ECB09/05/2025Failure to certify correction for violations # 39056039N, file a certificate of correction$1K due
ECB04/04/2025At time of inspection, i observed multiple unsafe conditions such as; tripping hazards, supported pipe scaffold in use while under amends, no sidewalk shed inspection log or superintendent log, no floor signs,$5K due
ECB04/04/2025At time of inspection, i observed multiple unsafe conditions such as; tripping hazards, supported pipe scaffold in use while under amends, no sidewalk shed inspection log or superintendent log, no floor signs,$10K due
ECB02/11/2022Failure to maintain a record of pre-shift safety meeting for each worker. At time of inspection premises under NB #421436743 observed approximately 7 workers at an active job site asked competent person onsite$5K due
ECB08/24/2020Rcny 101-06(section c) false statements in certificates,forms,written statements,applications,reports,or certificates of correction. Per ceuaudit,ceu observed tr-1 special inspection report for subsurface inves$38K due
ECB07/13/202128-105.1 work without a permit.note at the time of my inspection of a new 5 story building at roof level,i observed wooden structure use as overhead protection at EXP4.review of department records shows that noNothing owed — awaiting certificate of correction
ECB07/07/2021Failure to institute/maintain safety equipment measures or temporary construction-inadequate guardrails.note:at time of inspection observed active job site 5 story new building at roof level under constructionNothing owed — awaiting certificate of correction
ECB06/18/2021Bc 3301.2 failure to provide safety measures(controlled access zone-(az)at time of inspection of this 5 story new building i observed no cazor warning line system on the 5TH floor.all workers where using p.f.a.Nothing owed — awaiting certificate of correction
ECB04/28/2021Failure to safeguard all persons & property affected by construction operation.note:at the time of my inspection of a 5 story bldg at baulkhead level,construction work in progress.i observed construction debriNothing owed — awaiting certificate of correction
ECB04/28/2021Permit holder failed to ensure all workers receive site safety orientation.note:at the time of my inspection of an active job site,i observed 15 workers performing construction activities on site.upon requestNothing owed — awaiting certificate of correction
ECB11/18/2020BC3301.7,AC28-105.12.2 no site-specific formwork design drawings preseent per BC3301.7. Respondent failed to present site-specific formwork drawings during ceu inspection on 7/30/2020. Upon ceu audit of formworNothing owed — awaiting certificate of correction
ECB10/30/2020Failure to provide adequate lot line fence where required.at the time of inspection of a 5 story building i observed they were at 9TH level at in the 1ST level the concrete columns are not enclosed with in theNothing owed — awaiting certificate of correction
ECB09/10/2020BC3305.3.3,BC3305.3.6 no site-specific formwork design drawings present per BC3301.7.respondent failed to present site-specific formwork drawing during ceu inspection on 7/30/2020.upon review of submitted form-Nothing owed — awaiting certificate of correction
ECB09/02/2020AC28-104.7.7 BC107,BC1613,BC1604 inadequate design document/drawings. Per ceu audit,upon review construction documents signed & sealed by kemba walcott,pe,from kle consulting engineering pllc,the constructionNothing owed — awaiting certificate of correction
ECB07/30/2020BC1704.1.2 based on ceu site visit & inspection,& the findings of ceu audit,the respondent failed to perform tr-1 special inspection duties 1 special inspector duties.special inspection non-compliance items incNothing owed — awaiting certificate of correction
ECB11/27/2019Permit holdeer filed to ensure workers attend pre shift safety meeting.note:at the time of my inspection of a propose 5STORY building at foundation phase,i requested the pre shift safety log and non was providNothing owed — awaiting certificate of correction
ECB11/27/2019Failure to ensure and maintain safety equipment measures and temporary construction equipment.note:at the time of my inspection of a proposed 5STORY building at foundation phase.i observed a work with one leg oNothing owed — awaiting certificate of correction
ECB08/17/2018Job site fence not constructed or maintained pursuant to subsection. Noted: building was demolished to grade, between adjoining properties construction fence was removed leaving the property unprotected.thereNothing owed — awaiting certificate of correction
Old · issued 3+ years ago and still listed by DOB; nothing on the city's records either way
DOB07/12/2019The boro commissioner of the department of buildings city of new york, has revoked permit #421436743-01 pl and ordered all plumbing work stopped except to make site safe. Construction work is approx 20% complete.Issued 2019; DOB's record still lists it as active
DOB07/09/2019Boro commissioner has ordered work stopped for # 421436743 d ue to general contractor withdrawalIssued 2019; DOB's record still lists it as active