← Back
BuildNYC
Two family frame
249 WOOD AVENUE
STATEN ISLAND · BIN 5089147
💬 Discuss this project
1915Year Built
2.5Stories
B2Building Class
R3XZoning
1,800 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Two family frame · 8,500 sf lot · 0.21 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 27p · 2 filings · 17 docs
Floor 1Curb cut installation9p · 3 filings · 19 docs
Cellar8p · 2 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Casa Bella Builders807/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ryan Design Architecture401/31/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RSF BuildingGeneral Contractor307/08/2026
Laser Lite Elect'lElectrical103/22/2026
R.S.F. Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ryan Design Architecture7159106/02/2021
Building Lifecycle
07/19/2022
Signed off — Alteration
S00510954-I1
07/19/2022
Signed off — Alteration
Install new plumbing fixtures in conjunction with ALT application S00510954
S00510948-I1
07/18/2022
Signed off — Alteration
S00574075-I1
07/15/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
07/15/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
33 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offRSF Building07/12/2022
DOB NOWPlumbingSigned-offR.S.F. Plumbing & Heating01/06/2022
DOB NOWGeneral ConstructionSigned-offRSF Building11/23/2021
1 project · most recent 02/08/2021
General Wiring
FiledStatusContractorScope
02/08/2021CompleteLaser Lite Elect'lGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/15/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
07/15/2022Pass-Final General Construction Non-Directive 14PassView ↗
04/11/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/07/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/07/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/02/2022Fail-Final PL - Up to 9 Requested FloorsFailView ↗
01/24/2022Fail-Final PL - Up to 9 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
02/25/2022Energy Code Compliance InspectionsDaniel Ryanprogress
02/25/2022Permanent certificateDaniel Ryanenergy_progress
02/25/2022HVAC-R and service water heating system controlsDaniel Ryanenergy_progress
02/25/2022HVAC-R and service water piping design and insulationDaniel Ryanenergy_progress
02/25/2022HVAC-R and service water heating equipmentDaniel Ryanenergy_progress
02/25/2022Maintenance informationDaniel Ryanenergy_progress
01/28/2022Energy Code Compliance InspectionsDaniel Ryanprogress
01/28/2022HVAC-R and service water heating equipmentDaniel Ryanenergy_progress
01/28/2022HVAC-R and service water heating system controlsDaniel Ryanenergy_progress
01/28/2022Maintenance informationDaniel Ryanenergy_progress
01/28/2022Permanent certificateDaniel Ryanenergy_progress
01/28/2022HVAC-R and service water piping design and insulationDaniel Ryanenergy_progress
19 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account