← Back
Two stories - detached, small or mid-size
249 MORRISON AVENUE
STATEN ISLAND · West New Brighton-Silver Lake-Grymes Hill · BIN 5008257
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R3-1Zoning
1,352 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,500 sf lot · 0.39 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Filed — no permit issued4p · 2 filings · 19 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MICHAEL DERUVO & ASSOC. ARCHITECTS203/17/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L. GASS403/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738103/17/2025
Building Lifecycle
All (36)Filed (2)Objection (16)Special Inspection (18)
05/05/2025
Objection resolved — Addressed
05/05/2025
Objection resolved — Addressed
05/05/2025
Objection resolved — Addressed
05/05/2025
Objection resolved — Addressed
05/02/2025
Objection raised — Zoning
04/30/2025
Objection resolved — Addressed
04/09/2025
Objection resolved — Addressed
03/26/2025
Objection resolved — Addressed
03/26/2025
Objection resolved — Addressed
03/20/2025
Objection raised — Energy
03/20/2025
Objection raised — Zoning
03/20/2025
Objection raised — Admin
03/20/2025
Objection raised — Zoning
03/20/2025
Objection raised — Zoning
03/20/2025
Objection raised — Zoning
03/20/2025
Objection raised — Scope
03/17/2025
Filed — Alteration
APPLICATION FILED HEREWITH FOR PROPOSED HORIZONTAL FIRST FLOOR ADDITION TO EXISTING TWO STORY RESIDENCE. ALL PLUMBING WORK FILED UNDER SEPARATE DOB NOW APPLICATION.
S01193961-I1
03/17/2025
Filed — Alteration
APPLICATION FILED HEREWITH FOR PLUMBING WORK TO BE DONE IN CONJUNCTION WITH ALTERATION TYPE 2 OT APPLICATION.
S01195160-I1
03/14/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MICHAEL DERUVO
03/14/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
03/14/2025
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
03/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
03/14/2025
Special inspection requirement — Subgrade Inspections
anthony santoro
03/14/2025
Special inspection requirement — Air barrier - visual inspection
MICHAEL DERUVO
03/14/2025
Special inspection requirement — Maintenance information
MICHAEL DERUVO
03/14/2025
Special inspection requirement — Permanent certificate
MICHAEL DERUVO
03/14/2025
Special inspection requirement — Energy Code Compliance Inspections
MICHAEL DERUVO
03/14/2025
Special inspection requirement — Fire-Resistance Rated Construction
MICHAEL DERUVO
03/14/2025
Special inspection requirement — Preliminary
MICHAEL DERUVO
03/14/2025
Special inspection requirement — Fenestration areas
MICHAEL DERUVO
03/14/2025
Special inspection requirement — Air barrier — testing
MICHAEL DERUVO
03/14/2025
Special inspection requirement — Insulation placement and R values
MICHAEL DERUVO
03/14/2025
Special inspection requirement — Fenestration air leakage
MICHAEL DERUVO
03/12/2025
Special inspection requirement — Final
MICHAEL DERUVO
03/12/2025
Special inspection requirement — Footing and Foundation
MICHAEL DERUVO
03/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
anthony santoro
Nothing on file for this building.
1 project · most recent 03/17/2025
Gas Water/Sanitary
FiledStatusContractorScope
03/17/2025——Gas, Water/Sanitary
1 project · most recent 10/25/2019
FiledStatusContractorScope
10/25/2019Permit IssuedMANGI ELECTRICAL CORP1 meters, 1 new_meters
1 project · most recent 03/17/2025
FiledStatusContractorScope
03/17/2025——1 scope_items
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
03/14/2025Fenestration and door U-factor and product ratingsMICHAEL DERUVOenergy_progress
03/14/2025Subsurface Investigations (Borings/Test Pits)—special
03/14/2025Concrete - Cast-In-Placeanthony santorospecial
03/14/2025Fire-Resistant Penetrations and Jointsanthony santorospecial
03/14/2025Subgrade Inspectionsanthony santorospecial
03/14/2025Air barrier - visual inspectionMICHAEL DERUVOenergy_progress
03/14/2025Maintenance informationMICHAEL DERUVOenergy_progress
03/14/2025Permanent certificateMICHAEL DERUVOenergy_progress
03/14/2025Energy Code Compliance InspectionsMICHAEL DERUVOprogress
03/14/2025Fire-Resistance Rated ConstructionMICHAEL DERUVOprogress
03/14/2025PreliminaryMICHAEL DERUVOprogress
03/14/2025Fenestration areasMICHAEL DERUVOenergy_progress
03/14/2025Air barrier — testing MICHAEL DERUVOenergy_progress
03/14/2025Insulation placement and R valuesMICHAEL DERUVOenergy_progress
03/14/2025Fenestration air leakageMICHAEL DERUVOenergy_progress
03/12/2025FinalMICHAEL DERUVOprogress
03/12/2025Footing and FoundationMICHAEL DERUVOprogress
03/12/2025Structural Stability – Alterations of existing buildingsanthony santorospecial
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/20/2026S01195160-I1Request digital key ↗
08/20/2026S01193961-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S01193961-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S01193961-I1Open ↗
▸Seals & Professional Certifications11
▸DOB NOWProgress Inspector Seal & Signature9
08/25/2026S01193961-I1Open ↗
08/25/2026S01193961-I1Open ↗
08/25/2026S01193961-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026S01195160-I1Open ↗
08/13/2026S01193961-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/13/2026S01193961-I1Open ↗
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/13/2026S01193961-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S01193961-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026S01193961-I1Open ↗