← Back
BuildNYC
School or academy
Lexington School for the Deaf
25-26 75TH STREET · Jackson Heights · BIN 4437060
💬 Discuss this project
1966Year Built
3Stories
W3Building Class
R4Zoning
173,824 sfGross Floor Area
1Units
LL97 CoveredRent Stabilized27 Active Violations 24 unresolved · 3 paperwork only 1 old, status unconfirmed ▸FDNY Report ↗
School or academy · 271,400 sf lot · 0.64 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 3Lexington School for the Deaf11p · 4 filings · 17 docs
Floor 2Lexington School for the Deaf11p · 4 filings · 17 docs
Floor 1Lexington School for the Deaf9p · 3 filings · 17 docs
CellarLexington School for the Deaf9p · 3 filings · 17 docs
BasementLexington School for the Deaf4p · 1 filing · 9 docs
Site & exteriorLexington School for the DeafUnder Construction13p · 4 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Lexington School for the Deaf4510/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ashraf103/25/2026
KZ Engineering108/07/2025
NYMS Consulting310/31/2023
Env Architects209/25/2023
Cameron Engineering306/26/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Synergy Building Consultants103/21/2026
Rcga Architects1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Maric Mechanicalspecialty_contractor308/25/2026
Synergy ConstructionGeneral Contractor207/08/2026
Arsenal ScaffoldScaffold204/09/2026
Maric MechanicalScaffold210/09/2026
Miller Plumbing & HeatingPlumbing107/08/2026
Miller Plumbing & HeatingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NYMS Consulting8442210/31/2023
HRF Services5616509/25/2023
Building Lifecycle
All (105)Filed (10)Permit Issued (11)Signed Off (4)Violation (60)Inspection (4)Special Inspection (16)
10/07/2026
Permit issued — Construction Fence
Q00922101-I1-FN
08/24/2026
Permit issued — Mechanical Systems
Q00922105-S1-MS
05/06/2026
Violation issued (HPD, open)
A
03/26/2026
Permit issued — Supported Scaffold
Q01376084-I1-SF
03/25/2026
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01264810-I1
03/25/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01376084-I1
03/18/2026
Violation issued (FDNY_ORDER, closed)
03/18/2026
Violation issued (FDNY_ORDER, closed)
11/21/2025
Violation issued (HPD, open)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/08/2025
Permit issued — Supported Scaffold
Q01264810-I1-SF
08/07/2025
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01264810-I1
06/11/2025
Violation issued (HPD, open)
A
12/02/2024
Violation issued (HPD, open)
I
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/26/2024
Violation issued (FDNY_NOV, closed)
04/15/2024
Violation issued (HPD, open)
A
11/24/2023
Violation issued (HPD, open)
I
11/14/2023
Signed off — Alteration
Install new exhaust fan and associated ductwork to serve the new bathrooms filed separately . A Separate application filed to install new bathroom from basement to third floor.
Q00888596-I1
11/09/2023
Signed off — Alteration
Q00881776-I1
11/09/2023
Signed off — Alteration
Installation of Plumbing Fixtures for the ADA bathroom. A Separate application for the Construction filed separately.
Q00888593-I1
10/31/2023
Filed — Alteration
Q00922105-S1
10/31/2023
Permit issued — Mechanical Systems
Q00922105-S1-MS
10/30/2023
Special inspection requirement — Chimneys and vents
SULIMAN AHMED
10/30/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
SULIMAN AHMED
10/30/2023
Special inspection requirement — Post-installed Anchors
SULIMAN AHMED
10/02/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/25/2023
Filed — Alteration
Q00881776-P1
09/25/2023
Special inspection requirement — Tenant Protection Plan Compliance
FAHAD FATEH
09/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/25/2023
Special inspection requirement — Final
FAHAD FATEH
09/18/2023
Permit issued — Boiler Equipment
Q00922105-I1-BE
09/18/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/14/2023
Filed — Alteration
Q00922105-I1
09/14/2023
Permit issued — Construction Fence
Q00922101-I1-FN
09/13/2023
Filed — Alteration
LEXINGTON SCHOOL FOR THE DEAF: INSTALLATION OF +/- 181 LINEAR FEET TEMPORARY POST-INSTALLED CHAIN LINK FENCE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00922101-I1
08/31/2023
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
08/20/2023
Special inspection requirement — Final
SULIMAN AHMED
08/20/2023
Special inspection requirement — Mechanical Systems
SULIMAN AHMED
08/09/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/18/2023
Permit issued — Sprinklers
Q00888594-I1-EW-SP
07/18/2023
Permit issued — Plumbing
Q00888593-I1-PL
07/13/2023
Permit issued — Mechanical Systems
Q00888596-I1-MS
06/28/2023
Permit issued — General Construction
Q00881776-I1-GC
06/26/2023
Filed — Alteration
Install new exhaust fan and associated ductwork to serve the new bathrooms filed separately . A Separate application filed to install new bathroom from basement to third floor.
Q00888596-I1
06/26/2023
Filed — Alteration
Installation of Plumbing Fixtures for the ADA bathroom. A Separate application for the Construction filed separately.
Q00888593-I1
06/26/2023
Filed — Alteration
Modification and Installation Sprinkler Heads
Q00888594-I1
06/23/2023
Filed — Alteration
Q00881776-I1
06/23/2023
Special inspection requirement — Tenant Protection Plan Compliance
FAHAD FATEH
06/23/2023
Special inspection requirement — Tenant Protection Plan Compliance
FAHAD FATEH
06/23/2023
Special inspection requirement — Tenant Protection Plan Compliance
FAHAD FATEH
06/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/22/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
06/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/11/2023
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
06/11/2023
Special inspection requirement — Final
FAHAD FATEH
Latest 60 of 105 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedMaric Mechanical10/07/2026
DOB NOWMechanical SystemsPermit IssuedMaric Mechanical08/24/2026
DOB NOWSupported ScaffoldPermit IssuedArsenal Scaffold03/26/2026
DOB NOWSupported ScaffoldSigned-offArsenal Scaffold08/08/2025
DOB NOWMechanical SystemsPermit IssuedMaric Mechanical10/31/2023
DOB NOWBoiler EquipmentSigned-offChampion Combustion09/18/2023
DOB NOWConstruction FencePermit IssuedMaric Mechanical09/14/2023
DOB NOWSprinklersPermit IssuedMiller Plumbing & Heating07/18/2023
DOB NOWPlumbingSigned-offMiller Plumbing & Heating07/18/2023
DOB NOWMechanical SystemsSigned-offSynergy Construction07/13/2023
DOB NOWGeneral ConstructionSigned-offSynergy Construction06/28/2023
BISOTISSUEDTJM Construction03/06/2007
BISPLISSUEDGotham Plumbing & Sprinkler05/12/2006
BISCCISSUEDGalvin Bro03/29/2006
BISOTISSUEDGalvin Brothers03/16/2006
BISOTRE-ISSUEDGalvin Brothers03/16/2006
BISOTRE-ISSUEDGalvin Brothers03/16/2006
BISMHISSUEDTJM Construction03/09/2006
BISOTISSUEDMarangos Construction04/03/2004
BISOTISSUEDMarangos Construction04/03/2004
BISMHISSUEDTWS Contracting03/27/2004
BISOTISSUEDMarangos Construction03/19/2004
BISPLISSUEDAce Contracting08/19/2003
BISPLISSUEDAce Cotnracting06/13/2003
BISBLISSUEDJack Piccini06/04/2003
BISMHISSUEDTWS Contracting05/09/2003
BISFPISSUEDJem Fire Prevention05/01/2003
BISPLISSUEDAce Contracting09/10/2002
BISOTISSUEDMarangos Construction06/17/2002
BISOTISSUEDMarangos Construction06/17/2002
BISSPISSUEDDevo Fire Protection12/20/2001
BISPLISSUEDDevo Fire Protection09/07/2001
BISMHISSUEDCapital Elite Construction07/20/2001
BISPLISSUEDGeorge Breslaw & Sons08/21/1991
BISOTISSUEDBellet Construction Co08/07/1991
1 project · most recent 06/26/2023
FiledStatusContractorScope
06/26/2023Permit IssuedMiller Plumbing & Heating—
1 project · most recent 09/12/2023
FiledStatusContractorScope
09/12/2023Permit IssuedSBNY Electrical—
2 projects · most recent 03/25/2026
Scaffold Fence
FiledStatusContractorScope
03/25/2026Permit IssuedArsenal ScaffoldScaffold
09/13/2023Permit IssuedMaric MechanicalFence
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/02/2023Pass-Final Boiler Equipment InspectionPassView ↗
09/18/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/31/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
08/09/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
10/30/2023Chimneys and ventsSULIMAN AHMEDspecial
10/30/2023HVAC-R and service water piping design and insulationSULIMAN AHMEDenergy_progress
10/30/2023Post-installed AnchorsSULIMAN AHMEDspecial
09/25/2023Tenant Protection Plan ComplianceFAHAD FATEHspecial
09/25/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/25/2023FinalFAHAD FATEHprogress
08/20/2023FinalSULIMAN AHMEDprogress
08/20/2023Mechanical SystemsSULIMAN AHMEDspecial
06/23/2023Tenant Protection Plan ComplianceFAHAD FATEHspecial
06/23/2023Tenant Protection Plan ComplianceFAHAD FATEHspecial
06/23/2023Tenant Protection Plan ComplianceFAHAD FATEHspecial
06/22/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
06/22/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/11/2023Sprinkler SystemsFAHAD FATEHspecial
06/11/2023FinalFAHAD FATEHprogress
06/11/2023Mechanical SystemsFAHAD FATEHspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Lexington School for the DeafEducationEntire building
Project Q01376084 Alteration · Permit Entire · 03/25/2026
Project Q01264810 Alteration · LOC Issued · 08/07/2025
Project Q00922105 Alteration · Permit Entire · 09/14/2023
Project Q00922101 Alteration · Permit Entire · 09/13/2023
Project Q00888593 Alteration · LOC Issued · 06/26/2023
Project Q00888594 Alteration · Permit Entire · 06/26/2023
Project Q00888596 Alteration · LOC Issued · 06/26/2023
Project Q00881776 Alteration · LOC Issued · 06/23/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 50 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/24/2026Q00881776-P1Request digital key ↗
08/24/2026Q00881776-I1Request digital key ↗
08/24/2026Q00888593-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits1
▸BISPLACE OF ASSEMBLY1
05/23/2016401365205Open ↗
▸Seals & Professional Certifications23
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/24/2026Q00881776-I1Open ↗
08/24/2026Q00881776-P1Open ↗
08/24/2026Q00888593-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/25/2026Q00888593-I1Open ↗
09/14/2026Q00888594-I1Open ↗
08/31/2026Q00881776-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/25/2026Q00888593-I1Open ↗
08/31/2026Q00881776-I1Open ↗
08/26/2026Q00888596-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/24/2026Q00881776-P1Open ↗
08/24/2026Q00881776-I1Open ↗
08/24/2026Q00888593-I1Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs10
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
08/24/2026Q00881776-P1Open ↗
08/24/2026Q00881776-I1Open ↗
08/23/2026Q00922105-S1Open ↗
Showing 3 of 10 on file for this type