← Back
Condo, residential unit in 1-3 story building
Skyline Terrace Condominium
25 120 STREET · BIN 4449420
💬 Discuss this project
1984Year Built
3Stories
R3Building Class
R4Zoning
77,708 sfGross Floor Area
78Units
LL97 CoveredRent Stabilized67 Open Violations 66 unresolved · 1 paperwork only ▸FDNY Report ↗
Condo, residential unit in 1-3 story building · 116,750 sf lot · 0.67 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SKYLINE TERRACE CONDOMINIUM203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.110/11/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AGEE HEATING SERVICE CORPPlumbing107/08/2026
Building Lifecycle
All (19)Filed (1)Permit Issued (1)Signed Off (1)Violation (11)Special Inspection (5)
06/12/2025
Violation issued (HPD, closed)
A
04/16/2024
Violation issued (HPD, closed)
A
11/24/2023
Violation issued (HPD, closed)
I
03/30/2023
Violation issued (HPD, closed)
A
11/15/2022
Violation issued (HPD, closed)
I
03/08/2022
Violation issued (HPD, closed)
I
03/08/2022
Violation issued (HPD, closed)
A
04/16/2021
Violation issued (HPD, closed)
A
04/16/2021
Violation issued (HPD, closed)
I
01/10/2020
Signed off — Alteration
TEST/REPAIR/REPLACE GAS PIPING DUE TO UTILITY SHUTDOWN. REGISTER BOILER, HOT WATER HEATER, GAS DRYER AND STOVE.
Q00236055-I1
11/04/2019
Violation issued (HPD, closed)
I
10/12/2019
Permit issued — Plumbing
Q00236055-I1-PL
10/11/2019
Filed — Alteration
TEST/REPAIR/REPLACE GAS PIPING DUE TO UTILITY SHUTDOWN. REGISTER BOILER, HOT WATER HEATER, GAS DRYER AND STOVE.
Q00236055-I1
10/11/2019
Special inspection requirement — HVAC and service water heating equipment
LOUIS ARENA
10/11/2019
Special inspection requirement — Maintenance information
LOUIS ARENA
10/11/2019
Special inspection requirement — HVAC and service water heating system controls
LOUIS ARENA
10/11/2019
Special inspection requirement — HVAC insulation and sealing
LOUIS ARENA
09/30/2019
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
10/25/2018
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAGEE HEATING SERVICE CORP10/12/2019
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
10/11/2019HVAC and service water heating equipment LOUIS ARENAenergy_progress
10/11/2019Maintenance informationLOUIS ARENAenergy_progress
10/11/2019HVAC and service water heating system controls LOUIS ARENAenergy_progress
10/11/2019HVAC insulation and sealing LOUIS ARENAenergy_progress
09/30/2019Energy Code Compliance InspectionsLOUIS ARENAprogress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch - Plumbing1
08/28/2026Q00236055-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature5
08/30/2026Q00236055-I1Open ↗
08/30/2026Q00236055-I1Open ↗
08/30/2026Q00236055-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/28/2026Q00236055-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/28/2026Q00236055-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/28/2026Q00236055-I1Open ↗