← Back
Office with commercial, 7-19 stories
249 WEST 34 STREET
MANHATTAN · BIN 1014398
💬 Discuss this project
1925Year Built
7Stories
O6Building Class
C6-4MZoning
14,686 sfGross Floor Area
18Units
11 Open Violations ▸FISP: UNSAFEFDNY Report ↗
Office with commercial, 7-19 stories · Owner of record: HW W 34TH ST LLC · 2,254 sf lot · 6.52 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectrical
Roof4p · 3 filings · 14 docs
Floor 72p · 2 filings · 13 docs
Floor 62p · 2 filings · 13 docs
Floor 52p · 2 filings · 13 docs
Floor 42p · 2 filings · 13 docs
Floor 32p · 2 filings · 13 docs
Floor 22p · 2 filings · 13 docs
Floor 12p · 2 filings · 13 docs
Cellar1p · 1 filing · 4 docs
2 jobs · most recent 02/21/2022
FiledStatusContractorScope
02/21/2022Permit IssuedTOP SHELF ELECTRIC CORP—
05/18/2021Permit IssuedRICHARD NEU—
3 jobs · most recent 01/29/2026
Fence Scaffold Sidewalk Shed
FiledStatusContractorScope
01/29/2026Permit IssuedCELTIC SERVICES NYC INCFence
08/16/2022Permit IssuedAVARGA CONSTRUCTION CORPScaffold
07/06/2022Permit IssuedAVARGA CONSTRUCTION CORPSidewalk Shed
1 job · most recent 08/17/2026
FiledStatusContractorScope
08/17/2026Permit IssuedCENTRAL CONSTRUCTION MGMT—
Building Lifecycle
All (161)Filed (19)Permit Issued (29)Signed Off (7)Facade (FISP) (22)Violation (45)Inspection (1)Objection (31)Special Inspection (7)
09/16/2026
Objection raised — Other
09/01/2026
Permit issued — Suspended Scaffold
M01446601-I1-SC
08/26/2026
Filed — Alteration
CONTAINMENT NETTING TO BE INSTALLED AS A MEANS OF PROTECTION TO THE PUBLIC IN ACCORDANCE WITH DOB 2013-006 BULLETIN SECTION I
M01438343-I1
08/17/2026
Filed — Alteration
INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS
M01446601-I1
07/13/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/02/2026
Permit issued — Sidewalk Shed
M00766755-I1-SH
05/18/2026
Signed off — Alteration
REMOVAL OF NON-LOAD BEARING INTERIOR PARTITIONS, CEILINGS, FLOORS, FINISHES AND MECHANICAL SYSTEMS, BOILERS, ELEVATORS AS INDICATED. THERE IS NO CHANGE TO USE, EGRESS, OCCUPANCY.
M01317709-I1
04/01/2026
Permit issued — Sidewalk Shed
M00766755-I1-SH
03/03/2026
Objection resolved — Addressed
01/29/2026
Filed — Full Demolition
FULL DEMOLITION OF 7 STORY BUILDING USING MECH MEANS TO ASSIST
M01317708-S3
01/13/2026
Cycle 9 facade report signed — UNSAFE
12/31/2025
Cycle 9 facade report submitted
12/22/2025
Signed off — Alteration
M00991562-I1
12/19/2025
Permit issued — Suspended Scaffold
M00991562-I1-SC
12/15/2025
Objection raised — Admin
12/10/2025
Permit issued — Protection and Mechanical Methods
M01317708-S1-PMM
11/25/2025
Permit issued — General Construction
M01317709-I1-GC
11/20/2025
Filed — Full Demolition
FULL DEMOLITION OF 7 STORY BUILDING USING MECH MEANS TO ASSIST
M01317708-S2
11/18/2025
Filed — Full Demolition
FULL DEMOLITION OF 7 STORY BUILDING USING MECH MEANS TO ASSIST
M01317708-S1
11/18/2025
Cycle 9 facade inspection completed
11/17/2025
Filed — Alteration
REMOVAL OF NON-LOAD BEARING INTERIOR PARTITIONS, CEILINGS, FLOORS, FINISHES AND MECHANICAL SYSTEMS, BOILERS, ELEVATORS AS INDICATED. THERE IS NO CHANGE TO USE, EGRESS, OCCUPANCY.
M01317709-I1
11/17/2025
Filed — Full Demolition
FULL DEMOLITION OF 7 STORY BUILDING USING MECH MEANS TO ASSIST
M01317708-I1
11/11/2025
Special inspection requirement — Structural Stability – Alterations of existing Buildings
11/11/2025
Special inspection requirement — Demolition
11/11/2025
Special inspection requirement — Final
Chris Sanders
08/11/2025
Permit issued — Sidewalk Shed
M00766755-I1-SH
05/19/2025
Signed off — Alteration
Decommission of T-Mobile telecom site on the roof. No change in use, egress of occupancy.
M01129134-I1
04/29/2025
Filed — Alteration
Decommission of T-Mobile telecom site on the roof. No change in use, egress of occupancy.
M01129134-P1
02/27/2025
Permit issued — Antenna
M01129134-I1-AN
02/18/2025
Filed — Alteration
Decommission of T-Mobile telecom site on the roof. No change in use, egress of occupancy.
M01129134-I1
01/03/2025
Cycle 9 facade report signed — UNSAFE
12/31/2024
Cycle 9 facade report submitted
12/02/2024
Cycle 9 facade inspection completed
10/30/2024
Permit issued — General Construction
M00766401-I1-GC
09/09/2024
Permit issued — Sidewalk Shed
M00766755-I1-SH
05/06/2024
Permit issued — Suspended Scaffold
M00991562-I1-SC
04/01/2024
Permit issued — Suspended Scaffold
M00991562-I1-SC
01/23/2024
Permit issued — Suspended Scaffold
M00991562-I1-SC
01/17/2024
Filed — Alteration
M00991562-I1
01/01/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/30/2023
Permit issued — General Construction
M00766401-I1-GC
10/27/2023
Permit issued — Supported Scaffold
M00792375-I1-SF
09/08/2023
Permit issued — Sidewalk Shed
M00766755-I1-SH
04/21/2023
Signed off — Alteration
M00523868-I1
04/21/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY 72' HIGH PIPE SCAFFOLD ORIGINATING (OFF GRADE) AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
M00523943-I1
02/10/2023
Cycle 9 facade report submitted
02/09/2023
Cycle 9 facade inspection completed
02/05/2023
Cycle 9 facade report signed — UNSAFE
11/14/2022
Signed off — Alteration
AT&T - Replacement of existing telecommunications antennas with installation/replacement of RRH units on roof. Relocation of existing antenna sectors and related appurtenances on roof. Removal and installation of cabinets with modifications to existing platform on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
M00077106-I1
09/06/2022
Permit issued — General Construction
M00766401-I1-GC
09/06/2022
Permit issued — Supported Scaffold
M00792375-I1-SF
09/06/2022
Permit issued — Sidewalk Shed
M00766755-I1-SH
08/17/2022
Objection raised — Structural
08/17/2022
Objection resolved — Addressed
08/17/2022
Objection raised — 2014-SFBC 3314.4.4.4-Construct
08/17/2022
Objection resolved — Addressed
08/16/2022
Filed — Alteration
Supported scaffold installation for planned facade repairs as per plans; no change in use,egress or occupancy.
M00792375-I1
07/21/2022
Permit issued — Antenna
M00077106-I1-AN
07/08/2022
Filed — Alteration
facade repair including face brick replacement, marble and terra cotta patching, brick and stone repointing as per plans filed. No change in use, egress or occupancy.
M00766401-I1
07/08/2022
Objection raised — Admin
Latest 60 of 161 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GFP REAL ESTATE2007/08/2026
T-MOBILE707/08/2026
MNK ENTERPRISES807/08/2026
KEYSTONE CONTRACTING703/22/2026
PINNER303/22/2026
HW W 34TH ST LLC103/22/2026
TO THE OWNER OF 249 WEST203/22/2026
PANN METRO ASSOCIATES LLC303/22/2026
PENN METRO ASSOCIATES2303/22/2026
NEWMARK CO REAL ESTATE103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/15/2025$6.6M—PENN METRO ASSOCIATES LLC → HW W 34TH ST LLC$451/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CSR EXPEDITERS103/21/2026
ARCHI PRO GROUP503/21/2026
CONSTRUCTION PERMIT SERVICES203/21/2026
RIZZO GROUP203/21/2026
GC1 EXPEDITING203/21/2026
CCM CONSULTING GROUP, INC.103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AVARGA CONSTRUCTION CORPGeneral Contractor1907/08/2026
KEYSTONE CONTRACTING CORPGeneral Contractor403/21/2026
MNK ENTERPRISES LLCGeneral Contractor407/08/2026
LEVEST ELECTRIC CORPGeneral Contractor307/08/2026
EJD WIRELESS INCGeneral Contractor303/21/2026
RAMAPO COMMUNICATION CORPGeneral Contractor303/21/2026
OVERLAND CONTRACTING INCGeneral Contractor207/08/2026
CELTIC SERVICES NYC INCGeneral Contractor207/08/2026
WATCH HILL WIRELESS SOLUGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GRANT ENGINEERING CONSULT3512204/29/2025
NY RESTORATION TECHNOLOGY6187108/16/2022
RAK DESIGN INC.7699107/08/2022
JEREMY K MCKEON, P.E.7263110/13/2021
ENTHINK ENGINEERS LLC6247105/21/2021
TECTONIC ENGINEERING CONS106110/29/2018
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedCENTRAL CONSTRUCTION MGMT09/01/2026
DOB NOWSidewalk ShedPermit IssuedAVARGA CONSTRUCTION CORP07/02/2026
DOB NOWSidewalk ShedPermit IssuedAVARGA CONSTRUCTION CORP04/01/2026
DOB NOWSuspended ScaffoldSigned-offAVARGA CONSTRUCTION CORP12/19/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedCELTIC SERVICES NYC INC12/10/2025
DOB NOWGeneral ConstructionSigned-offCELTIC SERVICES NYC INC11/25/2025
DOB NOWSidewalk ShedPermit IssuedAVARGA CONSTRUCTION CORP08/11/2025
DOB NOWAntennaSigned-offWATCH HILL WIRELESS SOLU02/27/2025
DOB NOWGeneral ConstructionPermit IssuedAVARGA CONSTRUCTION CORP10/30/2024
DOB NOWSidewalk ShedPermit IssuedAVARGA CONSTRUCTION CORP09/09/2024
DOB NOWSuspended ScaffoldSigned-offAVARGA CONSTRUCTION CORP05/06/2024
DOB NOWSuspended ScaffoldSigned-offAVARGA CONSTRUCTION CORP04/01/2024
DOB NOWSuspended ScaffoldSigned-offAVARGA CONSTRUCTION CORP01/23/2024
DOB NOWGeneral ConstructionPermit IssuedAVARGA CONSTRUCTION CORP10/30/2023
DOB NOWSupported ScaffoldPermit IssuedAVARGA CONSTRUCTION CORP10/27/2023
DOB NOWSidewalk ShedPermit IssuedAVARGA CONSTRUCTION CORP09/08/2023
DOB NOWGeneral ConstructionPermit IssuedAVARGA CONSTRUCTION CORP09/06/2022
DOB NOWSupported ScaffoldPermit IssuedAVARGA CONSTRUCTION CORP09/06/2022
DOB NOWSidewalk ShedPermit IssuedAVARGA CONSTRUCTION CORP09/06/2022
DOB NOWAntennaSigned-offLEVEST ELECTRIC CORP07/21/2022
DOB NOWGeneral ConstructionPermit IssuedKEYSTONE CONTRACTING CORP02/28/2022
DOB NOWAntennaPermit IssuedEJD WIRELESS INC02/28/2022
DOB NOWGeneral ConstructionPermit IssuedKEYSTONE CONTRACTING CORP05/22/2021
DOB NOWSupported ScaffoldSigned-offMNK ENTERPRISES LLC05/20/2021
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES LLC05/18/2021
DOB NOWAntennaSigned-offLEVEST ELECTRIC CORP04/29/2020
DOB NOWAntennaSigned-offRAMAPO COMMUNICATION CORP06/11/2019
DOB NOWAntennaSigned-offOVERLAND CONTRACTING INC01/24/2019
DOB NOWAntennaSigned-offOVERLAND CONTRACTING INC12/20/2018
BISOTISSUEDPARK PREMIUM ENTERPRISES03/29/2019
BISOTISSUEDPARK PREMIUM ENTERPRISES01/09/2019
BISOTISSUEDNY DEVELOPERS & MANAGEMENT06/15/2018
BISOTISSUEDJERRICK ASSOCIATES INC05/07/2018
BISOTISSUEDNY DEVELOPERS & MANAGEMENT02/01/2018
BISOTISSUEDBECHTEL INFRASTRUCTURE AN04/24/2017
BISEQISSUEDJERRICK ASSOCIATES INC01/31/2017
BISOTISSUEDBECHTEL INFRASTRUCTURE AN11/16/2016
BISEQISSUEDSPRING SCAFFOLDING LLC01/18/2013
BISOTISSUEDSUMMIT DEVELOPMENT CORP12/12/2012
BISEQISSUEDSPRING SCAFFOLDING LLC09/17/2012
+ 13 more permits on file
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
03/18/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
11/11/2025Structural Stability – Alterations of existing Buildings—special
11/11/2025Demolition—special
11/11/2025FinalChris Sandersprogress
06/28/2022MasonryCraig Jirakspecial
06/28/2022Energy Code Compliance InspectionsCraig Jirakprogress
06/28/2022Post-installed AnchorsCraig Jirakspecial
06/28/2022FinalCraig Jirakprogress
▾Documents — 266 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch18
09/03/2026M00523868-I1Request digital key ↗
09/03/2026M00523943-I1Request digital key ↗
09/03/2026M00525126-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Antenna1
08/15/2026M00124797-I1Request digital key ↗
▸Applications & Permits43
▸BISPLAN / WORK APPROVAL APPLICATION22
01/23/2019123379913Open ↗
06/27/2018123379913Open ↗
05/04/2018123454528Open ↗
Showing 3 of 22 on file for this type
▸BISWORK PERMIT APPLICATION18
03/29/2019123379913Open ↗
01/09/2019123028856Open ↗
06/15/2018123426248Open ↗
Showing 3 of 18 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications3
01/03/2019123174689Open ↗
01/03/2019123174689Open ↗
06/14/2013121376778Open ↗
▸Seals & Professional Certifications75
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION31
03/26/2019140598994Open ↗
01/10/2019123028856Open ↗
01/10/2019123028856Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/03/2026M00523868-I1Open ↗
09/03/2026M00523943-I1Open ↗
09/03/2026M00525126-I1Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
05/04/2018123454528Open ↗
02/24/2017123028856Open ↗
12/07/2012121516859Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
11/21/2012121516859Open ↗
09/17/2012121376778Open ↗
08/09/2011120770308Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
05/04/2018123454528Open ↗
02/24/2017123028856Open ↗
01/30/2017140598994Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/25/2026M01317709-I1Open ↗
08/23/2026M00766401-I1Open ↗
08/23/2026M00766401-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
01/30/2017140598994Open ↗
05/06/2014140194162Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
01/30/2017140598994Open ↗
05/06/2014140194162Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026M00766401-I1Open ↗
08/23/2026M00766401-I1Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
08/09/2011120770308Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
10/19/2016122467491Open ↗
▸Environmental & Asbestos21
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/03/2026M00525126-I1Open ↗
09/03/2026M00559257-I1Open ↗
09/02/2026M00766401-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
03/08/2019123379913Open ↗
01/23/2019123379913Open ↗
05/04/2018123454528Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
08/09/2011120770308Open ↗
06/02/2010120366629Open ↗
06/02/2010120366629Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
10/14/2009120177389Open ↗
Showing 1 of 2 on file for this type
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
01/10/2019123028856Open ↗
01/10/2019123028856Open ↗
05/04/2018123454528Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
01/10/2019123028856Open ↗
06/12/2018123454528Open ↗
06/02/2017122467491Open ↗
Showing 3 of 5 on file for this type
▸BISTR8: Energy Code Progress Inspections2
01/09/2012120770308Open ↗
08/09/2011120770308Open ↗
▸BISTECHNICAL REPORT: ENERGY1
08/09/2011120770308Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
01/30/2017140598994Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
01/30/2017140598994Open ↗
05/06/2014140194162Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
01/08/2019123426248Open ↗
▸Approvals, Objections & Sign-offs30
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
03/26/2019140598994Open ↗
01/10/2019123028856Open ↗
01/08/2019123426248Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
03/13/2019123379913Open ↗
05/09/2018123426248Open ↗
06/02/2017122467491Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
11/21/2012121516859Open ↗
09/17/2012121376778Open ↗
10/14/2009120177389Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTransit Authority Approval3
08/13/2026M01129134-P1Open ↗
08/13/2026M00559257-I1Open ↗
08/13/2026M01129134-I1Open ↗
▸BISSHED LETTER1
01/23/2013121376778Open ↗
▸BISTRANSIT AUTHORITY APPROVAL1
05/06/2014140194162Open ↗
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL1
01/30/2017140598994Open ↗
▸BISSUPERSEDING LETTER1
05/01/2017122467491Open ↗
▸Cost, Insurance & Ownership26
▸BISCOST AFFIDAVIT26
01/10/2019123028856Open ↗
01/10/2019123028856Open ↗
01/08/2019123426248Open ↗
Showing 3 of 26 on file for this type
▸Filing & Intake Forms25
▸BISEFILING COVER SHEET13
06/27/2018123379913Open ↗
05/04/2018123454528Open ↗
04/16/2018123426248Open ↗
Showing 3 of 13 on file for this type
▸BISBOROUGH INTAKE FORM6
03/26/2019140598994Open ↗
01/10/2019123028856Open ↗
01/10/2019123028856Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION4
03/13/2019123379913Open ↗
07/12/2018123426248Open ↗
03/28/2018123174689Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
01/30/2017140598994Open ↗
05/06/2014140194162Open ↗
▸Other Documents6
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
09/18/2012121376778Open ↗
▸DOB NOWIRA Certification1
08/18/2026M01446601-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M00991562-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/15/2026M01317708-I1Open ↗
▸DOB NOWStructure Photographs1
08/15/2026M01317708-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M00991562-I1Open ↗