← Back
Elevator apt, semi-fireproof with stores
25-28 BROADWAY
QUEENS · BIN 4618176
💬 Discuss this project
2018Year Built
7Stories
D7Building Class
R6AZoning
25,673 sfGross Floor Area
23Units
Rent Stabilized0 Open ViolationsFISP: SAFE
Elevator apt, semi-fireproof with stores · Owner of record: IL FIGARO LLC · 5,277 sf lot · 4.87 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CLASSIC CONSULTING GROUP907/08/2026
SANVITO REALTY HOLDING6303/22/2026
SANTIVO REALTY HOLDING CO103/22/2026
DISAV103/22/2026
COLGATE ENTERPRISE103/22/2026
SANRITO REALTY HOLDING CO103/22/2026
SANVITO REALTY603/21/2026
2528 KINGS SMOKE SHOPS103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/30/2016$2.7M—25-28 BROADWAY LLC → SANVITO REALTY HOLDING CORP.— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALPHA HOME DESIGN LLC109/27/2022
GREEN DESIGN208/03/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
INDESIGN STUDIO203/21/2026
ATLANTIC BUILDING SUPPLY INC.403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CLASSIC CONSULTING GROUPGeneral Contractor907/08/2026
SANVITO REALTY HOLDING CORPGeneral Contractor703/22/2026
MICHAEL BAPTISTEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YAN GAO6619109/27/2022
Building Lifecycle
All (81)Filed (3)Permit Issued (6)Signed Off (2)Facade (FISP) (3)Violation (60)Objection (7)
09/11/2026
Cycle 10 facade report signed — SAFE
09/10/2026
Cycle 10 facade report submitted
08/18/2026
Cycle 10 facade inspection completed
09/29/2022
Objection raised — Admin
09/29/2022
Objection raised — Admin
09/29/2022
Objection raised — Admin
09/29/2022
Objection raised — Admin
09/29/2022
Objection raised — Admin
09/29/2022
Objection raised — Admin
09/29/2022
Objection raised — Admin
09/27/2022
Filed — Alteration
Q08010016-I1
07/29/2022
Violation issued (ECB, closed)
Construction
06/16/2022
Violation issued (ECB, closed)
Construction
03/10/2022
Violation issued (HPD, closed)
A
10/28/2020
Signed off — Alteration
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD , NEEDLE BEAM, ROOF PROTECTION AND MATERIAL HOIST FOR NEW BUILDING AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00204876-I1
10/28/2020
Signed off — Alteration
Q00099020-I1
11/22/2019
Violation issued (ECB, closed)
Construction
11/22/2019
Violation issued (ECB, closed)
Construction
09/19/2019
Permit issued — Sidewalk Shed
Q00099020-I1-SH
09/18/2019
Permit issued — Supported Scaffold
Q00204876-I1-SF
09/09/2019
Violation issued (ECB, closed)
Construction
09/09/2019
Violation issued (ECB, closed)
Unknown
09/09/2019
Violation issued (ECB, closed)
Unknown
09/09/2019
Violation issued (ECB, closed)
Construction
08/05/2019
Permit issued — Supported Scaffold
Q00204876-I1-SF
08/03/2019
Filed — Alteration
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD , NEEDLE BEAM, ROOF PROTECTION AND MATERIAL HOIST FOR NEW BUILDING AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00204876-I1
06/28/2019
Permit issued — Sidewalk Shed
Q00099020-I1-SH
06/27/2019
Permit issued — Sidewalk Shed
Q00099020-I1-SH
06/20/2019
Violation issued (ECB, closed)
Construction
06/06/2019
Violation issued (ECB, closed)
Construction
04/11/2019
Violation issued (ECB, closed)
Construction
04/11/2019
Violation issued (ECB, closed)
Construction
04/02/2019
Violation issued (ECB, closed)
Construction
11/13/2018
Permit issued — Sidewalk Shed
Q00099020-I1-SH
11/12/2018
Filed — Alteration
Q00099020-I1
08/09/2018
Violation issued (ECB, closed)
Construction
08/09/2018
Violation issued (ECB, closed)
Construction
08/09/2018
Violation issued (ECB, closed)
Unknown
05/03/2018
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
05/03/2018
Violation issued (ECB, closed)
Construction
05/03/2018
Violation issued (ECB, closed)
Construction
04/25/2018
Violation issued (ECB, closed)
Construction
11/20/2017
Violation issued (ECB, closed)
Construction
10/26/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/2016
Violation issued (ECB, closed)
Construction
01/27/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/27/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/27/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/27/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/27/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/10/2015
Violation issued (ECB, closed)
Construction
11/06/2015
Violation issued (ECB, closed)
Construction
10/30/2015
Violation issued (ECB, closed)
Construction
10/30/2015
Violation issued (ECB, closed)
Construction
10/30/2015
Violation issued (ECB, closed)
Construction
10/30/2015
Violation issued (ECB, closed)
Construction
10/29/2015
Violation issued (ECB, closed)
Construction
10/29/2015
Violation issued (ECB, closed)
Construction
10/29/2015
Violation issued (ECB, closed)
Construction
10/29/2015
Violation issued (ECB, closed)
Construction
Latest 60 of 81 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offCLASSIC CONSULTING GROUP09/19/2019
DOB NOWSupported ScaffoldSigned-offCLASSIC CONSULTING GROUP09/18/2019
DOB NOWSupported ScaffoldSigned-offCLASSIC CONSULTING GROUP08/05/2019
DOB NOWSidewalk ShedSigned-offCLASSIC CONSULTING GROUP06/28/2019
DOB NOWSidewalk ShedSigned-offCLASSIC CONSULTING GROUP06/27/2019
DOB NOWSidewalk ShedSigned-offCLASSIC CONSULTING GROUP11/13/2018
BIS—ISSUEDSANVITO REALTY HOLDING CORP03/17/2021
BISEQISSUEDSANVITO REALTY HOLDING CORP12/28/2020
BIS—ISSUEDSANVITO REALTY HOLDING CORP12/28/2020
BISPLISSUEDMEJ PLUMBING LLC06/23/2020
BISOTISSUEDSANVITO REALTY HOLDING CORP05/14/2020
BIS—ISSUEDSANVITO REALTY HOLDING CORP03/10/2020
BISEQISSUEDSANVITO REALTY HOLDING CORP12/05/2019
BISPLISSUEDMEJ PLUMBING LLC05/16/2019
BISOTISSUEDSANVITO REALTY HOLDING CORP12/19/2018
BIS—ISSUEDSANVITO REALTY HOLDING CORP04/12/2018
BISEQISSUEDSANVITO REALTY HOLDING CORP04/12/2018
BISOTISSUEDSANVITO REALTY HOLDING CORP02/01/2018
BISOTISSUEDSANVITO REALTY HOLDING CORP02/01/2018
BISEQISSUEDSANVITO REALTY HOLDING CORP12/26/2017
BISOTISSUEDSANVITO REALTY HOLDING CORP12/26/2017
BISOTISSUEDSANVITO REALTY HOLDING CORP12/26/2017
BISOTISSUEDSANVITO REALTY HOLDING CORP11/13/2017
BISOTISSUEDSANVITO REALTY HOLDING CORP11/13/2017
BISOTISSUEDSANVITO REALTY HOLDING CORP11/09/2017
BISOTISSUEDSANVITO REALTY HOLDING CORP11/09/2017
BISEQISSUEDSANVITO REALTY HOLDING CORP04/07/2017
BISEQISSUEDSANVITO REALTY HOLDING CORP04/03/2017
BISOTISSUEDSANVITO REALTY HOLDING CORP12/15/2016
BISEQISSUEDSANVITO REALTY HOLDING CORP12/05/2016
BISEQISSUEDSANVITO REALTY HOLDING CORP10/27/2016
BIS—ISSUEDSANVITO REALTY HOLDING CORP10/29/2015
BISEQISSUEDSANVITO REALTY HOLDING CORP10/29/2015
BIS—ISSUEDSANVITO REALTY HOLDING CORP10/29/2015
BISEQISSUEDSANVITO REALTY HOLDING CORP06/30/2015
BIS—ISSUEDSANVITO REALTY HOLDING CORP05/08/2015
BISEQISSUEDSANVITO REALTY HOLDING CORP04/29/2015
BISOTISSUEDSANVITO REALTY HOLDING CORP04/02/2015
BISOTISSUEDSANVITO REALTY HOLDING CORP10/06/2014
BISEQISSUEDSANVITO REALTY HOLDING CORP09/11/2014
+ 7 more permits on file
4 projects · most recent 08/10/2022
General Wiring
FiledStatusContractorScope
08/10/2022Permit IssuedWCK ELECTRIC CORP.General Wiring
03/03/2021CompleteSALZMAN ELECTRIC CO., INCGeneral Wiring
09/18/2019CompleteKJK ELECTRIC INC—
11/12/2018CompleteRICHARD NEU—
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
09/26/2022Structural Stability – Alterations of existing buildingsYAN GAOspecial
09/26/2022FinalYAN GAOprogress
11/12/2018FinalBRIAN T. O'CONNORprogress
▾Documents — 509 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
08/28/2026Q00099020-I1Request digital key ↗
08/25/2026Q08010016-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/28/2026Q00204876-I1Request digital key ↗
▸Applications & Permits136
▸BISPLAN / WORK APPROVAL APPLICATION94
06/02/2022421429975Open ↗
09/17/2021421366827Open ↗
06/15/2021421366827Open ↗
Showing 3 of 94 on file for this type
▸BISWORK PERMIT APPLICATION31
02/21/2020421366827Open ↗
05/28/2019421366827Open ↗
01/02/2019421457943Open ↗
Showing 3 of 31 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications7
06/10/2021421366836Open ↗
06/01/2021421429975Open ↗
05/28/2021421366845Open ↗
Showing 3 of 7 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1132
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISINTENT TO REVOKE APPROVAL/PERMIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
03/04/2021421366836Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISZONING DIAGRAM3
06/19/2020421366827Open ↗
Showing 1 of 3 on file for this type
▸Seals & Professional Certifications60
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION43
06/02/2022421366827Open ↗
08/27/2021421366827Open ↗
01/05/2019421574380Open ↗
Showing 3 of 43 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/25/2026Q08010016-I1Open ↗
08/13/2026Q00099020-I1Open ↗
08/13/2026Q00204876-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026Q00099020-I1Open ↗
08/27/2026Q08010016-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026Q08010016-I1Open ↗
▸Trade Schedules & Equipment33
▸BISSCHEDULE B - PLUMBING14
06/15/2021421366827Open ↗
06/14/2021421366827Open ↗
06/08/2021421366827Open ↗
Showing 3 of 14 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE13
07/19/2019421366827Open ↗
07/17/2019421366827Open ↗
05/22/2019421366827Open ↗
Showing 3 of 13 on file for this type
▸BISEQUIPMENT USE PERMITS2
06/02/2022421366827Open ↗
10/29/2021421366827Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA2
10/20/2021421535912Open ↗
10/20/2021421366827Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
06/02/2022421366827Open ↗
10/29/2021421366827Open ↗
▸Safety & Tenant Protection9
▸BISSTREET TREE CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
01/02/2019421457943Open ↗
Showing 1 of 2 on file for this type
▸BISTenant Protection Plan and Notes2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREE SIGNOFF2
05/25/2021421366836Open ↗
04/22/2021421366827Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
01/05/2019421574380Open ↗
01/05/2019421574406Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
04/22/2021421366827Open ↗
03/26/2021421457943Open ↗
▸Inspections & Test Reports36
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER11
05/07/2021421366827Open ↗
01/02/2019421457943Open ↗
Showing 2 of 11 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX8
01/02/2019421457943Open ↗
01/02/2019421457943Open ↗
Showing 2 of 8 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY3
01/11/2021421366827Open ↗
05/26/2020421457943Open ↗
Showing 2 of 3 on file for this type
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING2
03/30/2021421366827Open ↗
03/26/2021421457943Open ↗
▸BISMASONRY2
04/02/2021421366827Open ↗
03/26/2021421457943Open ↗
▸BISSTRUCTURAL STEEL - WELDING2
03/30/2021421366827Open ↗
03/26/2021421457943Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP2
04/02/2021421366827Open ↗
03/26/2021421457943Open ↗
▸BISSoil Report2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
03/26/2021421457943Open ↗
▸Approvals, Objections & Sign-offs47
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST14
10/28/2021421535912Open ↗
06/15/2021421366836Open ↗
06/01/2021421429975Open ↗
Showing 3 of 14 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE13
03/22/2021421366827Open ↗
03/11/2021421366827Open ↗
06/19/2020421366827Open ↗
Showing 3 of 13 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
06/07/2018421366827Open ↗
Showing 1 of 7 on file for this type
▸BISBPP: FINAL SIGNOFF2
08/11/2021421366827Open ↗
06/15/2021421366836Open ↗
▸BISFA LETTER OF DEFECT : FD-FALD1
11/23/2021421366827Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
06/10/2021421366836Open ↗
▸Cost, Insurance & Ownership29
▸BISCOST AFFIDAVIT11
10/28/2021421535912Open ↗
01/05/2019421574380Open ↗
01/05/2019421574406Open ↗
Showing 3 of 11 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISINSURANCE: LIABILITY2
07/14/2021421535912Open ↗
05/25/2021421366836Open ↗
▸BISINSURANCE: WORKERS' COMPENSATION2
07/14/2021421535912Open ↗
05/25/2021421366836Open ↗
▸BISINSURANCE: DISABILITY2
07/14/2021421535912Open ↗
05/25/2021421366836Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP: ENGINEERS AFFIDAVIT1
06/10/2021421366836Open ↗
▸Filing & Intake Forms81
▸BISADDITIONAL INFORMATION32
05/26/2021421366827Open ↗
04/28/2021421366827Open ↗
04/28/2021421366827Open ↗
Showing 3 of 32 on file for this type
▸BISBOROUGH INTAKE FORM29
06/02/2022421429975Open ↗
07/18/2019421366845Open ↗
06/17/2019421366836Open ↗
Showing 3 of 29 on file for this type
▸BISEFILING COVER SHEET19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents11
▸BISPLOT DIAGRAM3
10/01/2021421366827Open ↗
Showing 1 of 3 on file for this type
▸BISTCO - Supporting Documents2
08/24/2021421366827Open ↗
08/23/2021421366827Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
10/20/2021421366827Open ↗
04/27/2021421366845Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION2
06/10/2021421366836Open ↗
12/13/2020421366836Open ↗
▸BISSITE CONNECTION:DEP1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)1
04/12/2021421366827Open ↗