← Back
Elevator apt, fireproof with stores
British International School of NY
25-00 FDR DRIVE · Murray Hill-Kips Bay · BIN 1090181
💬 Discuss this project
1973Year Built
40Stories
D6Building Class
C2-7Zoning
1,797,891 sfGross Floor Area
1,122Units
LL97 CoveredRent Stabilized75 Open Violations 72 unresolved · 3 paperwork only ▸
Elevator apt, fireproof with stores · Owner of record: WATERSIDE PROPCO LLC · 230,066 sf lot · 7.81 FAR built
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WATERSIDE PLAZA3103/22/2026
WATERSIDE PLAZA GROUND LE403/22/2026
WATERSIDE DEVELOPMENT103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREEN DESIGN102/18/2021
COSENTINI ASSOCIATES102/16/2021
GABOR SZAKAL CONSULTING ENGINEERS104/28/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYCCODE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.D. WINSTON SERVICE INCGeneral Contractor403/21/2026
EVEREST SCAFFOLDING INCGeneral Contractor203/21/2026
PJM AND SONS, INCGeneral Contractor203/21/2026
GREGORY PAPANTONIOUElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOUTHPORT ENGINEERING ASS7514102/16/2021
FRANKLIN & OAK, INC.5758104/28/2020
Building Lifecycle
All (28)Filed (3)Permit Issued (4)Signed Off (2)Violation (5)Special Inspection (14)
11/13/2025
Violation issued (ECB, open)
Elevators
08/03/2021
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00471576-I1
03/22/2021
Permit issued — Mechanical Systems
M00448938-I1-MS
02/18/2021
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00471576-I1
02/18/2021
Permit issued — Sidewalk Shed
M00471576-I1-SH
02/17/2021
Special inspection requirement — Final
BRIAN T. O'CONNOR
02/16/2021
Filed — Alteration
Modification of existing mechanical system in the Waterside Plaza Swim and Health Club as shown on plans filed herewith. No change to use, egress occupancy.
M00448938-I1
01/22/2021
Special inspection requirement — Duct leakage testing, insulation and design
William Urban
01/22/2021
Special inspection requirement — HVAC-R and service water heating equipment
William Urban
01/15/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
William Urban
01/15/2021
Special inspection requirement — Ventilation and air distribution system
William Urban
01/06/2021
Special inspection requirement — Mechanical Systems
William Urban
01/06/2021
Special inspection requirement — Final
Douglas Mass
11/18/2020
Signed off — Alteration
Application is filed to replace an existing mechanical AC split system unit. Interior work only.
M00314069-I1
09/01/2020
Permit issued — Mechanical Systems
M00314069-I1-MS
05/12/2020
Permit issued — Mechanical Systems
M00314069-I1-MS
04/28/2020
Filed — Alteration
Application is filed to replace an existing mechanical AC split system unit. Interior work only.
M00314069-I1
03/02/2020
Special inspection requirement — HVAC and service water heating equipment
Michael Kokoszka
03/02/2020
Special inspection requirement — HVAC insulation and sealing
Michael Kokoszka
03/02/2020
Special inspection requirement — HVAC and service water heating system controls
Michael Kokoszka
03/02/2020
Special inspection requirement — Maintenance information
Michael Kokoszka
02/11/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Kokoszka
02/11/2020
Special inspection requirement — Final
Gabor Szakal
02/11/2020
Special inspection requirement — Mechanical Systems
Michael Kokoszka
08/22/2018
Violation issued (ECB, closed)
Construction
07/05/2018
Violation issued (ECB, closed)
Construction
06/29/2018
Violation issued (ECB, closed)
Construction
06/29/2018
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offPJM AND SONS, INC03/22/2021
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC02/18/2021
DOB NOWMechanical SystemsSigned-offAMNH09/01/2020
DOB NOWMechanical SystemsSigned-offAMNH05/12/2020
BISOTISSUEDJ&C RESTORATION CORP09/25/2014
BISEQISSUEDCONSOLIDATED SCAFFOLD & BRIDGE07/23/2013
BISEQISSUEDCONSOLIDATED SCAFFOLD & BRIDGE07/23/2013
BISEQISSUEDCONSOLIDATED SCAFFOLD & BRIDGE06/27/2012
BISEQISSUEDCONSOLIDATED SCAFFOLD & BRIDGE06/25/2012
BISEQISSUEDCONSOLIDATED SCAFFOLD & BRIDGE05/23/2012
BISEQISSUEDCONSOLIDATED SCAFFOLD & BRIDGE05/21/2012
BISOTISSUEDMGE DEVELOPMENT INC06/09/2011
BISOTISSUEDMGE DEVELOPMENT INC04/12/2010
BISPLISSUEDDUO PLUMBING & HTG CORP.07/15/2008
BIS—ISSUEDRETAIL CONSTRUCTION SVCS07/11/2008
BISEQISSUEDRETAIL CONSTRUCTION SVCS07/11/2008
BISOTISSUEDRETAIL PROJECT MANGEMENT06/20/2008
BISOTISSUEDDARREN CONSTRUCTION SERVICES01/18/2008
BIS—ISSUEDLAKE CONSTRUCTION & DEVEL CORP03/30/1992
1 project · most recent 02/16/2021
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
02/16/2021Signed-offPJM AND SONS, INCAir Conditioning Systems, Heating Systems
Cooling
Mitsubishi Electric PKFY-P30NKMUO-E2 30,000 BTU · Vrf Indoor ×4
PUMY-P36NKMU3 36,000 BTU · Vrf Outdoor ×4
PUMY-P60NKMU3 60,000 BTU · Vrf Outdoor ×4
PVFY-P54NAMU-E1 54,000 BTU · Vrf Indoor ×4
PEFY-AF1200CFMR-E 112,000 BTU · Vrf Indoor ×2
PURY-P120TNU-A 120,000 BTU · Vrf Outdoor ×2
PEFY-P96NMHSU-E 96,000 BTU · Vrf Indoor ×1
PUHY-P96TNU-A 96,000 BTU · Vrf Outdoor ×1
Heating
Trane UCCAA25B0DOED022 14,990 CFM ×1
2 projects · most recent 02/18/2021
FiledStatusContractorScope
02/18/2021CompleteBOROWIDE ELECT'L CONTR'S—
07/14/2020CompleteLAREDO ELECTRIC, INC.—
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
02/17/2021FinalBRIAN T. O'CONNORprogress
01/22/2021Duct leakage testing, insulation and designWilliam Urbanenergy_progress
01/22/2021HVAC-R and service water heating equipmentWilliam Urbanenergy_progress
01/15/2021HVAC-R and service water piping design and insulationWilliam Urbanenergy_progress
01/15/2021Ventilation and air distribution systemWilliam Urbanenergy_progress
01/06/2021Mechanical SystemsWilliam Urbanspecial
01/06/2021FinalDouglas Massprogress
03/02/2020HVAC and service water heating equipment Michael Kokoszkaenergy_progress
03/02/2020HVAC insulation and sealing Michael Kokoszkaenergy_progress
03/02/2020HVAC and service water heating system controls Michael Kokoszkaenergy_progress
03/02/2020Maintenance informationMichael Kokoszkaenergy_progress
02/11/2020Fire-Resistant Penetrations and JointsMichael Kokoszkaspecial
02/11/2020FinalGabor Szakalprogress
02/11/2020Mechanical SystemsMichael Kokoszkaspecial
▾Documents — 196 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00314069-I1Request digital key ↗
09/04/2026M00448938-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00471576-I1Request digital key ↗
▸Applications & Permits50
▸BISPLAN / WORK APPROVAL APPLICATION27
05/20/2014120061743Open ↗
05/15/2014120346063Open ↗
12/13/2013121862243Open ↗
Showing 3 of 27 on file for this type
▸BISWORK PERMIT APPLICATION14
09/29/2014121862243Open ↗
07/29/2013121722573Open ↗
07/29/2013121722564Open ↗
Showing 3 of 14 on file for this type
▸BISPLACE OF ASSEMBLY5
05/20/2014120061743Open ↗
05/15/2014120346063Open ↗
10/05/2011120061743Open ↗
Showing 3 of 5 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION3
10/21/2011120061743Open ↗
09/30/2011120346063Open ↗
08/20/2010120061743Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
08/25/2008110182347Open ↗
▸Seals & Professional Certifications62
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION33
05/11/2017121722573Open ↗
05/11/2017121722564Open ↗
02/05/2015121862243Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/01/2026M00448938-I1Open ↗
09/01/2026M00448938-I1Open ↗
09/01/2026M00448938-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
12/17/2013121862243Open ↗
07/29/2013121722573Open ↗
07/29/2013121722564Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
07/29/2013121722573Open ↗
07/29/2013121722564Open ↗
06/01/2012121084682Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026M00448938-I1Open ↗
08/28/2026M00314069-I1Open ↗
08/28/2026M00314069-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/04/2026M00448938-I1Open ↗
08/13/2026M00471576-I1Open ↗
08/13/2026M00314069-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/13/2013121862243Open ↗
▸Trade Schedules & Equipment12
▸BISSELF-CERT PLUMBING NOTICE5
02/27/2009110182347Open ↗
12/01/2008110182347Open ↗
10/21/2008110182347Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING4
12/17/2008110182347Open ↗
08/27/2008110182347Open ↗
08/04/2008110182347Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS3
03/30/2009110182347Open ↗
03/30/2009110182347Open ↗
03/30/2009110182347Open ↗
▸Environmental & Asbestos14
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'8
07/29/2010120426128Open ↗
06/11/2010120377190Open ↗
05/30/2008110182347Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
12/13/2013121862243Open ↗
09/24/2010120346063Open ↗
09/24/2010120346063Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/04/2026M00448938-I1Open ↗
08/13/2026M00314069-I1Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
12/13/2013121862243Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
09/04/2026M00448938-I1Open ↗
▸Approvals, Objections & Sign-offs24
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
05/11/2017121722573Open ↗
05/11/2017121722564Open ↗
02/05/2015121862243Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
06/01/2012121084682Open ↗
07/29/2010120426128Open ↗
07/28/2010120426128Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
09/26/2011110182347Open ↗
05/20/2011110182347Open ↗
05/30/2008110182347Open ↗
▸BISSHED LETTER1
06/27/2012121084682Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026M00471576-I1Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)1
08/13/2026M00314069-I1Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026M00314069-I1Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT12
02/05/2015121862243Open ↗
12/13/2013121862243Open ↗
02/01/2013120308951Open ↗
Showing 3 of 12 on file for this type
▸Filing & Intake Forms16
▸BISEFILING COVER SHEET10
12/13/2013121862243Open ↗
07/29/2013121722573Open ↗
07/29/2013121722564Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION6
07/09/2012121084691Open ↗
06/26/2012121084691Open ↗
10/21/2011120061743Open ↗
Showing 3 of 6 on file for this type
▸Other Documents1
▸BISPlot Diagram1
07/12/2008110182347Open ↗