Elevator apt, fireproof without stores
25-13 23 STREET
QUEENS · Astoria (Central) · BIN 4019090
💬 Discuss this project
2022Year Built
3Stories
D3Building Class
R6BZoning
8,700 sfGross Floor Area
11Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: 25-13 LIC LLC · 4,375 sf lot · 1.99 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire Protection
Roof19p · 2 filings · 19 docs
Bulkhead1p · 1 filing · 2 docs
Floor 319p · 3 filings · 20 docs
Floor 219p · 3 filings · 20 docs
Floor 117p · 2 filings · 19 docs
Cellar6p · 3 filings · 20 docs
Sub-Basement16p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
25-13 LIC6507/08/2026
CLASSIC CONSULTING GROUP907/08/2026
G5 CONCRETE403/22/2026
TSONTOS CONSTRUCTION403/22/2026
GRUPPO 5 SUBPARTNERS903/22/2026
N/A TSONTOS CONSTRUCTION203/22/2026
WCD SERVICES203/22/2026
ELMAC ELECTRIC INC.103/22/2026
GRUPPO 5 SUBCONTRACTORS I103/22/2026
25-13 LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/28/2020$1.8M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOTTOLA RINI ENGINEERS510/29/2024
ARQUITECTURA VARELA209/08/2022
STRUCTURAL ENGINEERING TECHNOLOGIES605/12/2022
TERRAFORM ARCHITECTURE PLLC201/03/2022
GREEN DESIGN103/31/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JETER EXPEDITOR803/21/2026
PINE NY503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GRUPPO 5 SUBPARTNERS INCGeneral Contractor1607/08/2026
CLASSIC CONSULTING GROUPGeneral Contractor807/08/2026
TSONTOS CONSTRUCTION LLCGeneral Contractor603/21/2026
G5 CONCRETE, LLCGeneral Contractor507/08/2026
ELMAC ELECTRIC INC.Electrical203/22/2026
FLINT MECHANICAL CORPPlumbing207/08/2026
WCD SERVICES CORPGeneral Contractor107/08/2026
JOSEPHINE THE PLUMBER LLCPlumbing107/08/2026
FLINT MECHANICAL CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CENTURY TESTING & CONSULT40811110/29/2024
Building Lifecycle
All (179)Filed (16)Permit Issued (22)Signed Off (8)Violation (53)Inspection (5)Objection (42)Special Inspection (30)Tax Incentive (3)
08/15/2028
421-a(16) construction completed
07/20/2026
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AND ROOF PROTECTION FOR NEW BUILDING AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014
Q00496353-I1
05/11/2026
Violation issued (HPD, open)
A
04/27/2026
Signed off — Alteration
Q08000913-I1
04/27/2026
Signed off — Alteration
Q00753200-I1
11/21/2025
Violation issued (HPD, closed)
I
09/23/2025
Signed off — Alteration
PROPOSED MECHANICAL PLANS FILED HEREWITH IN CONJUNCTION WITH NB APPLICATION 421780905
Q00307036-I1
06/26/2025
Signed off — Alteration
PROPOSED PLUMBING WORK FILED HEREWITH IN CONJUNCTION WITH NEW BUILDING APPLICATION 421780905
Q00306920-I1
06/11/2025
Violation issued (HPD, closed)
A
06/02/2025
Permit issued — Mechanical Systems
Q00307036-I1-MS
03/21/2025
Signed off — Alteration
PROPOSED SPRINKLER PLANS FILED HEREWITH IN CONJUNCTION WITH NB 421780905
Q00338362-I1
03/19/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY CONSTRUCTION FENCE
Q00472696-I1
11/29/2024
Violation issued (HPD, closed)
I
11/04/2024
Special inspection requirement — HVAC and service water heating system controls
FRANZ SEBORGA
11/04/2024
Special inspection requirement — Maintenance information
FRANZ SEBORGA
11/04/2024
Special inspection requirement — HVAC and service water heating equipment
FRANZ SEBORGA
11/04/2024
Special inspection requirement — Mechanical Systems
FRANZ SEBORGA
11/04/2024
Special inspection requirement — Final
FRANZ SEBORGA
11/04/2024
Special inspection requirement — Energy Code Compliance Inspections
FRANZ SEBORGA
11/04/2024
Special inspection requirement — HVAC insulation and sealing
FRANZ SEBORGA
10/29/2024
Filed — Alteration
PROPOSED MECHANICAL PLANS FILED HEREWITH IN CONJUNCTION WITH NB APPLICATION 421780905
Q00307036-P1
09/04/2024
421-a(16) registration filed
08/14/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/12/2024
Violation issued (ECB, closed)
Construction
04/30/2024
Special inspection requirement — Energy Code Compliance Inspections
ALDO BRAVO
04/30/2024
Special inspection requirement — Mechanical Systems
ALDO BRAVO
04/30/2024
Special inspection requirement — HVAC and service water heating equipment
ALDO BRAVO
04/30/2024
Special inspection requirement — Maintenance information
ALDO BRAVO
04/30/2024
Special inspection requirement — HVAC and service water heating system controls
ALDO BRAVO
04/30/2024
Special inspection requirement — HVAC insulation and sealing
ALDO BRAVO
04/30/2024
Special inspection requirement — Final
Anthony Rini, III
04/12/2024
Violation issued (HPD, closed)
A
04/04/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FRANZ SEBORGA
04/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FRANZ SEBORGA
04/01/2024
Objection resolved — Addressed
01/17/2024
Objection raised — Other
01/05/2024
Filed — Alteration
PROPOSED PLUMBING WORK FILED HEREWITH IN CONJUNCTION WITH NEW BUILDING APPLICATION 421780905
Q00306920-P1
12/29/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
ALDO BRAVO
12/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALDO BRAVO
11/28/2023
Permit issued — Plumbing
Q17103501-I1-PL
11/27/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/22/2023
Violation issued (HPD, closed)
I
03/27/2023
Violation issued (HPD, closed)
A
03/03/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/01/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
03/01/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/23/2023
Permit issued — Sprinklers
Q00338362-I1-EW-SP
01/18/2023
Signed off — Alteration
proposed SOE plans filed herewith in conjunction with NB 421780905
Q00523723-I1
11/15/2022
Violation issued (HPD, closed)
I
09/12/2022
Permit issued — Supported Scaffold
Q08000913-I1-SF
09/08/2022
Filed — Alteration
Q08000913-I1
09/07/2022
Permit issued — Sidewalk Shed
Q00753200-I1-SH
08/09/2022
Permit issued — Plumbing
Q17103501-I1-PL
08/05/2022
Violation issued (ECB, closed)
Construction
07/16/2022
Permit issued — Sidewalk Shed
Q00753200-I1-SH
07/14/2022
Violation issued (ECB, closed)
Unknown
07/14/2022
Violation issued (ECB, closed)
Construction
07/08/2022
Violation issued (ECB, closed)
Construction
07/08/2022
Violation issued (ECB, closed)
Construction
06/30/2022
Violation issued (ECB, closed)
Construction
Latest 60 of 179 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offTSONTOS CONSTRUCTION LLC06/02/2025
DOB NOWPlumbingSigned-offFLINT MECHANICAL CORP11/28/2023
DOB NOWSprinklersSigned-offBLETSAS P&H CORP01/23/2023
DOB NOWSupported ScaffoldSigned-offCLASSIC CONSULTING GROUP09/12/2022
DOB NOWSidewalk ShedSigned-offCLASSIC CONSULTING GROUP09/07/2022
DOB NOWPlumbingSigned-offFLINT MECHANICAL CORP08/09/2022
DOB NOWSidewalk ShedSigned-offCLASSIC CONSULTING GROUP07/16/2022
DOB NOWSidewalk ShedSigned-offCLASSIC CONSULTING GROUP06/08/2022
DOB NOWStructuralPermit IssuedTSONTOS CONSTRUCTION LLC05/17/2022
DOB NOWConstruction FenceSigned-offTSONTOS CONSTRUCTION LLC05/17/2022
DOB NOWStructuralPermit IssuedGRUPPO 5 SUBPARTNERS INC04/27/2022
DOB NOWSupport of ExcavationSigned-offG5 CONCRETE, LLC11/29/2021
DOB NOWConstruction FenceSigned-offG5 CONCRETE, LLC11/10/2021
DOB NOWFoundationPermit IssuedG5 CONCRETE, LLC11/10/2021
DOB NOWPlumbingSigned-offJOSEPHINE THE PLUMBER LLC11/09/2021
DOB NOWFoundationPermit IssuedGRUPPO 5 SUBPARTNERS INC10/18/2021
DOB NOWConstruction FenceSigned-offGRUPPO 5 SUBPARTNERS INC10/18/2021
DOB NOWSupport of ExcavationSigned-offGRUPPO 5 SUBPARTNERS INC10/18/2021
DOB NOWFoundationPermit IssuedGRUPPO 5 SUBPARTNERS INC08/05/2021
DOB NOWSupport of ExcavationSigned-offGRUPPO 5 SUBPARTNERS INC08/05/2021
DOB NOWSidewalk ShedSigned-offCLASSIC CONSULTING GROUP04/01/2021
DOB NOWConstruction FenceSigned-offWCD SERVICES CORP03/18/2021
BIS—ISSUEDRAGHUBAR CONSTRUCTION INC07/29/2025
BIS—ISSUEDTSONTOS CONSTRUCTION LLC01/18/2023
BIS—ISSUEDTSONTOS CONSTRUCTION LLC05/19/2022
BIS—ISSUEDGRUPPO 5 SUBPARTNERS INC08/13/2021
BIS—ISSUEDWCD SERVICES CORP03/24/2021
6 projects · most recent 07/23/2024
General Wiring
FiledStatusContractorScope
07/23/2024CompleteELMAC ELECTRIC INC.General Wiring
11/01/2022CompleteSTAR ELEC'L CONTRACTORS C—
07/12/2022CompleteELMAC ELECTRIC INC.General Wiring
04/04/2022Permit IssuedSTAR ELEC'L CONTRACTORS C—
04/15/2021CompleteRICHARD NEU—
04/03/2021Permit IssuedRICHARD NEU—
2 projects · most recent 12/20/2021
Concrete
FiledStatusContractorScope
12/20/2021Permit IssuedTSONTOS CONSTRUCTION LLCConcrete
05/20/2021Permit IssuedG5 CONCRETE, LLC1 scope_items
1 project · most recent 03/31/2021
Sidewalk Shed
FiledStatusContractorScope
03/31/2021Signed-offCLASSIC CONSULTING GROUPSidewalk Shed
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
11/27/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/03/2023Pass-Final CND-Occupancy InspectionPassView ↗
03/01/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/01/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/30/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
11/04/2024HVAC and service water heating system controls FRANZ SEBORGAenergy_progress
11/04/2024Maintenance informationFRANZ SEBORGAenergy_progress
11/04/2024HVAC and service water heating equipment FRANZ SEBORGAenergy_progress
11/04/2024Mechanical SystemsFRANZ SEBORGAspecial
11/04/2024FinalFRANZ SEBORGAprogress
11/04/2024Energy Code Compliance InspectionsFRANZ SEBORGAprogress
11/04/2024HVAC insulation and sealing FRANZ SEBORGAenergy_progress
04/30/2024Energy Code Compliance InspectionsALDO BRAVOprogress
04/30/2024Mechanical SystemsALDO BRAVOspecial
04/30/2024HVAC and service water heating equipment ALDO BRAVOenergy_progress
04/30/2024Maintenance informationALDO BRAVOenergy_progress
04/30/2024HVAC and service water heating system controls ALDO BRAVOenergy_progress
04/30/2024HVAC insulation and sealing ALDO BRAVOenergy_progress
04/30/2024FinalAnthony Rini, IIIprogress
04/04/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFRANZ SEBORGAspecial
04/04/2024Fire-Resistant Penetrations and JointsFRANZ SEBORGAspecial
12/29/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationALDO BRAVOspecial
12/29/2023Fire-Resistant Penetrations and JointsALDO BRAVOspecial
05/19/2022Structural Steel - WeldingALDO BRAVOspecial
05/19/2022Deep Foundation ElementsALDO BRAVOspecial
05/19/2022Subgrade InspectionsALDO BRAVOspecial
05/19/2022Excavations - Sheeting, Shoring, and BracingALDO BRAVOspecial
05/19/2022Concrete - Cast-In-PlaceALDO BRAVOspecial
05/19/2022UnderpinningALDO BRAVOspecial
05/19/2022Subsurface Conditions – Fill Placement & In-Place DensityALDO BRAVOspecial
Latest 25 of 50.
▾Documents — 214 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch7
08/27/2026Q00496353-I1Request digital key ↗
08/27/2026Q00523723-I1Request digital key ↗
08/27/2026Q00523723-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Structural2
08/15/2026Q00354859-I1Request digital key ↗
08/15/2026Q00354859-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
08/14/2026Q00306920-P1Request digital key ↗
08/14/2026Q00306920-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/28/2026Q00307036-P1Request digital key ↗
08/14/2026Q00307036-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence2
08/26/2026Q00472696-P1Request digital key ↗
08/26/2026Q00472696-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
08/15/2026Q00338362-I1Request digital key ↗
▸Applications & Permits23
▸BISPLAN / WORK APPROVAL APPLICATION14
08/05/2025421780905Open ↗
07/03/2025440652429Open ↗
07/03/2025440652045Open ↗
Showing 3 of 14 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
08/12/2021421780905Open ↗
06/16/2020421780905Open ↗
05/21/2020421780905Open ↗
▸BISWORK PERMIT APPLICATION3
06/30/2022421780905Open ↗
09/29/2021421780905Open ↗
06/03/2021421787800Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
05/01/2024421780558Open ↗
11/08/2023421780558Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
12/06/2024421780558Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISZONING RESOLUTION DETERMINATION2
05/21/2020421780905Open ↗
12/27/2019421780905Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
06/06/2024421780905Open ↗
▸BISZONING DIAGRAM1
11/12/2020421780905Open ↗
▸Seals & Professional Certifications64
▸DOB NOWSpecial Inspector Seal & Signature33
09/28/2026Q00307036-P1Open ↗
09/23/2026Q00523723-I1Open ↗
09/23/2026Q00523723-I1Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/28/2026Q00307036-I1Open ↗
08/28/2026Q00338362-I1Open ↗
08/27/2026Q00523723-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/28/2026Q00307036-P1Open ↗
09/28/2026Q00307036-P1Open ↗
09/28/2026Q00307036-P1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
09/29/2021421780905Open ↗
12/27/2019421780905Open ↗
12/27/2019421780905Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/28/2021440652045Open ↗
▸Trade Schedules & Equipment6
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
02/01/2024421780905Open ↗
▸BISELECTRIC CUT-OFF1
06/10/2021421787800Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
05/14/2025421780905Open ↗
▸BISSEWER CUT-OFF1
06/10/2021421787800Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
02/01/2024421780905Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
03/03/2025421780905Open ↗
▸Safety & Tenant Protection7
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
08/12/2021421780905Open ↗
06/10/2021421787800Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
09/29/2021421780905Open ↗
08/12/2021421780905Open ↗
▸BISSTREET TREE SIGNOFF2
11/19/2024421780558Open ↗
06/06/2024421780905Open ↗
▸BISSTREET TREE CHECKLIST1
12/27/2019421780905Open ↗
▸Environmental & Asbestos1
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
06/10/2021421787800Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
06/09/2023421780905Open ↗
08/11/2021421780905Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
09/29/2021421780905Open ↗
12/27/2019421780905Open ↗
▸BISINTERIOR LIGHTING POWER1
02/01/2024421780905Open ↗
▸BIS* DUCT LEAKAGE TESTING1
02/01/2024421780905Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
02/01/2024421780905Open ↗
▸BISFENESTRATION AREAS1
02/01/2024421780905Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
01/31/2024421780905Open ↗
▸BISLIGHTING IN DWELLING UNITS1
02/01/2024421780905Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
08/01/2025421780905Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/01/2025421780905Open ↗
▸BISLIGHTING CONTROLS1
02/01/2024421780905Open ↗
▸BIS* HVAC INSULATION AND SEALING1
02/01/2024421780905Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY5
08/01/2025421780905Open ↗
06/28/2023421780905Open ↗
06/28/2023421780905Open ↗
Showing 3 of 5 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF2
06/06/2024421780905Open ↗
08/12/2021421780905Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
08/12/2021421780905Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
08/01/2025421780905Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
08/01/2025421780905Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
08/01/2025421780905Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
08/01/2025421780905Open ↗
▸BISSOIL REPORT1
01/28/2021440652045Open ↗
▸Approvals, Objections & Sign-offs10
▸BISLETTERS - SUPPORTING DOCUMENTATION6
06/30/2022421780905Open ↗
12/23/2021421780905Open ↗
06/10/2021421787800Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
08/05/2025421780905Open ↗
11/02/2020421780905Open ↗
12/27/2019421780905Open ↗
▸BISLANDMARKS APPROVAL1
06/10/2021421787800Open ↗
▸Cost, Insurance & Ownership9
▸BISPROJECT-SPECIFIC GL INSURANCE6
01/12/2026421780905Open ↗
06/30/2022421780905Open ↗
12/23/2021421780905Open ↗
Showing 3 of 6 on file for this type
▸BISCOST AFFIDAVIT1
01/28/2021440652045Open ↗
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
12/06/2024421780558Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
08/12/2021421780905Open ↗
▸Filing & Intake Forms18
▸BISADDITIONAL INFORMATION10
11/20/2024421780905Open ↗
11/30/2022421780905Open ↗
08/10/2022421780905Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING COVER SHEET4
04/01/2021421787800Open ↗
06/18/2020421961639Open ↗
12/27/2019421780558Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM3
06/10/2021421787800Open ↗
01/07/2021421961639Open ↗
06/18/2020421961639Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
12/27/2019421780558Open ↗
▸Other Documents10
▸BISBPP - SUPPORTING DOCUMENTATION2
12/06/2024421780558Open ↗
12/06/2024421780558Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
09/11/2025421780905Open ↗
▸BISLOWEST FLOOR ELEVATION1
08/01/2025421780905Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
12/06/2024421780558Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
08/01/2025421780905Open ↗
▸BISMAINTENANCE INFORMATION1
02/01/2024421780905Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
12/06/2024421780558Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
01/31/2024421780905Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00523723-I1Open ↗