← Back
BuildNYC
One story - permanent living quarter
25-18 HEALY AVENUE
QUEENS · BIN 4300461
💬 Discuss this project
1950Year Built
1Stories
A2Building Class
R1-2Zoning
1,552 sfGross Floor Area
1Units
One story - permanent living quarter · 21,000 sf lot · 0.07 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
AtticResidential building energy code compliance inspections1 filing · 3 docs
Floor 2Residential building energy code compliance inspections1 filing · 3 docs
Floor 1Residential building energy code compliance inspections1 filing · 3 docs
CellarResidential building energy code compliance inspections1 filing · 3 docs
Filed — no permit issued20p · 2 filings · 11 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Shmuel D. Flaum, Architect310/31/2022
Building Lifecycle
01/11/2023
Special inspection requirement — Ventilation and air distribution system
Shmuel Flaum
11/04/2022
Objection raised — Scope
11/02/2022
Objection raised — Inspections
11/02/2022
Objection raised — Scope
10/31/2022
Filed — Alteration
Q08030863-I1
45 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 06/01/2022
Heating and Air Conditioning Systems
FiledStatusContractorScope
06/01/2022——Heating and Air Conditioning Systems
1 project · most recent 06/01/2022
FiledStatusContractorScope
06/01/2022———
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
01/11/2023Ventilation and air distribution systemShmuel Flaumenergy_progress
10/31/2022Structural Cold-Formed Steel—special
10/31/2022Fire-Resistant Penetrations and Joints—special
10/31/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
10/31/2022Energy Code Compliance Inspections—progress
05/02/2022Structural Stability – Alterations of existing buildings—special
05/02/2022Subgrade Inspections—special
05/02/2022Final—progress
05/02/2022Footing and Foundation—progress
05/02/2022Energy Code Compliance Inspections—progress
05/02/2022Fire-Resistance Rated Construction—progress
05/02/2022Preliminary—progress
05/02/2022Structural Wood Frame—progress
05/02/2022Electric vehicle service equipment requirements—energy_progress
05/02/2022Fenestration areas—energy_progress
05/02/2022Mechanical Systems—special
05/02/2022Exterior lighting power—energy_progress
05/02/2022HVAC-R and service water heating equipment—energy_progress
05/02/2022Air barrier — testing —energy_progress
05/02/2022Interior lighting power—energy_progress
05/02/2022Fenestration air leakage—energy_progress
05/02/2022HVAC-R and service water heating system controls—energy_progress
05/02/2022Fenestration and door U-factor and product ratings—energy_progress
05/02/2022Air barrier - visual inspection—energy_progress
05/02/2022Maintenance information—energy_progress
Latest 25 of 35.
16 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account