← Back
BuildNYC
Hospital, sanitarium, mental institution
Mount Sinai Hospital - Mount Sinai Hospital of Queens
25-10 30TH AVENUE · BIN 4436864
💬 Discuss this project
1950Year Built
6Stories
I1Building Class
R6Zoning
217,951 sfGross Floor Area
1Units
LL97 Covered1 Active Violation 1 likely answered 12 old, status unconfirmed ▸FDNY Report ↗
Hospital, sanitarium, mental institution · Owner of record: Mount Sinai Hospital · 39,500 sf lot · 5.52 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofMount Sinai Health System45p · 7 filings · 17 docs
Floor 6Mount Sinai Health System49p · 7 filings · 17 docs
Floor 5Mount Sinai Health System27p · 5 filings · 18 docs
Floor 4Mount Sinai Health System25p · 3 filings · 17 docs
Floor 3Mount Sinai Health System25p · 3 filings · 17 docs
Floor 2Mount Sinai Health System53p · 7 filings · 18 docs
Floor 1Mount Sinai Health System28p · 6 filings · 18 docs
Site & exteriorMount Sinai Health System28p · 9 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Mount Sinai Hospital18610/09/2026
MT Sinai Health System1507/08/2026
MT Sinai Hospital Fac Management Engineering1403/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Gig Expediting603/21/2026
A1 Expediting Service403/21/2026
Outsource Consultants1103/21/2026
Louis Striar203/21/2026
Environmental Engineering Solutions103/21/2026
Consolidated Scaffold Bridge203/21/2026
Direct Access Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Nelson Air DeviceGeneral Contractor1407/08/2026
Andamio ScaffoldingScaffold1207/08/2026
King Hoist & ScaffoldingScaffold807/08/2026
Amf Mechanical Systems Cospecialty_contractor603/21/2026
Safway AtlanticScaffold603/21/2026
CNY ConstructionGeneral Contractor507/08/2026
Everest ScaffoldingScaffold403/21/2026
Tom Fitzpatrick ElectricalElectrical403/21/2026
New Age Electrical ContractingElectrical303/22/2026
Par Plumbing CoPlumbing207/08/2026
Absolute Fire Barrier SE*General Contractor207/08/2026
Alliance PlumbingPlumbing207/01/2026
Pace PlumbingFire Protection207/08/2026
Consolidated ScaffoldingScaffold107/08/2026
New Age Electrical ContractingElectrical103/21/2026
Albin Gustafson CompanyElectrical103/21/2026
E-J Electric Installation CoElectrical103/22/2026
Active SignsSign hanger107/08/2026
Blake Electric Contracting Co., IElectrical103/21/2026
Ashlar MechanicalFire Protection107/08/2026
Olympic Torch ContractingGeneral Contractor109/15/2026
Commercial Cooling Servi*General Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Outsource Special Inspection2827509/08/2026
Alan Margolin & Associates423404/07/2025
Obaid Mian849106/15/2021
Atlantic Engineeringlabor1381705/11/2021
Building Lifecycle
All (210)Filed (33)Permit Issued (46)Signed Off (18)Violation (60)Inspection (3)Objection (20)Special Inspection (30)
10/09/2026
Signed off — Alteration
MOUNT SINAI - ELEVATOR PIT REPAIR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01455163-I1
09/14/2026
Permit issued — Structural
Q01455163-I1-ST
09/08/2026
Filed — Alteration
MOUNT SINAI - ELEVATOR PIT REPAIR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01455163-I1
09/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JONAR MADRIAGA
09/02/2026
Special inspection requirement — Concrete - Cast-In-Place
JONAR MADRIAGA
09/02/2026
Special inspection requirement — Final
JONAR MADRIAGA
08/03/2026
Signed off — Alteration
Mount Sinai Medical Center - STRUCTURAL MODIFICATIONS RELATED TO THE HVAC MODERNIZATIOM AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00754011-I1
06/29/2026
Permit issued — Plumbing
Q00753779-I1-PL
04/30/2026
Permit issued — Structural
Q00754011-I1-ST
04/30/2026
Permit issued — Mechanical Systems
Q00753622-I1-MS
04/17/2026
Permit issued — Structural
Q01357792-I1-ST
04/15/2026
Violation issued (FDNY_NOV, closed)
03/18/2026
Filed — Alteration
Install of a new metal maintenance/service access stair as per plans. Not intended for occupant egress and will not serve as required means of exit. Its purpose is to provide limited access for building personnel and contractors.
Q01357792-I1
02/10/2026
Special inspection requirement — Post-installed Anchors
JONAR MADRIAGA
02/10/2026
Special inspection requirement — Structural Steel - High Strength Bolting
JONAR MADRIAGA
02/10/2026
Special inspection requirement — Structural Steel - Welding
JONAR MADRIAGA
02/10/2026
Special inspection requirement — Structural Steel - Details
JONAR MADRIAGA
02/10/2026
Special inspection requirement — Final
JONAR MADRIAGA
02/10/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JONAR MADRIAGA
12/15/2025
Violation issued (FDNY_NOV, closed)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/14/2025
Permit issued — Mechanical Systems
Q00753622-I1-MS
05/14/2025
Permit issued — Structural
Q00754011-I1-ST
04/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
04/24/2025
Special inspection requirement — Shutoff dampers
Young Suh
04/24/2025
Special inspection requirement — Maintenance information
Young Suh
04/24/2025
Special inspection requirement — Final
Young Suh
04/24/2025
Special inspection requirement — Duct leakage testing, insulation and design
Young Suh
04/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
Young Suh
04/24/2025
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
04/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Young Suh
04/24/2025
Special inspection requirement — Mechanical Systems
Young Suh
04/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
Young Suh
04/09/2025
Violation issued (FDNY_NOV, closed)
04/09/2025
Violation issued (FDNY_NOV, closed)
04/09/2025
Violation issued (FDNY_NOV, closed)
04/07/2025
Filed — Alteration
Mount Sinai Medical Center - HVAC Modernization Project - MECHANICAL MODIFICATIONS AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Q00753622-P1
02/11/2025
Violation issued (FDNY_NOV, closed)
02/11/2025
Violation issued (FDNY_ORDER, closed)
02/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/31/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/23/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/10/2025
Permit issued — Plumbing
Q00753779-I1-PL
01/07/2025
Violation issued (FDNY_ORDER, closed)
12/20/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Young Suh
12/20/2024
Special inspection requirement — HVAC-R and service water heating system controls
Young Suh
12/20/2024
Special inspection requirement — Final
Young Suh
12/20/2024
Special inspection requirement — Mechanical Systems
Young Suh
12/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
12/20/2024
Special inspection requirement — Shutoff dampers
Young Suh
12/20/2024
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
12/20/2024
Special inspection requirement — HVAC-R and service water heating equipment
Young Suh
12/20/2024
Special inspection requirement — Duct leakage testing, insulation and design
Young Suh
12/20/2024
Special inspection requirement — Maintenance information
Young Suh
11/01/2024
Violation issued (FDNY_NOV, closed)
10/21/2024
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q00893597-I1
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 210 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offOlympic Torch Contracting09/14/2026
DOB NOWPlumbingSigned-offAlliance Plumbing06/29/2026
DOB NOWStructuralSigned-offNelson Air Device04/30/2026
DOB NOWMechanical SystemsSigned-offNelson Air Device04/30/2026
DOB NOWStructuralPermit IssuedAbsolute Fire Barrier SE*04/17/2026
DOB NOWMechanical SystemsSigned-offNelson Air Device05/14/2025
DOB NOWStructuralSigned-offNelson Air Device05/14/2025
DOB NOWPlumbingSigned-offCardoza Plumbing Wmbe01/10/2025
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding06/18/2024
DOB NOWMechanical SystemsSigned-offNelson Air Device06/13/2024
DOB NOWStructuralSigned-offNelson Air Device06/13/2024
DOB NOWSidewalk ShedPermit IssuedKing Hoist & Scaffolding02/14/2024
DOB NOWStructuralSigned-offAmf Mechanical Systems Co01/03/2024
DOB NOWSupported ScaffoldPermit IssuedSafway Atlantic09/27/2023
DOB NOWSupported ScaffoldPermit IssuedSafway Atlantic06/30/2023
DOB NOWMechanical SystemsPermit IssuedAmf Mechanical Systems Co06/28/2023
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding06/22/2023
DOB NOWStructuralSigned-offNelson Air Device05/01/2023
DOB NOWMechanical SystemsSigned-offNelson Air Device05/01/2023
DOB NOWMechanical SystemsSigned-offNelson Air Device02/06/2023
DOB NOWStructuralSigned-offNelson Air Device12/29/2022
DOB NOWSidewalk ShedPermit IssuedKing Hoist & Scaffolding11/21/2022
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding11/15/2022
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding11/15/2022
DOB NOWGeneral ConstructionSigned-offAbsolute Fire Barrier SE*08/18/2022
DOB NOWStructuralSigned-offNelson Air Device07/28/2022
DOB NOWSupported ScaffoldPermit IssuedSafway Atlantic07/15/2022
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding09/17/2021
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding09/16/2021
DOB NOWMechanical SystemsSigned-offCommercial Cooling Servi*06/23/2021
DOB NOWSupported ScaffoldSigned-offEverest Scaffolding04/25/2021
DOB NOWSidewalk ShedSigned-offEverest Scaffolding04/24/2021
DOB NOWMechanical SystemsSigned-offCNY Construction11/04/2020
DOB NOWSprinklersSigned-offManengeering Bureau10/29/2020
DOB NOWPlumbingSigned-offPar Plumbing Co10/28/2020
DOB NOWSprinklersSigned-offManengeering Bureau10/26/2020
DOB NOWMechanical SystemsSigned-offCNY Construction02/28/2020
DOB NOWPlumbingSigned-offPar Plumbing Co01/29/2020
DOB NOWMechanical SystemsSigned-offCNY Construction01/21/2020
DOB NOWSprinklersSigned-offAshlar Mechanical01/03/2020
+ 56 more permits on file
3 projects · most recent 04/07/2025
Heating and Air Conditioning Systems Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/07/2025Signed-offNelson Air DeviceAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Venmar ULTRALINE A-2-20e-WW-SC-ACCU0726-X-P 20,000 CFM · Ahu ×5
ULTRALINE A-2-20e-WW-SC-DX-X-P 20,000 CFM · Ahu ×5
Heating
Neptronic DF CF00HB 2 kW · Electric Heater ×25
Reznor UDX-30 456 BTU · Unit Heater
Ventilation
Twin City Fan BCV-150 2,830 CFM · Exhaust Fan ×5
07/29/2024——Heating and Air Conditioning Systems
Heat / Cool
Daikin RXTQ48TAVJU 49,500 CFM · Vrf Outdoor ×1
02/22/2023Permit IssuedAmf Mechanical Systems CoHeating and Air Conditioning Systems
Heat / Cool
Trane ×2
1 project · most recent 07/29/2024
FiledStatusContractorScope
07/29/2024———
1 project · most recent 07/29/2024
Water/Sanitary
FiledStatusContractorScope
07/29/2024——Water/Sanitary
21 projects · most recent 04/02/2026
General Wiring
FiledStatusContractorScope
04/02/2026Permit IssuedNew Age Electrical Contracting—
02/03/2026Permit IssuedTF ElectricalGeneral Wiring
06/19/2023Permit IssuedNew Age Electrical ContractingGeneral Wiring
03/21/2023CompleteE-J Electric Installation CoGeneral Wiring
02/23/2022Permit IssuedNew Age Electrical Contracting1 meters
04/27/2021CancelledBorowide Elect'l Contractors—
11/24/2020CompleteNew Age Electrical Contracting—
11/24/2020CompleteNew Age Electrical ContractingGeneral Wiring
06/01/2020Permit IssuedNew Age Electrical ContractingGeneral Wiring
05/18/2020CompleteNew Age Electrical Contracting—
05/11/2020CompleteNew Age Electrical ContractingGeneral Wiring
04/03/2020CompleteNew Age Electrical Contracting—
03/19/2020CompleteNew Age Electrical Contracting—
11/19/2019CompleteNJS Electrical ServicesGeneral Wiring
07/03/2019CompleteNew Age Electrical Contracting—
4 projects · most recent 09/08/2026
Steel Concrete
FiledStatusContractorScope
09/08/2026Signed-offOlympic Torch ContractingConcrete
03/18/2026Permit IssuedAbsolute Fire Barrier SE*Steel
07/29/2024——1 scope_items
07/18/2022Signed-offNelson Air DeviceSteel
1 project · most recent 07/13/2023
Scaffold
FiledStatusContractorScope
07/13/2023Permit IssuedSafway AtlanticScaffold
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/31/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/23/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 81
DateRequirementInspectorRole
09/02/2026Structural Stability – Alterations of existing buildingsJONAR MADRIAGAspecial
09/02/2026FinalJONAR MADRIAGAprogress
09/02/2026Concrete - Cast-In-PlaceJONAR MADRIAGAspecial
02/10/2026Structural Stability – Alterations of existing buildingsJONAR MADRIAGAspecial
02/10/2026Structural Steel - DetailsJONAR MADRIAGAspecial
02/10/2026Post-installed AnchorsJONAR MADRIAGAspecial
02/10/2026Structural Steel - High Strength BoltingJONAR MADRIAGAspecial
02/10/2026Structural Steel - WeldingJONAR MADRIAGAspecial
02/10/2026FinalJONAR MADRIAGAprogress
04/24/2025HVAC-R and service water piping design and insulationYoung Suhenergy_progress
04/24/2025HVAC-R and service water heating equipmentYoung Suhenergy_progress
04/24/2025Duct leakage testing, insulation and designYoung Suhenergy_progress
04/24/2025Maintenance informationYoung Suhenergy_progress
04/24/2025Mechanical SystemsYoung Suhspecial
04/24/2025Fire-Resistant Penetrations and JointsYoung Suhspecial
04/24/2025Energy Code Compliance InspectionsYoung Suhprogress
04/24/2025FinalYoung Suhprogress
04/24/2025Shutoff dampersYoung Suhenergy_progress
04/24/2025HVAC-R and service water heating system controlsYoung Suhenergy_progress
12/20/2024HVAC-R and service water piping design and insulationYoung Suhenergy_progress
12/20/2024HVAC-R and service water heating equipmentYoung Suhenergy_progress
12/20/2024Shutoff dampersYoung Suhenergy_progress
12/20/2024Maintenance informationYoung Suhenergy_progress
12/20/2024Duct leakage testing, insulation and designYoung Suhenergy_progress
12/20/2024Fire-Resistant Penetrations and JointsYoung Suhspecial
Latest 25 of 81.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Mount Sinai Health SystemMedical / HealthcareEntire building
Project Q01455163 Alteration · LOC Issued · 09/08/2026
Project Q01357792 Alteration · Permit Entire · 03/18/2026
Project Q01078450 Alteration · Approved · 07/29/2024
Project Q00893597 Alteration · LOC Issued · 06/21/2023
Project Q00815229 Alteration · Permit Entire · 02/22/2023
Project Q00815311 Alteration · Permit Entire · 02/07/2023
Project Q08043153 Alteration · Permit Entire · 11/21/2022
Project Q00774868 Alteration · LOC Issued · 07/27/2022
Project Q00754011 Alteration · LOC Issued · 07/18/2022
Project Q00775250 Alteration · Permit Entire · 07/15/2022
Project Q00753779 Alteration · Permit Entire · 07/13/2022
Project Q00753622 Alteration · Permit Entire · 07/12/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,049 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch22
08/29/2026Q00008850-I1Request digital key ↗
08/29/2026Q00008867-P1Request digital key ↗
08/29/2026Q00008867-I1Request digital key ↗
Showing 3 of 22 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
08/27/2026Q00277185-I1Request digital key ↗
08/15/2026Q00277185-P1Request digital key ↗
08/14/2026Q00245053-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler3
08/28/2026Q00277428-I1Request digital key ↗
08/28/2026Q00311395-I1Request digital key ↗
08/15/2026Q00245111-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
08/28/2026Q00277228-I1Request digital key ↗
08/15/2026Q00245104-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/28/2026Q00227261-I1Request digital key ↗
▸Applications & Permits205
▸BISPLAN / WORK APPROVAL APPLICATION103
08/07/2025421962692Open ↗
07/11/2025421753935Open ↗
04/20/2021421962692Open ↗
Showing 3 of 103 on file for this type
▸BISWORK PERMIT APPLICATION102
04/07/2023421962692Open ↗
03/19/2020421753935Open ↗
12/20/2019421950703Open ↗
Showing 3 of 102 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications250
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION121
05/26/2020421892571Open ↗
05/26/2020421892571Open ↗
05/13/2020421962692Open ↗
Showing 3 of 121 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature32
08/29/2026Q00008850-I1Open ↗
08/29/2026Q00008867-I1Open ↗
08/29/2026Q00008867-P1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWProgress Inspector Seal & Signature29
09/30/2026Q00227261-I1Open ↗
08/29/2026Q00774868-I1Open ↗
08/28/2026Q00753622-I1Open ↗
Showing 3 of 29 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST24
04/20/2021421962692Open ↗
04/14/2021421962692Open ↗
05/13/2020421962692Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/19/2026Q00245104-I1Open ↗
08/30/2026Q00245111-I1Open ↗
08/30/2026Q00245111-I1Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT14
05/13/2020421962692Open ↗
02/20/2020421753935Open ↗
Showing 2 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment65
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE21
03/27/2020421950703Open ↗
01/02/2020421892571Open ↗
12/27/2019421892571Open ↗
Showing 3 of 21 on file for this type
▸BISEQUIPMENT USE PERMITS20
10/19/2020421950703Open ↗
Showing 1 of 20 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT8
08/25/2020421950703Open ↗
Showing 1 of 8 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA4
09/22/2020421892562Open ↗
Showing 1 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING4
07/24/2020421950703Open ↗
06/30/2020421950703Open ↗
Showing 2 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Safety & Tenant Protection7
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM4
07/26/2019421950703Open ↗
Showing 1 of 4 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
08/28/2018421639454Open ↗
Showing 1 of 2 on file for this type
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos46
▸BISASBESTOS: CERTIFICATION (DEP ACP5)19
06/12/2019421892571Open ↗
05/20/2019421950703Open ↗
05/20/2019421892562Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/27/2026Q00518468-I1Open ↗
08/26/2026Q00753779-I1Open ↗
08/24/2026Q00815311-P1Open ↗
Showing 3 of 13 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: VARIANCE (DEP FORM V5)1
04/07/2023421962692Open ↗
▸BIS0NE (1) ACP-21 IS REQUIRED PRIOR TO SIGNOFF FOR DEP APPLICATION #TRU1284QN22.1
08/06/2025421962692Open ↗
▸Energy Compliance80
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS43
05/13/2020421962692Open ↗
03/19/2020421753935Open ↗
02/20/2020421753935Open ↗
Showing 3 of 43 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS10
08/25/2020421950703Open ↗
06/17/2019421639454Open ↗
06/13/2019421619966Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
11/23/2022421753935Open ↗
04/20/2021421962692Open ↗
04/14/2021421962692Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTR8: Energy Code Progress Inspections4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
06/09/2025421962692Open ↗
11/23/2022421753935Open ↗
11/05/2020421916626Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
06/09/2025421962692Open ↗
10/31/2022421753935Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00518468-I1Open ↗
08/20/2026Q00753622-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISINTERIOR LIGHTING POWER1
11/23/2022421753935Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/20/2026Q00753622-I1Open ↗
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: RESPONSIBILITY9
04/20/2021421962692Open ↗
04/14/2021421962692Open ↗
11/05/2020421916626Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
10/31/2022421753935Open ↗
▸Approvals, Objections & Sign-offs137
▸BISLETTERS - SUPPORTING DOCUMENTATION38
05/13/2020421962692Open ↗
02/20/2020421753935Open ↗
11/08/2019421916626Open ↗
Showing 3 of 38 on file for this type
▸BISADMINISTRATIVE OBJECTIONS32
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 32 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST32
10/24/2025421962692Open ↗
06/14/2024421753935Open ↗
01/22/2021420862640Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter31
08/29/2026Q00008850-I1Open ↗
08/29/2026Q00008867-I1Open ↗
08/29/2026Q00008867-P1Open ↗
Showing 3 of 31 on file for this type
▸BISFINAL2
06/09/2025421962692Open ↗
10/31/2022421753935Open ↗
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTAP LETTER - DOM SVC : DEP-DOM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership86
▸BISCOST AFFIDAVIT81
11/27/2020421892562Open ↗
06/17/2020421892571Open ↗
05/13/2020421962692Open ↗
Showing 3 of 81 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
07/16/2025421962692Open ↗
05/09/2024421753935Open ↗
01/22/2021420862640Open ↗
Showing 3 of 4 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms93
▸BISEFILING COVER SHEET64
05/13/2020421962692Open ↗
02/20/2020421753935Open ↗
11/08/2019421916626Open ↗
Showing 3 of 64 on file for this type
▸BISADDITIONAL INFORMATION19
04/20/2021421962692Open ↗
08/04/2020421950703Open ↗
08/04/2020421950703Open ↗
Showing 3 of 19 on file for this type
▸BISBOROUGH INTAKE FORM8
05/26/2020421892571Open ↗
Showing 1 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
04/10/2020440591691Open ↗
Showing 1 of 2 on file for this type
▸Other Documents25
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION14
07/23/2020421950703Open ↗
Showing 1 of 14 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION4
12/18/2019421892571Open ↗
12/18/2019421950703Open ↗
12/18/2019421892562Open ↗
Showing 3 of 4 on file for this type
▸BISSupporting Document: Fee Exempt3
04/20/2021421962692Open ↗
07/23/2020421950703Open ↗
04/10/2020440591691Open ↗
▸DOB NOWPro Cert Restriction Exception (LL158/17)3
08/13/2026Q01078450-S1Open ↗
08/13/2026Q01078450-S2Open ↗
08/13/2026Q01078450-I1Open ↗
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type