← Back
Elevator apt, semi-fireproof without stores
25-40 36 STREET
QUEENS · Astoria (Central) · BIN 4009443
💬 Discuss this project
2019Year Built
5Stories
D1Building Class
R6BZoning
7,448 sfGross Floor Area
10Units
Rent Stabilized20 Open Violations 7 unresolved · 13 paperwork only ▸
Elevator apt, semi-fireproof without stores · Owner of record: ISMAEL REALTY CORP. · 1,664 sf lot · 4.48 FAR built · Flood zone X
Locations of Work
Permit Issued — active, not yet Signed-off
Floor 51 filing · 9 docs
Floor 41 filing · 9 docs
Floor 31 filing · 9 docs
Floor 21 filing · 9 docs
Floor 1Under Construction1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ISMAEL REALTY3207/08/2026
DHC CONTRACTING3707/08/2026
TRI BOROUGH SCAFFOLDING1507/08/2026
HKS CONSTRUCTION604/09/2026
DNC CONTRACTING INC103/22/2026
NS ENGINEERING & CONSULTI203/22/2026
JUST CONSULTING ENGINEERI103/22/2026
AJD CONTRACTOR103/22/2026
KLE CONSULTING ENGINEERIN103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KP CONSULTING ENGINEER603/21/2026
KMP DESIGN ENGINEERING403/21/2026
GEIGER E A GROUP603/21/2026
HAIDER ENGINEERING, P.E.103/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
HAIDER ENGINEERING P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRI BOROUGH SCAFFOLDINGGeneral Contractor1407/08/2026
DHC CONTRACTING INCGeneral Contractor1207/08/2026
HM BUILD AND UPLIFT CORPGeneral Contractor904/09/2026
MC SUPERSTRUCTURE INCGeneral Contractor907/08/2026
DPH PLUMBING & HTG CORPPlumbing403/22/2026
S & L PLUMBING INCPlumbing303/22/2026
HKS CONSTRUCTION CORPGeneral Contractor204/09/2026
V. VASS ELECTRIC CORPElectrical203/22/2026
CITY BUILDERS INCGeneral Contractor203/21/2026
4000 ELECTRIC CORPElectrical103/22/2026
JOHN AHRENSElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KCE CONSULTING ENGINEERIN3712310/09/2025
Building Lifecycle
All (136)Filed (13)Permit Issued (30)Signed Off (5)Violation (60)Inspection (4)Objection (21)Special Inspection (3)
03/10/2026
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01337418-I1
01/19/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01337418-P1
01/09/2026
Permit issued — Construction Fence
Q00088283-I1-FN
12/23/2025
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01337418-I1
12/23/2025
Permit issued — Supported Scaffold
Q01337418-I1-SF
11/26/2025
Signed off — Alteration
Q00282074-I1
11/26/2025
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED, PIPE SCAFFOLD, ROOF PROTECTION, AND NEEDLE BEAM AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01186954-I1
11/26/2025
Signed off — Alteration
Q00691426-I1
10/30/2025
Objection raised — Other
10/22/2025
Signed off — Alteration
Q00013545-I1
10/09/2025
Filed — Alteration
FILING FOR TEMPORARY OVERHEAD PROTECTION ON EXPOSURE 4.
Q00561459-P2
09/05/2025
Violation issued (ECB, open)
Construction
09/05/2025
Violation issued (ECB, closed)
Construction
08/08/2025
Permit issued — Sidewalk Shed
Q00282074-I1-SH
04/18/2025
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED, PIPE SCAFFOLD, ROOF PROTECTION, AND NEEDLE BEAM AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01186954-P2
04/04/2025
Violation issued (ECB, open)
Unknown
04/04/2025
Violation issued (ECB, open)
Site Safety
03/20/2025
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED, PIPE SCAFFOLD, ROOF PROTECTION, AND NEEDLE BEAM AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01186954-P1
02/28/2025
Permit issued — Supported Scaffold
Q01186954-I1-SH
02/28/2025
Permit issued — Supported Scaffold
Q01186954-I1-SF
02/26/2025
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED, PIPE SCAFFOLD, ROOF PROTECTION, AND NEEDLE BEAM AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01186954-I1
01/31/2025
Permit issued — Construction Fence
Q00088283-I1-FN
09/20/2024
Permit issued — Supported Scaffold
Q00691426-I1-SF
09/11/2024
Permit issued — Supported Scaffold
Q00691426-I1-SF
09/04/2024
Permit issued — Sidewalk Shed
Q00282074-I1-SH
07/30/2024
Permit issued — Construction Fence
Q00088283-I1-FN
06/20/2024
Violation issued (ECB, closed)
Unknown
06/13/2024
Violation issued (ECB, closed)
Unknown
06/13/2024
Violation issued (ECB, closed)
Unknown
06/13/2024
Violation issued (ECB, closed)
Construction
06/13/2024
Violation issued (ECB, closed)
Construction
06/13/2024
Violation issued (ECB, closed)
Unknown
05/30/2024
Violation issued (ECB, closed)
Construction
01/02/2024
Violation issued (ECB, closed)
Unknown
11/29/2023
Permit issued — Construction Fence
Q00088283-I1-FN
09/07/2023
Permit issued — Sidewalk Shed
Q00282074-I1-SH
06/13/2023
Permit issued — Sidewalk Shed
Q00282074-I1-SH
05/23/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/17/2023
Violation issued (ECB, closed)
Construction
03/21/2023
Violation issued (ECB, closed)
Construction
03/03/2023
Permit issued — Supported Scaffold
Q00691426-I1-SF
01/26/2023
Permit issued — Construction Fence
Q00088283-I1-FN
01/10/2023
Violation issued (ECB, closed)
Construction
05/11/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/11/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/11/2022
Permit issued — Sidewalk Shed
Q00282074-I1-SH
03/10/2022
Violation issued (ECB, closed)
Construction
03/10/2022
Violation issued (ECB, closed)
Construction
03/09/2022
Permit issued — Supported Scaffold
Q00691426-I1-SF
03/08/2022
Filed — Alteration
Q00691426-I1
03/08/2022
Violation issued (ECB, closed)
Construction
02/11/2022
Violation issued (ECB, open)
Unknown
02/11/2022
Violation issued (ECB, closed)
Construction
01/24/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/14/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Kemba Walcott
01/13/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/30/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/30/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/14/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Kemba Walcott
12/13/2021
Objection resolved — Addressed
Latest 60 of 136 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedHM BUILD UPLIFT01/09/2026
DOB NOWSupported ScaffoldSigned-offMC SUPERSTRUCTURE INC12/23/2025
DOB NOWSidewalk ShedSigned-offMC SUPERSTRUCTURE INC08/08/2025
DOB NOWSupported ScaffoldSigned-offMC SUPERSTRUCTURE INC02/28/2025
DOB NOWSupported ScaffoldSigned-offMC SUPERSTRUCTURE INC02/28/2025
DOB NOWConstruction FencePermit IssuedHM BUILD UPLIFT01/31/2025
DOB NOWSupported ScaffoldSigned-offMC SUPERSTRUCTURE INC09/20/2024
DOB NOWSupported ScaffoldSigned-offMC SUPERSTRUCTURE INC09/11/2024
DOB NOWSidewalk ShedSigned-offMC SUPERSTRUCTURE INC09/04/2024
DOB NOWConstruction FencePermit IssuedHM BUILD UPLIFT07/30/2024
DOB NOWConstruction FencePermit IssuedHM BUILD UPLIFT11/29/2023
DOB NOWSidewalk ShedSigned-offMC SUPERSTRUCTURE INC09/07/2023
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING06/13/2023
DOB NOWSupported ScaffoldSigned-offTRI BOROUGH SCAFFOLDING03/03/2023
DOB NOWConstruction FencePermit IssuedHM BUILD UPLIFT01/26/2023
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING04/11/2022
DOB NOWSupported ScaffoldSigned-offTRI BOROUGH SCAFFOLDING03/09/2022
DOB NOWProtection and Mechanical MethodsPermit IssuedALEXANDER CHAN10/13/2021
DOB NOWConstruction FencePermit IssuedALEXANDER CHAN06/18/2021
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING03/31/2021
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING11/24/2020
DOB NOWConstruction FencePermit IssuedALEXANDER CHAN06/23/2020
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING04/02/2020
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING12/17/2019
DOB NOWConstruction FencePermit IssuedALEXANDER CHAN12/05/2019
DOB NOWConstruction FencePermit IssuedALEXANDER CHAN08/02/2019
DOB NOWConstruction FencePermit IssuedALEXANDER CHAN10/29/2018
DOB NOWConstruction FencePermit IssuedCITY BUILDERS INC08/16/2018
DOB NOWSidewalk ShedSigned-offHKS CONSTRUCTION CORP03/09/2018
DOB NOWSidewalk ShedSigned-offHKS CONSTRUCTION CORP01/25/2018
BISPLISSUEDJFR CONSTRUCTION CORP02/12/2026
BIS—ISSUEDHM BUILD AND UPLIFT CORP01/09/2026
BIS—ISSUEDHM BUILD AND UPLIFT CORP07/14/2025
BISPLISSUEDDPH PLUMBING & HTG CORP06/11/2025
BIS—ISSUEDHM BUILD AND UPLIFT CORP01/28/2025
BIS—ISSUEDHM BUILD AND UPLIFT CORP07/29/2024
BIS—ISSUEDHM BUILD AND UPLIFT CORP07/16/2024
BIS—ISSUEDHM BUILD AND UPLIFT CORP08/23/2023
BIS—ISSUEDDHC CONTRACTING INC11/19/2021
BIS—ISSUEDDHC CONTRACTING INC10/06/2021
+ 10 more permits on file
6 projects · most recent 09/17/2026
General Wiring
FiledStatusContractorScope
09/17/2026Permit IssuedRONART ELECTRIC COGeneral Wiring
11/07/2025Permit IssuedTUXEDO ELEC'L CONTR'G INC—
03/01/2022Permit IssuedT.M.T ELECTRIC INCGeneral Wiring
12/18/2019CompleteV. VASS ELECTRIC CORP—
12/13/2019CompleteV. VASS ELECTRIC CORP—
01/23/2018Permit Issued4000 ELECTRIC CORP—
1 project · most recent 08/09/2018
Fence
FiledStatusContractorScope
08/09/2018Permit IssuedCITY BUILDERS INCFence
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/24/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/13/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/30/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/30/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
01/14/2022Structural Stability – Alterations of existing buildingsKemba Walcottspecial
12/14/2021Structural Stability – Alterations of existing buildingsKemba Walcottspecial
12/02/2021Structural Stability – Alterations of existing buildingsKemba Walcottspecial
▾Documents — 121 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch11
08/28/2026Q00069060-I1Request digital key ↗
08/28/2026Q00088283-I1Request digital key ↗
08/27/2026Q00561459-P2Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/28/2026Q00282074-I1Request digital key ↗
▸Applications & Permits23
▸BISWORK PERMIT APPLICATION12
05/27/2025421436743Open ↗
11/22/2023421436743Open ↗
11/08/2023421436743Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION11
06/06/2022421436743Open ↗
10/01/2021421436743Open ↗
08/05/2019421436743Open ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records3
▸BISAMENDED ZONING DIAGRAM1
06/24/2022421436743Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
06/22/2017421436743Open ↗
▸BISZONING DIAGRAM1
08/11/2017421436743Open ↗
▸Seals & Professional Certifications20
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/28/2026Q00088283-I1Open ↗
08/28/2026Q00282074-I1Open ↗
08/27/2026Q00561459-P1Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
11/07/2018421436743Open ↗
11/07/2018421436743Open ↗
08/11/2017421436743Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/26/2026Q00561459-I1Open ↗
08/26/2026Q00561459-P2Open ↗
08/26/2026Q00561459-P1Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
06/05/2017421436743Open ↗
03/27/2017421436743Open ↗
▸BISELECTRIC CUT-OFF1
02/20/2018421419968Open ↗
▸BISSEWER CUT-OFF1
02/20/2018421419968Open ↗
▸BISSCHEDULE B - PLUMBING1
10/01/2021421436743Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST2
05/31/2022421485164Open ↗
03/27/2017421436743Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
02/20/2018421419968Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
02/20/2018421419968Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
02/20/2018421419968Open ↗
▸Environmental & Asbestos2
▸BISRODENT CONTROL1
02/20/2018421419968Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
02/20/2018421419968Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
11/07/2018421436743Open ↗
08/10/2017421436743Open ↗
03/27/2017421436743Open ↗
▸Inspections & Test Reports6
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
12/10/2020421436743Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
06/04/2021421436743Open ↗
▸BISHYDRO FLOW TEST LETTER1
06/15/2017421436743Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
11/07/2018421436743Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
08/11/2017421436743Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
11/07/2018421436743Open ↗
▸Approvals, Objections & Sign-offs11
▸BISLETTERS - SUPPORTING DOCUMENTATION4
11/22/2023421436743Open ↗
02/20/2018421419968Open ↗
08/11/2017421436743Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER3
06/04/2025421436743Open ↗
10/13/2021421436743Open ↗
07/07/2021421436743Open ↗
▸BISNEW CC APPROVAL1
05/31/2022421485164Open ↗
▸BISLANDMARKS SIGNOFF1
02/20/2018421419968Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
06/07/2017421436743Open ↗
▸BISPARK DEPT APPROVAL FOR TREE REMOVAL FORNEW CC1
05/25/2022421485164Open ↗
▸Cost, Insurance & Ownership7
▸BISPROJECT-SPECIFIC GL INSURANCE5
11/22/2023421436743Open ↗
01/13/2022421436743Open ↗
07/07/2021421436743Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT1
06/05/2017421490657Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
02/20/2018421419968Open ↗
▸Filing & Intake Forms16
▸BISEFILING COVER SHEET6
06/05/2017421436743Open ↗
06/05/2017421436743Open ↗
06/05/2017421490657Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION6
06/24/2022421436743Open ↗
06/03/2022421436743Open ↗
11/29/2019421436743Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM4
06/04/2025421436743Open ↗
11/22/2023421436743Open ↗
03/10/2022421436743Open ↗
Showing 3 of 4 on file for this type
▸Other Documents8
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form2
05/24/2017421485164Open ↗
05/24/2017421485164Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
05/31/2022421485164Open ↗
▸BISBEST SQUAD - SUPPORTING DOCUMENTATION1
11/17/2017421419968Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
11/07/2018421436743Open ↗
▸BISPLOT DIAGRAM1
06/15/2017421436743Open ↗
▸BISPVT ON-SITE STORM WATER DISPOSAL SYSTEMS & DETENTION FACL., INSTALLATION1
05/06/2024421436743Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026Q00013545-I1Open ↗