Four families
25 EAST 11 STREET
MANHATTAN · Greenwich Village · BIN 1009290
💬 Discuss this project
1845Year Built
5Stories
C3Building Class
R7-2Zoning
7,698 sfGross Floor Area
4Units
Rent Stabilized13 Open Violations ▸
Four families · Owner of record: 25 EAST 11TH LLC · 2,728 sf lot · 2.82 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction120p · 2 filings · 20 docs
Floor 4Under Construction128p · 2 filings · 20 docs
Floor 3Under Construction121p · 2 filings · 20 docs
Floor 2Under Construction130p · 2 filings · 20 docs
Floor 1Under Construction123p · 2 filings · 20 docs
MezzanineUnder Construction29p · 1 filing · 20 docs
CellarUnder Construction132p · 2 filings · 20 docs
BasementUnder Construction34p · 1 filing · 20 docs
Sub-Basement93p · 1 filing · 20 docs
Site & exteriorUnder Construction40p · 7 filings · 20 docs
Filed — no permit issued2 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CHOSHIELDS STUDIO1109/13/2026
CEPRINE CONSTRUCTION2307/08/2026
SMI CONSTRUCTION907/08/2026
25 EAST 11TH LLC103/22/2026
25 E 11ST LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/07/2019$12.5M—— → —$1,624/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYCCODE6003/21/2026
SYNERGY BUILDING CONSULTANTS803/21/2026
Rigid Structural Design, LLC103/21/2026
LOMBARDO BUILDING CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SMI CONSTRUCTION MANGEMENTGeneral Contractor5807/08/2026
CEPRINE CONSTRUCTION INCGeneral Contractor1208/22/2026
KG SPRINKLER CORPFire Protection407/08/2026
ARCON PLBG SOLUTIONSPlumbing307/08/2026
DONATO PLUMBING, INCPlumbing207/08/2026
TRINCITY ELECTRIC, INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALAN MARGOLIN & ASSOC4233104/15/2026
Building Lifecycle
All (195)Filed (41)Permit Issued (54)Signed Off (12)Violation (44)Inspection (14)Objection (30)
08/21/2026
Permit issued — Supported Scaffold
M01446244-I1-SF
08/20/2026
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01446244-I1
05/11/2026
Objection resolved — Addressed
05/07/2026
Objection raised — Other
05/01/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/29/2026
Violation issued (HPD, open)
A
04/15/2026
Filed — Alteration CO
conversion the building to 1 family house, partial removal of the 2nd floor making it a mezzanine level, and relocation of existing zoning floor area as shown on plans filed herewith.
M00658199-P5
04/08/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/20/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/02/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/19/2025
Permit issued — General Construction
M00658199-I1-GC
12/15/2025
Objection resolved — Addressed
12/12/2025
Objection raised — Admin
12/05/2025
Filed — Alteration CO
conversion the building to 1 family house, partial removal of the 2nd floor making it a mezzanine level, and relocation of existing zoning floor area as shown on plans filed herewith.
M00658199-P4
11/26/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/17/2025
Violation issued (HPD, open)
I
09/12/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00650929-I1
09/12/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/10/2025
Signed off — Alteration
plumbing work associated with the building renovation as shown on plans filed herewith. no change to use, egress, or occupancy.
M00514767-S4
09/10/2025
Signed off — Alteration
plumbing work associated with the building renovation as shown on plans filed herewith. no change to use, egress, or occupancy.
M00514767-S5
09/02/2025
Signed off — Alteration
plumbing work associated with the building renovation as shown on plans filed herewith. no change to use, egress, or occupancy.
M00514767-S6
09/02/2025
Signed off — Alteration
plumbing work associated with the building renovation as shown on plans filed herewith. no change to use, egress, or occupancy.
M00514767-S1
08/29/2025
Signed off — Alteration
plumbing work associated with the building renovation as shown on plans filed herewith. no change to use, egress, or occupancy.
M00514767-S2
08/28/2025
Signed off — Alteration
plumbing work associated with the building renovation as shown on plans filed herewith. no change to use, egress, or occupancy.
M00514767-S7
08/28/2025
Signed off — Alteration
plumbing work associated with the building renovation as shown on plans filed herewith. no change to use, egress, or occupancy.
M00514767-I1
08/12/2025
Filed — Alteration
plumbing work associated with the building renovation as shown on plans filed herewith. no change to use, egress, or occupancy.
M00514767-B1
06/04/2025
Violation issued (HPD, open)
A
05/27/2025
Filed — Alteration CO
conversion the building to 1 family house, partial removal of the 2nd floor making it a mezzanine level, and relocation of existing zoning floor area as shown on plans filed herewith.
M00658199-P3
03/28/2025
Filed — Alteration
plumbing work associated with the building renovation as shown on plans filed herewith. no change to use, egress, or occupancy.
M00514767-A9
03/28/2025
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M08042133-I1
03/28/2025
Signed off — Alteration
Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M08042145-I1
03/19/2025
Permit issued — Plumbing
M00514767-S4-PL
03/07/2025
Permit issued — Structural
M00514767-S2-ST
03/05/2025
Permit issued — General Construction
M00514767-I1-GC
03/05/2025
Permit issued — Structural
M00514767-S1-ST
03/05/2025
Permit issued — Construction Fence
M00650929-I1-FN
03/04/2025
Permit issued — Mechanical Systems
M00514767-S7-MS
02/18/2025
Permit issued — Structural
M00514767-S2-ST
01/21/2025
Permit issued — General Construction
M00514767-I1-GC
12/17/2024
Filed — Alteration
plumbing work associated with the building renovation as shown on plans filed herewith. no change to use, egress, or occupancy.
M00514767-A7
12/17/2024
Filed — Alteration
plumbing work associated with the building renovation as shown on plans filed herewith. no change to use, egress, or occupancy.
M00514767-A6
12/17/2024
Filed — Alteration
plumbing work associated with the building renovation as shown on plans filed herewith. no change to use, egress, or occupancy.
M00514767-A8
11/22/2024
Violation issued (HPD, open)
I
11/01/2024
Signed off — Alteration
Installation and use of the temporary working platform as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00950563-I1
10/16/2024
Permit issued — Protection and Mechanical Methods
M00950563-I1-PMM
10/07/2024
Filed — Alteration
plumbing work associated with the building renovation as shown on plans filed herewith. no change to use, egress, or occupancy.
M00514767-A5
10/03/2024
Signed off — Alteration
M08042127-I1
07/26/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/24/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/28/2024
Permit issued — Sprinklers
M00514767-S5-EW-SP
04/01/2024
Violation issued (HPD, open)
A
03/20/2024
Permit issued — Structural
M00514767-S1-ST
03/19/2024
Permit issued — Construction Fence
M00650929-I1-FN
03/19/2024
Permit issued — Plumbing
M00514767-S4-PL
03/18/2024
Permit issued — Mechanical Systems
M00514767-S7-MS
03/15/2024
Filed — Alteration
plumbing work associated with the building renovation as shown on plans filed herewith. no change to use, egress, or occupancy.
M00514767-A3
03/13/2024
Filed — Alteration
plumbing work associated with the building renovation as shown on plans filed herewith. no change to use, egress, or occupancy.
M00514767-A4
03/08/2024
Objection raised — Scope
03/08/2024
Objection resolved — Addressed
Latest 60 of 195 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedCEPRINE CONSTRUCTION INC08/21/2026
DOB NOWGeneral ConstructionPermit IssuedSMI CONSTRUCTION MANGEMEN12/19/2025
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC03/19/2025
DOB NOWStructuralSigned-offSMI CONSTRUCTION MANGEMEN03/07/2025
DOB NOWGeneral ConstructionSigned-offSMI CONSTRUCTION MANGEMEN03/05/2025
DOB NOWStructuralSigned-offSMI CONSTRUCTION MANGEMEN03/05/2025
DOB NOWConstruction FenceSigned-offSMI CONSTRUCTION MANGEMEN03/05/2025
DOB NOWMechanical SystemsSigned-offSMI CONSTRUCTION MANGEMEN03/04/2025
DOB NOWStructuralSigned-offSMI CONSTRUCTION MANGEMEN02/18/2025
DOB NOWGeneral ConstructionSigned-offSMI CONSTRUCTION MANGEMEN01/21/2025
DOB NOWProtection and Mechanical MethodsSigned-offCEPRINE CONSTRUCTION INC10/16/2024
DOB NOWSprinklersSigned-offH M SPRINKLER INC06/28/2024
DOB NOWStructuralSigned-offSMI CONSTRUCTION MANGEMEN03/20/2024
DOB NOWConstruction FenceSigned-offSMI CONSTRUCTION MANGEMEN03/19/2024
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC03/19/2024
DOB NOWMechanical SystemsSigned-offSMI CONSTRUCTION MANGEMEN03/18/2024
DOB NOWStructuralSigned-offSMI CONSTRUCTION MANGEMEN02/20/2024
DOB NOWPlumbingSigned-offARCON PLBG SOLUTIONS12/28/2023
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC12/15/2023
DOB NOWSupported ScaffoldSigned-offCEPRINE CONSTRUCTION INC12/06/2023
DOB NOWGeneral ConstructionSigned-offSMI CONSTRUCTION MANGEMEN11/29/2023
DOB NOWProtection and Mechanical MethodsSigned-offCEPRINE CONSTRUCTION INC10/31/2023
DOB NOWGeneral ConstructionPermit IssuedSMI CONSTRUCTION MANGEMEN07/31/2023
DOB NOWSprinklersSigned-offH M SPRINKLER INC06/16/2023
DOB NOWStructuralSigned-offSMI CONSTRUCTION MANGEMEN03/02/2023
DOB NOWStructuralSigned-offSMI CONSTRUCTION MANGEMEN03/01/2023
DOB NOWConstruction FenceSigned-offSMI CONSTRUCTION MANGEMEN03/01/2023
DOB NOWSupport of ExcavationSigned-offSMI CONSTRUCTION MANGEMEN02/01/2023
DOB NOWStructuralSigned-offSMI CONSTRUCTION MANGEMEN01/17/2023
DOB NOWSprinklersSigned-offH M SPRINKLER INC01/13/2023
DOB NOWPlumbingSigned-offARCON PLBG SOLUTIONS01/03/2023
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC12/29/2022
DOB NOWGeneral ConstructionSigned-offSMI CONSTRUCTION MANGEMEN12/09/2022
DOB NOWStructuralSigned-offSMI CONSTRUCTION MANGEMEN12/09/2022
DOB NOWProtection and Mechanical MethodsSigned-offCEPRINE CONSTRUCTION INC12/08/2022
DOB NOWSupported ScaffoldSigned-offCEPRINE CONSTRUCTION INC12/03/2022
DOB NOWSupport of ExcavationSigned-offSMI CONSTRUCTION MANGEMEN09/26/2022
DOB NOWGeneral ConstructionPermit IssuedSMI CONSTRUCTION MANGEMEN08/19/2022
DOB NOWStructuralSigned-offSMI CONSTRUCTION MANGEMEN07/28/2022
DOB NOWGeneral ConstructionSigned-offSMI CONSTRUCTION MANGEMEN07/28/2022
+ 11 more permits on file
4 projects · most recent 12/16/2025
General Wiring
FiledStatusContractorScope
12/16/2025CompleteJOSEPH SGROI & SONS, INC.General Wiring
09/30/2025CompleteJOSEPH SGROI & SONS, INC.1 meters, 1 new_meters
11/20/2023CompleteTRINCITY ELECTRIC, INCGeneral Wiring
02/14/2022CompleteBOROWIDE ELECT'L CONTR'S—
2 projects
Sidewalk Shed Scaffold
FiledStatusContractorScope
———Sidewalk Shed
———Scaffold
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
05/01/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/08/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/20/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/06/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/02/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/26/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/12/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/26/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/24/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/15/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/25/2024Pass-Final PL - UndergroundPassView ↗
12/19/2023Pass-Final PL - UndergroundPassView ↗
11/24/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/27/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 79
DateRequirementInspectorRole
05/19/2026Chimneys and ventsYoung Suhspecial
04/14/2026Chimneys and ventsYoung Suhspecial
12/01/2025Chimneys and ventsYoung Suhspecial
07/29/2025Fire-Resistant Penetrations and JointsYoung Suhspecial
04/24/2025Chimneys and ventsYoung Suhspecial
03/26/2025Fire-Resistant Penetrations and JointsYoung Suhspecial
12/26/2024Sprinkler SystemsYoung Suhspecial
12/26/2024Fire-Resistant Penetrations and JointsYoung Suhspecial
12/03/2024Sprinkler SystemsYoung Suhspecial
12/03/2024FinalYoung Suhprogress
12/03/2024Mechanical SystemsYoung Suhspecial
12/03/2024Fire-Resistant Penetrations and JointsYoung Suhspecial
12/03/2024Fire-Resistant Penetrations and JointsYoung Suhspecial
12/03/2024Fire-Resistant Penetrations and JointsYoung Suhspecial
08/02/2024Sprinkler SystemsYoung Suhspecial
08/02/2024Fire-Resistant Penetrations and JointsYoung Suhspecial
03/07/2024Fire-Resistant Penetrations and JointsYoung Suhspecial
09/15/2023Post-installed AnchorsYoung Suhspecial
09/15/2023Structural Steel - DetailsYoung Suhspecial
09/15/2023MasonryYoung Suhspecial
09/15/2023Structural Stability – Alterations of existing buildingsYoung Suhspecial
09/15/2023Concrete - Cast-In-PlaceYoung Suhspecial
09/15/2023FinalYoung Suhprogress
09/15/2023Structural Steel - WeldingYoung Suhspecial
09/15/2023Structural Steel - High Strength BoltingYoung Suhspecial
Latest 25 of 79.
▾Documents — 217 on file (BIS + DOB NOW)
▸Plans & Drawings41
▸DOB NOWPlans/Sketch41
09/03/2026M00650929-P1Request digital key ↗
09/03/2026M00650929-I1Request digital key ↗
09/01/2026M08042145-I1Request digital key ↗
Showing 3 of 41 on file for this type
▸Applications & Permits28
▸DOB NOWLPC Approval/Permit26
08/17/2026M00658199-I1Open ↗
08/17/2026M00658199-P3Open ↗
08/17/2026M00658199-P2Open ↗
Showing 3 of 26 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION1
10/27/2017140711308Open ↗
▸BISWORK PERMIT APPLICATION1
10/27/2017140711308Open ↗
▸Seals & Professional Certifications79
▸DOB NOWDPL-1: Design Professional Seal & Signature41
09/03/2026M00650929-P1Open ↗
09/03/2026M00650929-I1Open ↗
09/01/2026M08042145-I1Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature24
09/30/2026M00514767-P8Open ↗
09/01/2026M00514767-A9Open ↗
09/01/2026M00514767-A5Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/30/2026M00514767-P8Open ↗
09/01/2026M00514767-S1Open ↗
08/30/2026M00514767-I1Open ↗
Showing 3 of 10 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/27/2017140711308Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/27/2017140711308Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/27/2017140711308Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
03/18/2019140711308Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
10/27/2017140711308Open ↗
▸Safety & Tenant Protection10
▸DOB NOWStreet Tree Checklist6
08/17/2026M00658199-P3Open ↗
08/17/2026M00658199-I1Open ↗
08/17/2026M00658199-P1Open ↗
Showing 3 of 6 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES1
10/27/2017140711308Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026M00658199-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026M00658199-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026M00658199-I1Open ↗
▸Environmental & Asbestos31
▸DOB NOWDEP ACP-5: Asbestos Assessment Report29
08/17/2026M00658199-P3Open ↗
08/17/2026M00658199-I1Open ↗
08/17/2026M00658199-P2Open ↗
Showing 3 of 29 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/27/2017140711308Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M00514767-S7Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/27/2017140711308Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/18/2019140711308Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
10/27/2017140711308Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY1
10/27/2017140711308Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
03/18/2019140711308Open ↗
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION2
03/18/2019140711308Open ↗
03/18/2019140711308Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
10/25/2022140711308Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/18/2019140711308Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
03/18/2019140711308Open ↗
10/27/2017140711308Open ↗
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET1
10/27/2017140711308Open ↗
▸BISADDITIONAL INFORMATION1
02/09/2018140711308Open ↗
▸BISBOROUGH INTAKE FORM1
03/18/2019140711308Open ↗
▸Other Documents13
▸DOB NOWProperty Ownership Certification6
08/17/2026M00658199-I1Open ↗
08/17/2026M00658199-P1Open ↗
08/17/2026M00658199-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProof of Historic Building6
08/17/2026M00658199-I1Open ↗
08/17/2026M00658199-P1Open ↗
08/17/2026M00658199-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWFinal Survey1
08/13/2026M00658199-I1Open ↗