← Back
One story - permanent living quarter
25-80 49 STREET
QUEENS · BIN 4013996
💬 Discuss this project
1950Year Built
1Stories
A2Building Class
R5Zoning
1,584 sfGross Floor Area
1Units
One story - permanent living quarter · 2,450 sf lot · 0.65 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MURRAY ENGINEERING PC110/29/2021
LOADINGDOCK5 ARCHITECTURE PLLC310/20/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EPAC BUILDING CONSULTING INC803/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MURRAY ENGINEERING PC1434110/29/2021
Building Lifecycle
All (32)Filed (4)Objection (4)Special Inspection (24)
10/29/2021
Filed — Alteration CO
subsequent filing for structural framing.
Q00526327-S3
10/27/2021
Special inspection requirement — Wood – Prefabricated I-Joists
Robert Murray
10/27/2021
Special inspection requirement — Structural Wood Frame
Robert Murray
10/27/2021
Special inspection requirement — Final
Robert Murray
10/27/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Robert Murray
10/27/2021
Special inspection requirement — Masonry
Robert Murray
10/20/2021
Filed — Alteration CO
subsequent filing for structural framing.
Q00526327-S1
10/20/2021
Filed — Alteration CO
subsequent filing for structural framing.
Q00526327-S2
10/12/2021
Special inspection requirement — Energy Code Compliance Inspections
10/12/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
10/08/2021
Special inspection requirement — Heating Systems
10/08/2021
Special inspection requirement — Mechanical Systems
10/08/2021
Special inspection requirement — Final
10/08/2021
Special inspection requirement — Energy Code Compliance Inspections
10/08/2021
Special inspection requirement — HVAC-R and service water heating equipment
10/08/2021
Special inspection requirement — Ventilation and air distribution system
10/08/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
10/08/2021
Special inspection requirement — HVAC-R and service water heating system controls
08/01/2021
Objection raised — Other
08/01/2021
Objection resolved — Addressed
07/16/2021
Objection raised — Zoning
07/16/2021
Objection resolved — Addressed
06/04/2021
Filed — Alteration CO
subsequent filing for structural framing.
Q00526327-I1
05/20/2021
Special inspection requirement — Air barrier - visual inspection
05/20/2021
Special inspection requirement — Fenestration areas
05/20/2021
Special inspection requirement — Fenestration air leakage
05/20/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
05/20/2021
Special inspection requirement — Interior lighting power
05/20/2021
Special inspection requirement — Energy Code Compliance Inspections
05/20/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/20/2021
Special inspection requirement — Masonry
05/20/2021
Special inspection requirement — Insulation placement and R values
Nothing on file for this building.
1 project · most recent 10/29/2021
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/29/2021——Air Conditioning Systems
Cooling
Lg LMU420HHV 42,000 BTU · Vrf Outdoor ×1
1 project · most recent 10/29/2021
Water/Sanitary
FiledStatusContractorScope
10/29/2021——Water/Sanitary
1 project · most recent 10/29/2021
Masonry Wood
FiledStatusContractorScope
10/29/2021——Masonry, Wood
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
10/27/2021Wood – Prefabricated I-JoistsRobert Murrayspecial
10/27/2021Structural Wood FrameRobert Murrayprogress
10/27/2021FinalRobert Murrayprogress
10/27/2021Structural Stability – Alterations of existing buildingsRobert Murrayspecial
10/27/2021MasonryRobert Murrayspecial
10/12/2021Energy Code Compliance Inspections—progress
10/12/2021HVAC-R and service water piping design and insulation—energy_progress
10/08/2021Heating Systems—special
10/08/2021Mechanical Systems—special
10/08/2021Final—progress
10/08/2021Energy Code Compliance Inspections—progress
10/08/2021HVAC-R and service water heating equipment—energy_progress
10/08/2021Ventilation and air distribution system—energy_progress
10/08/2021HVAC-R and service water piping design and insulation—energy_progress
10/08/2021HVAC-R and service water heating system controls—energy_progress
05/20/2021Air barrier - visual inspection—energy_progress
05/20/2021Fenestration areas—energy_progress
05/20/2021Fenestration air leakage—energy_progress
05/20/2021Fenestration and door U-factor and product ratings—energy_progress
05/20/2021Interior lighting power—energy_progress
05/20/2021Energy Code Compliance Inspections—progress
05/20/2021Structural Stability – Alterations of existing buildings—special
05/20/2021Masonry—special
05/20/2021Insulation placement and R values—energy_progress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/27/2026Q00526327-S3Request digital key ↗
08/27/2026Q00526327-S1Request digital key ↗
08/27/2026Q00526327-S2Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/15/2026Q00526327-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/27/2026Q00526327-S3Open ↗
08/27/2026Q00526327-S2Open ↗
08/27/2026Q00526327-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026Q00526327-S3Open ↗
09/01/2026Q00526327-S3Open ↗
09/01/2026Q00526327-S3Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026Q00526327-S3Open ↗
09/01/2026Q00526327-S3Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/15/2026Q00526327-I1Open ↗
▸Other Documents2
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/15/2026Q00526327-I1Open ↗
▸DOB NOWPlot Diagram1
08/15/2026Q00526327-I1Open ↗