← Back
Factory, industrial, semi-fireproof
25 DIVISION PLACE
BROOKLYN · BIN 3069925
💬 Discuss this project
1960Year Built
1Stories
F4Building Class
M1-1Zoning
10,000 sfGross Floor Area
1Units
8 Open Violations 7 unresolved · 1 paperwork only ▸FDNY Report ↗
Factory, industrial, semi-fireproof · Owner of record: EPNER TECHNOLOGY INC · 10,000 sf lot · 1 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingCivilGeneralOther
Roof13p · 2 filings · 20 docs
Floor 111p · 2 filings · 20 docs
Mezzanine11p · 2 filings · 20 docs
Cellar1p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HUGH CHRYSLER ENGINEERING CO LLC605/08/2026
HANSEN ENGINEERING, PC309/13/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HUGH CHRYSLER ENGINEERING803/21/2026
JUST ARCHITECTURE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROCCO'S LANDSCAPING & CONGeneral Contractor303/21/2026
PARAMOUNT PLBG & HTG CORPPlumbing207/08/2026
AURORA P & H CONT INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HUGH CHRYSLER ENGINEERING4251105/08/2026
HANSEN ENGINEERING PC8174710/30/2024
Building Lifecycle
All (86)Filed (9)Permit Issued (4)Violation (33)Inspection (4)Objection (14)Special Inspection (22)
05/08/2026
Filed — Alteration
Replace existing oil boiler with a BTH Ultra 27kW commercial unit.
B01394030-I1
04/28/2026
Special inspection requirement — HVAC-R and service water heating system controls
HUGH CHRYSLER
04/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
HUGH CHRYSLER
04/28/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
HUGH CHRYSLER
04/28/2026
Special inspection requirement — HVAC-R and service water heating equipment
HUGH CHRYSLER
04/28/2026
Special inspection requirement — Heating Systems
HUGH CHRYSLER
11/06/2024
Special inspection requirement — Energy Code Compliance Inspections
HUGH CHRYSLER
11/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
10/30/2024
Filed — Alteration
PROPOSED INSTALL OF NEW GAS FIRED BOILER. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B00812392-P5
10/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
10/30/2024
Special inspection requirement — Energy Code Compliance Inspections
HUGH CHRYSLER
10/23/2024
Objection resolved — Addressed
10/23/2024
Objection resolved — Addressed
10/22/2024
Objection raised — Scope
10/22/2024
Objection raised — Scope
10/18/2024
Filed — Alteration
PROPOSED INSTALL OF NEW GAS FIRED BOILER. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B00812392-P4
10/17/2024
Special inspection requirement — Energy Code Compliance Inspections
HUGH CHRYSLER
10/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
10/04/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/17/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/03/2024
Permit issued — Plumbing
B00812392-I1-PL
07/03/2024
Objection resolved — Addressed
06/06/2024
Special inspection requirement — Energy Code Compliance Inspections
HUGH CHRYSLER
05/10/2024
Objection raised — Scope
05/06/2024
Filed — Alteration
PROPOSED INSTALL OF NEW GAS FIRED BOILER. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B00812392-P3
04/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
03/29/2024
Permit issued — Plumbing
B00812392-I1-PL
11/08/2023
Filed — Alteration
GENERAL CONSTRUCTION TO CLOSE RATED OPENING & REPAIR RATED CEILING AT MECHANICAL ROOM AT FIRST FLOOR.
B00949421-I1
10/17/2023
Special inspection requirement — Final
10/17/2023
Special inspection requirement — Fire-Resistance Rated Construction
09/13/2023
Filed — Alteration
PROPOSED INSTALL OF NEW GAS FIRED BOILER. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B00812392-P2
09/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
08/05/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/13/2023
Objection resolved — Addressed
07/06/2023
Objection raised — Scope
07/05/2023
Objection resolved — Addressed
07/05/2023
Objection resolved — Addressed
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/28/2023
Objection raised — Scope
06/28/2023
Objection raised — Scope
06/27/2023
Filed — Alteration
PROPOSED INSTALL OF NEW GAS FIRED BOILER. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B00812392-S1
06/27/2023
Special inspection requirement — Heating Systems
Ryan Hansen
06/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
05/11/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/13/2023
Permit issued — Structural
B00821470-I1-ST
04/11/2023
Permit issued — Plumbing
B00812392-I1-PL
02/01/2023
Objection raised — Scope
02/01/2023
Objection resolved — Addressed
01/31/2023
Filed — Alteration
PROPOSED INSTALL OF NEW GAS FIRED BOILER. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B00812392-I1
01/31/2023
Filed — Alteration
B00821470-I1
01/31/2023
Special inspection requirement — Masonry
Ryan Hansen
01/31/2023
Special inspection requirement — Final
Ryan Hansen
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAURORA P & H CONT INC09/03/2024
DOB NOWPlumbingPermit IssuedPARAMOUNT PLBG & HTG CORP03/29/2024
DOB NOWStructuralPermit IssuedROCCO'S LANDSCAPING & CON04/13/2023
DOB NOWPlumbingPermit IssuedPARAMOUNT PLBG & HTG CORP04/11/2023
BISOTISSUEDSKOWRON & COMPANY INC09/04/2008
BISBLISSUEDLEONARD R. SIBRIZZI08/03/2006
BISBLISSUEDLEONARD SIBRIZZI03/30/2005
BISBLISSUEDMETRO FUEL OIL CORP07/07/1997
BISPLISSUEDAL HAAG & SON PLBG & HTG10/28/1996
BISOTISSUEDA. INTERNATIONAL LTD.01/04/1996
BISPLISSUEDNONE04/19/1995
BIS—ISSUEDL&B CONST INC07/21/1994
1 project · most recent 10/30/2024
Gas
FiledStatusContractorScope
10/30/2024Permit IssuedAURORA P & H CONT INCGas
1 project · most recent 08/25/2022
FiledStatusContractorScope
08/25/2022CompleteWILLDAN ELECTRICAL OF NY—
1 project · most recent 01/31/2023
Masonry
FiledStatusContractorScope
01/31/2023Permit IssuedROCCO'S LANDSCAPING & CONMasonry
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/04/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/17/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/05/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/11/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
04/28/2026HVAC-R and service water heating system controlsHUGH CHRYSLERenergy_progress
04/28/2026Fire-Resistant Penetrations and JointsHUGH CHRYSLERspecial
04/28/2026HVAC-R and service water piping design and insulationHUGH CHRYSLERenergy_progress
04/28/2026HVAC-R and service water heating equipmentHUGH CHRYSLERenergy_progress
04/28/2026Heating SystemsHUGH CHRYSLERspecial
11/06/2024Energy Code Compliance InspectionsHUGH CHRYSLERprogress
11/06/2024Fire-Resistant Penetrations and JointsRyan Hansenspecial
10/30/2024Fire-Resistant Penetrations and JointsRyan Hansenspecial
10/30/2024Energy Code Compliance InspectionsHUGH CHRYSLERprogress
10/17/2024Energy Code Compliance InspectionsHUGH CHRYSLERprogress
10/17/2024Fire-Resistant Penetrations and JointsRyan Hansenspecial
06/06/2024Energy Code Compliance InspectionsHUGH CHRYSLERprogress
04/25/2024Fire-Resistant Penetrations and JointsRyan Hansenspecial
10/17/2023Final—progress
10/17/2023Fire-Resistance Rated Construction—progress
09/12/2023Fire-Resistant Penetrations and JointsRyan Hansenspecial
06/27/2023Heating SystemsRyan Hansenspecial
06/27/2023Fire-Resistant Penetrations and JointsRyan Hansenspecial
01/31/2023MasonryRyan Hansenspecial
01/31/2023FinalRyan Hansenprogress
01/31/2023Structural Steel - DetailsRyan Hansenspecial
01/31/2023Structural Stability – Alterations of existing buildingsRyan Hansenspecial
▾Documents — 80 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/27/2026B00812392-P5Request digital key ↗
08/27/2026B00812392-P4Request digital key ↗
08/27/2026B00812392-P2Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
12/11/2017320238097Open ↗
11/09/2010320238097Open ↗
08/28/2008310195008Open ↗
▸BISWORK PERMIT APPLICATION1
09/04/2008310195008Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
12/23/2008310195008Open ↗
▸Seals & Professional Certifications38
▸DOB NOWSpecial Inspector Seal & Signature14
09/04/2026B00812392-S1Open ↗
09/04/2026B00812392-S1Open ↗
09/02/2026B00812392-P5Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/27/2026B00821470-S1Open ↗
08/27/2026B00821470-I1Open ↗
08/27/2026B00812392-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/02/2026B00812392-P5Open ↗
08/31/2026B00821470-I1Open ↗
08/30/2026B01394030-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
11/09/2010320238097Open ↗
08/28/2008310195008Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
11/09/2010320238097Open ↗
08/28/2008310195008Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
11/10/2010320238097Open ↗
08/28/2008310195008Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/27/2026B00821470-S1Open ↗
08/27/2026B00812392-P5Open ↗
08/27/2026B00812392-P4Open ↗
Showing 3 of 10 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
11/10/2010320238097Open ↗
08/28/2008310195008Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/17/2026B01394030-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
07/03/2024301915408Open ↗
06/28/2024301915408Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
07/12/2024301915408Open ↗
02/23/2009310195008Open ↗
02/09/2009310195008Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
11/09/2010320238097Open ↗
08/28/2008310195008Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
06/28/2024301915408Open ↗
11/09/2010320238097Open ↗
02/09/2009310195008Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET2
11/09/2010320238097Open ↗
08/28/2008310195008Open ↗
▸BISBOROUGH INTAKE FORM1
12/11/2017320238097Open ↗