Non-Directive 14PassView ↗
05/22/2023Fail-Final General Construction Non-Directive 14FailView ↗
05/16/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/03/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/03/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
09/06/2025Air barrier - visual inspectionTOM PETERSENenergy_progress
09/06/2025FinalTOM PETERSENprogress
09/06/2025Energy Code Compliance InspectionsTOM PETERSENprogress
09/06/2025Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
09/06/2025Fire-Resistant Penetrations and JointsTOM PETERSENspecial
07/23/2023Fenestration and door U-factor and product ratingsANASTASIOS GIANNOPOULOSenergy_progress
07/23/2023Air barrier - visual inspectionANASTASIOS GIANNOPOULOSenergy_progress
07/23/2023Fenestration air leakageANASTASIOS GIANNOPOULOSenergy_progress
07/23/2023Fenestration areasANASTASIOS GIANNOPOULOSenergy_progress
07/23/2023Interior lighting powerANASTASIOS GIANNOPOULOSenergy_progress
07/23/2023Mechanical SystemsANASTASIOS GIANNOPOULOSspecial
07/23/2023Fire-Resistant Penetrations and JointsANASTASIOS GIANNOPOULOSspecial
07/23/2023Structural Stability – Alterations of existing buildingsANASTASIOS GIANNOPOULOSspecial
07/23/2023FinalANASTASIOS GIANNOPOULOSprogress
07/23/2023Insulation placement and R valuesANASTASIOS GIANNOPOULOSenergy_progress
05/23/2023Mechanical SystemsANASTASIOS GIANNOPOULOSspecial
05/23/2023Structural Stability – Alterations of existing buildingsANASTASIOS GIANNOPOULOSspecial
05/23/2023FinalANASTASIOS GIANNOPOULOSprogress
05/23/2023Fenestration and door U-factor and product ratingsANASTASIOS GIANNOPOULOSenergy_progress
05/23/2023Interior lighting powerANASTASIOS GIANNOPOULOSenergy_progress
05/23/2023Air barrier - visual inspectionANASTASIOS GIANNOPOULOSenergy_progress
05/23/2023Fire-Resistant Penetrations and JointsANASTASIOS GIANNOPOULOSspecial
05/23/2023Insulation placement and R valuesANASTASIOS GIANNOPOULOSenergy_progress
05/23/2023Fenestration areasANASTASIOS GIANNOPOULOSenergy_progress
05/23/2023Fenestration air leakageANASTASIOS GIANNOPOULOSenergy_progress
Latest 25 of 27.
58 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account