Rent Stabilized4 Open Violations 2 unresolved · 2 paperwork only▸
HPD05/07/2026(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
HPD06/12/2025(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
ECB11/20/2025I OBSERVED AT TIME OF INSPECTION IN CELLAR NEW 1/2" GAS PIPING BRANCHING OF 1ST FLOOR HOUSE GAS PIPE. NO PERMITS ON FILE IN DOB RECORDS FOR WORK THAT IS 100% COMPLETED, OBTAIN ALL PERMITSNothing owed — awaiting certificate of correction
ECB11/20/2025I OBSERVED AT TIME OF INSPECTION IN CELLAR UNION ON GAS PIPING WHICH IS PROHIBITED BY NYC FGC 403.10.1.1. ALSO OBSERVED IN CELLAR PEX TUBING USED ON DOMESTIC WHICH IS PROHIBITED BY NYC PC 605.4, REPAIR AND/OR RNothing owed — awaiting certificate of correction
Three families · 4,000 sf lot · 0.75 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.