← Back
Elevator apt, semi-fireproof without stores
25-28 30 DRIVE
QUEENS · BIN 4007091
💬 Discuss this project
2021Year Built
—Stories
D1Building Class
R6AZoning
15,296 sfGross Floor Area
18Units
Rent Stabilized1 Open Violation ▸
Elevator apt, semi-fireproof without stores · Owner of record: PNASH REALTY LLC · 3,650 sf lot · 4.19 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Roof2p · 2 filings · 5 docs
Bulkhead2p · 1 filing · 2 docs
Floor 74p · 2 filings · 20 docs
Floor 6
Floor 51p · 1 filing · 20 docs
Floor 4
Floor 3
Floor 23p · 2 filings · 20 docs
Floor 12p · 2 filings · 20 docs
Cellar5p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
L GROUP2107/08/2026
DISANO CONSTRUCTION CO., INC.1403/22/2026
PLATINUM SERVICES NY1103/22/2026
PNASH REALTY803/22/2026
SHOWCASE DESIGN CORP803/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SIDERIS KEFALAS ENGINEERS PC304/04/2022
TOHFAZ UDDIN PE PC209/23/2021
ASHRAF CORP102/25/2021
WEXLER ASSOCIATES107/30/2020
GERALD CALIENDO ARCHITECTS107/08/2020
JOEL PHAGOO P.E. PLLC110/17/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE203/21/2026
EXPEDITE DEM203/21/2026
KD DESIGNS203/21/2026
GERALD J. CALIENDO R.A., P.C.103/21/2026
GREEN STUDIO203/21/2026
GERALD J CALIENDO R A P C103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SHOWCASE DESIGNS CORPGeneral Contractor1907/08/2026
SCIALLI & SONS INCPlumbing1907/08/2026
FULL CAPACITY FIREPlumbing903/22/2026
PLATINUM SERVICES NY LLCGeneral Contractor603/21/2026
REPUBLIC SCAFFOLD&HOIST CGeneral Contractor107/08/2026
FULL CAPACITY FIRE CORPFire Protection107/08/2026
NASH ELECTRIC SERVICES INElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
INTERNATIONAL GEOTEHCNICA1795404/04/2022
Building Lifecycle
All (84)Filed (10)Permit Issued (14)Signed Off (8)Violation (20)Objection (14)Special Inspection (18)
05/04/2022
Signed off — Alteration
HEREWITH FILED FOR NEW 7-STORY AND CELLAR 18 UNIT MULTIPLE DWELLING WITH 7 PARKING SPACES ON LOT#31 AND 2 ON LOT #35.
Q00374701-I1
05/03/2022
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00089182-I1
04/29/2022
Signed off — Alteration
INSTALLATION OF PLUMBING FIXTURES AND PIPING HYDRAULICALLY CALCULATED SPRINKLER SYSTEM THROUGHOUT 7 STORY AND CELLAR 18 UNIT MULTIPLE DWELLING. FILED IN CONJUNCTION WITH NEW BUILDING, BIS # 421943776.
Q00346265-I1
04/27/2022
Signed off — Alteration
Q00346277-I1
04/11/2022
Signed off — Alteration
INSTALLATION OF A TEMPORARY 8' CONSTRUCTION FENCE
Q00365345-I1
04/11/2022
Special inspection requirement — HVAC and service water heating equipment
MICHAEL KARANTINIDIS, P.E.
04/11/2022
Special inspection requirement — Sprinkler Systems
MICHAEL KARANTINIDIS, P.E.
04/11/2022
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
MICHAEL KARANTINIDIS, P.E.
04/11/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MICHAEL KARANTINIDIS, P.E.
04/11/2022
Special inspection requirement — Maintenance information
MICHAEL KARANTINIDIS, P.E.
04/11/2022
Special inspection requirement — HVAC and service water heating system controls
MICHAEL KARANTINIDIS, P.E.
04/11/2022
Special inspection requirement — HVAC insulation and sealing
MICHAEL KARANTINIDIS, P.E.
04/07/2022
Signed off — Alteration
installation of construction fence, to protect site during demolition of house and garage, under DM#s 421611269 & 421611278
Q00052617-I1
04/04/2022
Filed — Alteration
INSTALLATION OF PLUMBING FIXTURES AND PIPING HYDRAULICALLY CALCULATED SPRINKLER SYSTEM THROUGHOUT 7 STORY AND CELLAR 18 UNIT MULTIPLE DWELLING. FILED IN CONJUNCTION WITH NEW BUILDING, BIS # 421943776.
Q00346265-P1
04/04/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MICHAEL KARANTINIDIS, P.E.
04/04/2022
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
MICHAEL KARANTINIDIS, P.E.
04/04/2022
Special inspection requirement — Sprinkler Systems
MICHAEL KARANTINIDIS, P.E.
04/04/2022
Special inspection requirement — HVAC and service water heating system controls
MICHAEL KARANTINIDIS, P.E.
04/04/2022
Special inspection requirement — Maintenance information
MICHAEL KARANTINIDIS, P.E.
04/04/2022
Special inspection requirement — HVAC insulation and sealing
MICHAEL KARANTINIDIS, P.E.
04/04/2022
Special inspection requirement — HVAC and service water heating equipment
MICHAEL KARANTINIDIS, P.E.
03/31/2022
Permit issued — Structural
Q00374701-I1-ST
03/22/2022
Permit issued — Mechanical Systems
Q00346277-I1-MS
12/13/2021
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED AND OVERHEAD PROTECTION AS PER PLANS. SIDEWALK SHED LIVE LOAD WILL BE 300 PSF, SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00473945-I1
12/08/2021
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AND NEEDLE BEAMS AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00533690-I1
10/26/2021
Violation issued (ECB, closed)
Construction
10/26/2021
Violation issued (ECB, closed)
Construction
09/24/2021
Special inspection requirement — Final
MD TOHFAZ UDDIN
09/23/2021
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD AND NEEDLE BEAMS AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00533690-P1
08/18/2021
Permit issued — Construction Fence
Q00365345-I1-FN
06/29/2021
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD AND NEEDLE BEAMS AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00533690-I1
06/29/2021
Permit issued — Supported Scaffold
Q00533690-I1-SF
05/06/2021
Permit issued — Construction Fence
Q00365345-I1-FN
04/21/2021
Permit issued — Plumbing
Q00346265-I1-EW-SP
04/20/2021
Permit issued — Plumbing
Q00346265-I1-PL
04/14/2021
Violation issued (HPD, closed)
I
04/14/2021
Violation issued (HPD, closed)
A
03/25/2021
Violation issued (ECB, closed)
Construction
03/25/2021
Violation issued (ECB, closed)
Unknown
03/25/2021
Violation issued (ECB, closed)
Unknown
03/25/2021
Violation issued (ECB, closed)
Unknown
03/24/2021
Violation issued (ECB, closed)
Construction
02/26/2021
Permit issued — Sidewalk Shed
Q00473945-I1-SH
02/25/2021
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AND OVERHEAD PROTECTION AS PER PLANS. SIDEWALK SHED LIVE LOAD WILL BE 300 PSF, SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00473945-I1
02/22/2021
Special inspection requirement — Final
Eric Foster
01/08/2021
Violation issued (ECB, closed)
Construction
01/08/2021
Violation issued (ECB, closed)
Construction
08/28/2020
Permit issued — Construction Fence
Q00365345-I1-FN
07/31/2020
Objection raised — Admin
07/31/2020
Objection resolved — Addressed
07/31/2020
Objection raised — Admin
07/31/2020
Objection resolved — Addressed
07/31/2020
Objection raised — Structural
07/31/2020
Objection resolved — Addressed
07/31/2020
Objection raised — Admin
07/31/2020
Objection resolved — Addressed
07/30/2020
Filed — Alteration
HEREWITH FILED FOR NEW 7-STORY AND CELLAR 18 UNIT MULTIPLE DWELLING WITH 7 PARKING SPACES ON LOT#31 AND 2 ON LOT #35.
Q00374701-I1
07/10/2020
Objection raised — Scope
07/10/2020
Objection resolved — Addressed
07/08/2020
Filed — Alteration
INSTALLATION OF A TEMPORARY 8' CONSTRUCTION FENCE
Q00365345-I1
Latest 60 of 84 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offSHOWCASE DESIGNS CORP03/31/2022
DOB NOWMechanical SystemsSigned-offSHOWCASE DESIGNS CORP03/22/2022
DOB NOWConstruction FenceSigned-offSHOWCASE DESIGNS CORP08/18/2021
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC06/29/2021
DOB NOWConstruction FenceSigned-offSHOWCASE DESIGNS CORP05/06/2021
DOB NOWPlumbingSigned-offFULL CAPACITY FIRE CORP04/21/2021
DOB NOWPlumbingSigned-offSCIALLI & SONS INC04/20/2021
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC02/26/2021
DOB NOWConstruction FenceSigned-offSHOWCASE DESIGNS CORP08/28/2020
DOB NOWConstruction FenceSigned-offSHOWCASE DESIGNS CORP07/06/2020
DOB NOWConstruction FenceSigned-offSHOWCASE DESIGNS CORP05/08/2020
DOB NOWConstruction FenceSigned-offSHOWCASE DESIGNS CORP10/08/2019
DOB NOWSidewalk ShedSigned-offREPUBLIC SCAFFOLD&HOIST C10/18/2018
DOB NOWConstruction FenceSigned-offSHOWCASE DESIGNS CORP08/10/2018
BIS—ISSUEDSHOWCASE DESIGNS CORP08/17/2021
BIS—ISSUEDSHOWCASE DESIGNS CORP06/18/2021
BIS—ISSUEDSHOWCASE DESIGNS CORP10/20/2020
BIS—ISSUEDSHOWCASE DESIGNS CORP10/20/2020
BIS—ISSUEDDISANO CONSTRUCTION CO IN09/19/2018
6 projects · most recent 05/06/2022
General Wiring
FiledStatusContractorScope
05/06/2022CompleteKNIGHT ELEC'L SERV. CORP.General Wiring
11/18/2021CompleteG. POULAKIS ELEC'L CONTR'19 meters, 19 new_meters
08/25/2021CompleteG. POULAKIS ELEC'L CONTR'General Wiring
05/25/2021CompleteG. POULAKIS ELEC'L CONTR'General Wiring
02/22/2021CompleteILLUMINOUS ELECTRIC CORP.—
10/15/2018CompleteNASH ELECTRIC SERVICES IN—
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
04/11/2022HVAC and service water heating equipment MICHAEL KARANTINIDIS, P.E.energy_progress
04/11/2022Sprinkler SystemsMICHAEL KARANTINIDIS, P.E.special
04/11/2022Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesMICHAEL KARANTINIDIS, P.E.special
04/11/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMICHAEL KARANTINIDIS, P.E.special
04/11/2022Maintenance informationMICHAEL KARANTINIDIS, P.E.energy_progress
04/11/2022HVAC and service water heating system controls MICHAEL KARANTINIDIS, P.E.energy_progress
04/11/2022HVAC insulation and sealing MICHAEL KARANTINIDIS, P.E.energy_progress
04/04/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMICHAEL KARANTINIDIS, P.E.special
04/04/2022Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesMICHAEL KARANTINIDIS, P.E.special
04/04/2022Sprinkler SystemsMICHAEL KARANTINIDIS, P.E.special
04/04/2022HVAC and service water heating system controls MICHAEL KARANTINIDIS, P.E.energy_progress
04/04/2022Maintenance informationMICHAEL KARANTINIDIS, P.E.energy_progress
04/04/2022HVAC insulation and sealing MICHAEL KARANTINIDIS, P.E.energy_progress
04/04/2022HVAC and service water heating equipment MICHAEL KARANTINIDIS, P.E.energy_progress
09/24/2021FinalMD TOHFAZ UDDINprogress
02/22/2021FinalEric Fosterprogress
07/01/2020FinalMICHAEL KARANTINIDIS, P.E.progress
10/17/2018FinalJOEL PHAGOOprogress
▾Documents — 199 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch4
08/28/2026Q00089182-I1Request digital key ↗
08/27/2026Q00533690-P1Request digital key ↗
08/27/2026Q00533690-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
08/28/2026Q00346265-I1Request digital key ↗
08/15/2026Q00346265-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
08/28/2026Q00346265-I1Request digital key ↗
08/15/2026Q00346265-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/15/2026Q00374701-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/15/2026Q00365345-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/27/2026Q00473945-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/28/2026Q00346277-I1Request digital key ↗
▸Applications & Permits23
▸BISPLAN / WORK APPROVAL APPLICATION17
03/30/2022421943776Open ↗
03/23/2022421943776Open ↗
03/21/2022440514837Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION4
11/25/2020421943776Open ↗
11/25/2020421943776Open ↗
11/25/2020421943776Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
03/16/2022421943776Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
04/01/2022440604767Open ↗
▸Zoning, Tax Lot & Property Records7
▸BISRESTRICTION: EASEMENT AGREEMENT1
04/11/2022421943776Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
07/22/2020421943776Open ↗
▸BISVERIFY TAX LOT1
04/12/2022421943776Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
04/21/2020421943776Open ↗
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
09/22/2020421943776Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
03/10/2022421943776Open ↗
▸BISZONING DIAGRAM1
11/25/2020421943776Open ↗
▸Seals & Professional Certifications34
▸DOB NOWProgress Inspector Seal & Signature12
09/02/2026Q00533690-I1Open ↗
08/28/2026Q00346265-I1Open ↗
08/28/2026Q00473945-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/28/2026Q00346277-I1Open ↗
08/28/2026Q00346265-I1Open ↗
08/28/2026Q00374701-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/28/2026Q00346265-I1Open ↗
08/28/2026Q00346265-I1Open ↗
08/28/2026Q00346265-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
01/10/2019421675468Open ↗
12/14/2018421675468Open ↗
10/20/2018421611269Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
07/08/2020440604767Open ↗
10/12/2018440514837Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/08/2020440604767Open ↗
▸Trade Schedules & Equipment6
▸BISSEWER CONNECTION: DEP SD1 & SD21
12/22/2018421675468Open ↗
▸BISELECTRIC CUT-OFF1
10/20/2018421611269Open ↗
▸BISSEWER CUT-OFF1
10/20/2018421611269Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
12/11/2018421675468Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
04/12/2022421943776Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
04/12/2022421943776Open ↗
▸Safety & Tenant Protection11
▸BISSTREET TREE CHECKLIST3
07/08/2020440604767Open ↗
04/16/2020421943776Open ↗
12/14/2018421675468Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
10/09/2020421943776Open ↗
10/20/2018421611269Open ↗
▸BISSTREET TREE SIGNOFF2
04/12/2022421943776Open ↗
03/31/2022440604767Open ↗
▸BISSTREET TREES SITE PLAN1
04/12/2022421943776Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
04/04/2022421943776Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
10/20/2018421611269Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
10/09/2020421943776Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
10/09/2020421943776Open ↗
09/22/2020421943776Open ↗
09/22/2020421943776Open ↗
Showing 3 of 5 on file for this type
▸BISAIR SEALING AND INSULATION - VISUAL1
04/04/2022421943776Open ↗
▸BISINTERIOR LIGHTING POWER1
04/04/2022421943776Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/04/2022421943776Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
04/04/2022421943776Open ↗
▸BISFENESTRATION AREAS1
04/04/2022421943776Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
04/04/2022421943776Open ↗
▸BISLIGHTING IN DWELLING UNITS1
04/04/2022421943776Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
04/04/2022421943776Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00346277-I1Open ↗
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY7
10/09/2020421943776Open ↗
10/09/2020421943776Open ↗
07/22/2020421943776Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION2
04/16/2020421943776Open ↗
12/14/2018421675468Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
05/24/2022421943776Open ↗
10/09/2020421943776Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF2
03/10/2022421943776Open ↗
10/09/2020421943776Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
05/24/2022421943776Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
04/04/2022421943776Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
04/04/2022421943776Open ↗
▸BISBORINGS / TEST PITS (TR-4) 27-7201
12/14/2018421675468Open ↗
▸Approvals, Objections & Sign-offs13
▸BISLETTERS - SUPPORTING DOCUMENTATION7
09/22/2020421943776Open ↗
07/23/2020421943776Open ↗
07/22/2020421943776Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
03/30/2022421943776Open ↗
08/06/2020421943776Open ↗
07/20/2020421943776Open ↗
Showing 3 of 4 on file for this type
▸BISTAP LETTER - DOM SVC : DEP-DOM1
10/20/2018421611269Open ↗
▸BISLANDMARKS APPROVAL1
10/20/2018421611269Open ↗
▸Cost, Insurance & Ownership3
▸BISPROJECT-SPECIFIC GL INSURANCE2
11/25/2020421943776Open ↗
10/20/2018421611269Open ↗
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
04/01/2022440604767Open ↗
▸Filing & Intake Forms18
▸BISADDITIONAL INFORMATION10
05/24/2022421943776Open ↗
04/28/2022421943776Open ↗
04/11/2022421943776Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING COVER SHEET3
05/04/2020421943776Open ↗
04/17/2020421943776Open ↗
06/14/2018421611269Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
07/08/2020440604767Open ↗
10/12/2018440514837Open ↗
▸BISBOROUGH INTAKE FORM2
05/04/2020421943776Open ↗
04/17/2020421943776Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
07/08/2020440604767Open ↗
▸Other Documents9
▸BISBPP - SUPPORTING DOCUMENTATION4
04/01/2022440604767Open ↗
04/01/2022440604767Open ↗
04/01/2022440604767Open ↗
Showing 3 of 4 on file for this type
▸BISPLOT DIAGRAM2
03/10/2022421943776Open ↗
04/16/2020421943776Open ↗
▸BISSITE SURVEY: INITIAL1
—421943776Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
04/21/2020421943776Open ↗
▸BISMAINTENANCE INFORMATION1
04/04/2022421943776Open ↗