HPD06/10/2020§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
HPD06/08/2020§ 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING LOCATED AT APT 2FL, 2nd STORY, APARTMENT AT EAST
HPD06/08/2020§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... WEST WALL IN THE BATHROOM (APPROX. 3 SQFT) LOCATED AT APT 2FL, 2nd STORY, APARTMENT AT EAST ORIGINAL VIOLATION 13691163 ISSUED 08-JUN-20 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE ''''27-2017.3a(3)(a) or (b).
HPD06/08/2020§ 27-2005 admin. Code: repair the broken or defective plastered surfaces and paint in uniform color south wall, 1ST story , public hall
HPD06/08/2020§ 27-2005, 2007 admin. Code: remove all encumbrances consisting of household items, 2ND and 3RD stories, public hall stairs
ECB07/09/2011Operation of a pa w/o current c/o in that at time of inspection there were approx 85 patrons in 1ST flr bar. No pa on file. Remedy: obtain apa c/o.Nothing owed — awaiting certificate of correction
ECB04/06/2011Work w/o permit. Work noted: 1) install wood shoring in boiler room cellar level 2) new metal duct system, full height partition for office in cellar level. 3)new illuminated sign at front of premises.4)installNothing owed — awaiting certificate of correction
ECB04/06/2011Failure to maintain bldg in code-compliant manner. Failure to provide non-combustible (procendrum) curtain per BC410.3.5;27-546. Remedy: comply w/code.Nothing owed — awaiting certificate of correction
ECB04/06/2011Failure to maintain in code-compliant manner: no fire stopping per BC712.3;27-345 in cellar and boiler room. Remedy: provide/maintain fire stopping.Nothing owed — awaiting certificate of correction
ECB04/06/2011Failure to provide unobstructed exit passageway. Noted: exit passageway 1ST flr front obstructed by curtain. Remedy: remove obstruction forthwith.Nothing owed — awaiting certificate of correction
ECB04/06/2011Sec. BC1008.1.2.2 failure to comply w/direction of swing noted: egressexit 1 door at 1ST flr lounge. Swing against the direction of egress travel. Remedy: comply w/direction of swing.Nothing owed — awaiting certificate of correction
ECB03/31/2011Occupany contrary to that allowed by bldg dept records illegal occupancy noted:1-cellar occupied as a kitchen and office.2-rear yard equipped & arranged as a part restaurant.rem:discontinue illegal occupany orNothing owed — awaiting certificate of correction
Old · issued 3+ years ago and still listed by DOB; nothing on the city's records either way
DOB08/17/2017Construction: other (DOB violation)Issued 2017; DOB's record still lists it as active