← Back
Two family brick
25-41 45 STREET
QUEENS · BIN 4012786
💬 Discuss this project
1920Year Built
2Stories
B1Building Class
R5Zoning
2,656 sfGross Floor Area
2Units
Two family brick · 1,900 sf lot · 1.4 FAR built · Flood zone X
Locations of Work
Plumbing
Cellar2p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CARUSONE & CHERRES ARCHITECTS, LLC307/25/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AB WORKS PROCESSING303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CATMAN PLUMBING INCPlumbing207/08/2026
Building Lifecycle
All (20)Filed (3)Permit Issued (2)Inspection (3)Special Inspection (12)
02/27/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/16/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/16/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/12/2024
Permit issued — Plumbing
Q00271843-I1-PL
08/08/2024
Special inspection requirement — Energy Code Compliance Inspections
JORGE CHERRES
08/08/2024
Special inspection requirement — HVAC and service water heating system controls
JORGE CHERRES
08/08/2024
Special inspection requirement — HVAC insulation and sealing
JORGE CHERRES
08/08/2024
Special inspection requirement — HVAC and service water heating equipment
JORGE CHERRES
07/25/2024
Filed — Alteration
PROPOSED CELLAR RENOVATION OF EXISTING 2 FAMILY DWELLING INCLUDING A RESTRICTIVE DECLARATION FILED FOR 3 FIXTURE BATHROOM USED IN CONJUNCTION WITH THE 1ST FLOOR DWELLING UNIT AS PER PLANS. IN CONJUNCTION WITH DOB # 421907565
Q00271843-P2
07/16/2024
Special inspection requirement — HVAC and service water heating system controls
JORGE CHERRES
07/16/2024
Special inspection requirement — Energy Code Compliance Inspections
JORGE CHERRES
07/16/2024
Special inspection requirement — HVAC and service water heating equipment
JORGE CHERRES
07/16/2024
Special inspection requirement — HVAC insulation and sealing
JORGE CHERRES
11/01/2023
Permit issued — Plumbing
Q00271843-I1-PL
08/03/2023
Filed — Alteration
PROPOSED CELLAR RENOVATION OF EXISTING 2 FAMILY DWELLING INCLUDING A RESTRICTIVE DECLARATION FILED FOR 3 FIXTURE BATHROOM USED IN CONJUNCTION WITH THE 1ST FLOOR DWELLING UNIT AS PER PLANS. IN CONJUNCTION WITH DOB # 421907565
Q00271843-P1
08/03/2023
Special inspection requirement — Energy Code Compliance Inspections
JORGE CHERRES
08/03/2023
Special inspection requirement — HVAC and service water heating system controls
JORGE CHERRES
08/03/2023
Special inspection requirement — HVAC insulation and sealing
JORGE CHERRES
08/03/2023
Special inspection requirement — HVAC and service water heating equipment
JORGE CHERRES
08/03/2022
Filed — Alteration
PROPOSED CELLAR RENOVATION OF EXISTING 2 FAMILY DWELLING INCLUDING A RESTRICTIVE DECLARATION FILED FOR 3 FIXTURE BATHROOM USED IN CONJUNCTION WITH THE 1ST FLOOR DWELLING UNIT AS PER PLANS. IN CONJUNCTION WITH DOB # 421907565
Q00271843-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCATMAN PLUMBING INC12/12/2024
DOB NOWPlumbingPermit IssuedCATMAN PLUMBING INC11/01/2023
BISOTISSUEDDIAN FA LIN INC07/28/2023
1 project · most recent 07/25/2024
Water/Sanitary
FiledStatusContractorScope
07/25/2024Permit IssuedCATMAN PLUMBING INCWater/Sanitary
1 project · most recent 11/14/2023
General Wiring
FiledStatusContractorScope
11/14/2023Permit IssuedHV ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/27/2026Pass-Final General Construction Non-Directive 14PassView ↗
12/16/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/16/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
08/08/2024Energy Code Compliance InspectionsJORGE CHERRESprogress
08/08/2024HVAC and service water heating system controls JORGE CHERRESenergy_progress
08/08/2024HVAC insulation and sealing JORGE CHERRESenergy_progress
08/08/2024HVAC and service water heating equipment JORGE CHERRESenergy_progress
07/16/2024HVAC and service water heating system controls JORGE CHERRESenergy_progress
07/16/2024Energy Code Compliance InspectionsJORGE CHERRESprogress
07/16/2024HVAC and service water heating equipment JORGE CHERRESenergy_progress
07/16/2024HVAC insulation and sealing JORGE CHERRESenergy_progress
08/03/2023Energy Code Compliance InspectionsJORGE CHERRESprogress
08/03/2023HVAC and service water heating system controls JORGE CHERRESenergy_progress
08/03/2023HVAC insulation and sealing JORGE CHERRESenergy_progress
08/03/2023HVAC and service water heating equipment JORGE CHERRESenergy_progress
▾Documents — 39 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch - Plumbing5
08/21/2026Q00271843-P2Request digital key ↗
08/21/2026Q00271843-P3Request digital key ↗
08/21/2026Q00271843-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION5
05/07/2025421907565Open ↗
02/11/2025421907565Open ↗
12/30/2022421907565Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION1
10/16/2023421907565Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWRestrictive Declaration/Easement 14
08/13/2026Q00271843-I1Open ↗
08/13/2026Q00271843-P1Open ↗
08/13/2026Q00271843-P3Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026Q00271843-P3Open ↗
09/01/2026Q00271843-P3Open ↗
08/25/2026Q00271843-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/21/2026Q00271843-P3Open ↗
08/21/2026Q00271843-P2Open ↗
08/21/2026Q00271843-P1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
10/16/2023421907565Open ↗
11/20/2019421907565Open ↗
▸Safety & Tenant Protection5
▸DOB NOWTenant Protection Plan3
08/13/2026Q00271843-P2Open ↗
08/13/2026Q00271843-P3Open ↗
08/13/2026Q00271843-I1Open ↗
▸BISSTREET TREE CHECKLIST1
11/20/2019421907565Open ↗
▸BISTenant Protection Plan and Notes1
11/20/2019421907565Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/08/2020421907565Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/16/2023421907565Open ↗
11/20/2019421907565Open ↗
▸Approvals, Objections & Sign-offs1
▸BISLETTERS - SUPPORTING DOCUMENTATION1
11/20/2019421907565Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
11/20/2019421907565Open ↗
▸Filing & Intake Forms2
▸BISBOROUGH INTAKE FORM1
10/16/2023421907565Open ↗
▸BISEFILING COVER SHEET1
11/20/2019421907565Open ↗