← Back
Predominantly retail with other uses
25-17 41 AVENUE
QUEENS · Queensbridge-Ravenswood-Dutch Kills · BIN 4004896
💬 Discuss this project
1901Year Built
3Stories
K4Building Class
M1-2/R6AZoning
4,550 sfGross Floor Area
4Units
9 Open Violations 8 unresolved · 1 paperwork only ▸
Predominantly retail with other uses · Owner of record: MAMM REALTY INC · 2,523 sf lot · 1.8 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralFire ProtectionEquipmentGeneral
Permit Issued — active, not yet Signed-off
Floor 31 filing · 4 docs
Floor 21 filing · 4 docs
Floor 1Under Construction12p · 1 filing · 20 docs
Site & exterior4p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MAMM REALTY1307/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHOK ARCHITECTURE DESIGN, PL/211/23/2025
PVE ENGINEERING111/09/2023
PAUL PERDEK, PROF. ENG. PLLC108/11/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION203/21/2026
NORTHEAST EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J.V.S. CONTRACTING GROUPGeneral Contractor203/21/2026
GO PRO FIRE PROTECTION CFire Protection107/08/2026
AUTOMOTIVE FACILITY SVCSGeneral Contractor104/09/2026
POWERS BRIDGING & SCAFFOLDINGGeneral Contractor107/08/2026
CAM ENERGY HTG&MECH CORPPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASHOK ARCHITECTURE DESIGN6027211/23/2025
ASE ENGINEERING PLLC5785111/09/2023
Building Lifecycle
All (37)Filed (4)Permit Issued (5)Signed Off (2)Violation (11)Special Inspection (15)
06/05/2026
Permit issued — Sprinklers
Q01322059-S1-PL
04/22/2026
Permit issued — Sprinklers
Q01322059-S1-EW-SP
02/25/2026
Permit issued — General Construction
Q01322059-I1-GC
11/23/2025
Filed — Alteration
ALT FILING - GENERAL CONSTRUCTION FOR HEAVY MOTOR VEHICLE REPAIR AND MAINTENANCE SHOP, PAINT SPRAY BOOTH AND ACCESSORY OFFICE.
Q01322059-S1
11/23/2025
Filed — Alteration
ALT FILING - GENERAL CONSTRUCTION FOR HEAVY MOTOR VEHICLE REPAIR AND MAINTENANCE SHOP, PAINT SPRAY BOOTH AND ACCESSORY OFFICE.
Q01322059-I1
11/21/2025
Special inspection requirement — Tenant Protection Plan Compliance
Ashish Patel
11/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ashish Patel
11/20/2025
Special inspection requirement — Post-installed Anchors
Ashish Patel
11/20/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Ashish Patel
11/20/2025
Special inspection requirement — Tenant Protection Plan Compliance
Ashish Patel
11/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ashish Patel
11/20/2025
Special inspection requirement — Post-installed Anchors
Ashish Patel
11/20/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ashish Patel
11/20/2025
Special inspection requirement — Final
Ashish Patel
11/20/2025
Special inspection requirement — Energy Code Compliance Inspections
Ashish Patel
11/20/2025
Special inspection requirement — Fire-Resistance Rated Construction
Ashish Patel
11/20/2025
Special inspection requirement — Interior lighting power
Ashish Patel
11/20/2025
Special inspection requirement — Metering
Ashish Patel
11/20/2025
Special inspection requirement — Sprinkler Systems
Ashish Patel
11/20/2025
Special inspection requirement — Lighting controls
Ashish Patel
08/05/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00914837-I1
06/27/2024
Signed off — Alteration
Q00926382-I1
12/21/2023
Permit issued — Structural
Q00926382-I1-GC-CX
11/09/2023
Filed — Alteration
Q00926382-I1
08/11/2023
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00914837-I1
08/11/2023
Permit issued — Sidewalk Shed
Q00914837-I1-SH
10/01/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2007
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/12/2003
Violation issued (HPD, open)
B
06/12/2003
Violation issued (HPD, open)
B
06/12/2003
Violation issued (HPD, open)
B
06/12/2003
Violation issued (HPD, open)
B
06/12/2003
Violation issued (HPD, open)
B
03/30/2001
Violation issued (ECB, open)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedCAM ENERGY HTG&MECH CORP06/05/2026
DOB NOWSprinklersPermit IssuedGO PRO FIRE PROTECTION C04/22/2026
DOB NOWGeneral ConstructionPermit IssuedAUTOMOTIVE FACILITY SVCS02/25/2026
DOB NOWStructuralSigned-offJ.V.S. CONTRACTING GROUP12/21/2023
DOB NOWSidewalk ShedSigned-offPOWERS BRIDGING & SCAFFOL08/11/2023
BISOTISSUEDPERKAN CONCRETE CORP09/12/2008
BISPLISSUEDSATELLITE PLUMBING CORP04/25/2002
BIS—ISSUEDTRICO FUEL CORPORATION11/16/1990
1 project · most recent 11/23/2025
FiledStatusContractorScope
11/23/2025Permit IssuedGO PRO FIRE PROTECTION C6 heads
1 project · most recent 11/23/2025
Gas
FiledStatusContractorScope
11/23/2025Permit IssuedCAM ENERGY HTG&MECH CORPGas
2 projects · most recent 07/30/2026
General Wiring
FiledStatusContractorScope
07/30/2026CompleteATLAS PRIME ELECTRIC LLCGeneral Wiring
08/09/2023Permit IssuedOPTIMAL ELECTRIC, INC—
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
11/21/2025Tenant Protection Plan ComplianceAshish Patelspecial
11/20/2025Fire-Resistant Penetrations and JointsAshish Patelspecial
11/20/2025Post-installed AnchorsAshish Patelspecial
11/20/2025HVAC-R and service water piping design and insulationAshish Patelenergy_progress
11/20/2025Tenant Protection Plan ComplianceAshish Patelspecial
11/20/2025Fire-Resistant Penetrations and JointsAshish Patelspecial
11/20/2025Post-installed AnchorsAshish Patelspecial
11/20/2025Structural Stability – Alterations of existing buildingsAshish Patelspecial
11/20/2025FinalAshish Patelprogress
11/20/2025Energy Code Compliance InspectionsAshish Patelprogress
11/20/2025Fire-Resistance Rated ConstructionAshish Patelprogress
11/20/2025Interior lighting powerAshish Patelenergy_progress
11/20/2025MeteringAshish Patelenergy_progress
11/20/2025Sprinkler SystemsAshish Patelspecial
11/20/2025Lighting controlsAshish Patelenergy_progress
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/24/2026Q00914837-I1Request digital key ↗
08/23/2026Q00926382-I1Request digital key ↗
08/18/2026Q01322059-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits2
▸BISWORK PERMIT APPLICATION1
09/12/2008410162229Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
09/09/2008410162229Open ↗
▸Seals & Professional Certifications23
▸DOB NOWSpecial Inspector Seal & Signature8
08/28/2026Q01322059-I1Open ↗
08/28/2026Q01322059-I1Open ↗
08/28/2026Q01322059-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/28/2026Q01322059-I1Open ↗
08/28/2026Q01322059-I1Open ↗
08/28/2026Q01322059-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/24/2026Q00914837-I1Open ↗
08/23/2026Q00926382-I1Open ↗
08/18/2026Q01322059-S1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
09/23/2008410162229Open ↗
09/15/2008410162229Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/09/2008410162229Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
09/09/2008410162229Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/23/2026Q00926382-I1Open ↗
08/18/2026Q01322059-S1Open ↗
08/18/2026Q01322059-I1Open ↗
▸DOB NOWOER: Notice to Proceed3
08/18/2026Q01322059-S1Open ↗
08/13/2026Q01322059-I1Open ↗
08/13/2026Q01322059-S1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
09/09/2008410162229Open ↗
▸DOB NOWOER: Notice of Satisfaction1
08/13/2026Q00926382-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/23/2008410162229Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
09/09/2008410162229Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
09/25/2008410162229Open ↗
09/09/2008410162229Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
09/09/2008410162229Open ↗