Two family frame
25 FONDA PLACE
STATEN ISLAND · Annadale-Huguenot-Prince's Bay-Woodrow · BIN 5085229
💬 Discuss this project
1986Year Built
2Stories
B2Building Class
R3XZoning
3,082 sfGross Floor Area
2Units
Two family frame · 9,540 sf lot · 0.32 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof1p · 1 filing · 7 docs
Floor 21 filing · 20 docs
Floor 11 filing · 20 docs
Basement1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MCNEILL ARCHITECTURE512/16/2025
C&P DESIGN CONSULTANTS204/28/2025
NY BUILDING ASSOCIATES INC102/19/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
APRILE BONAMO FILING REP703/21/2026
S R SOLAR DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
D.R. CONTRACTINGGeneral Contractor404/09/2026
LONG ISLAND POWER SOLUTIOGeneral Contractor203/21/2026
BLUEWATER PLBG& HTG INCPlumbing107/08/2026
KCM PLUMBING & HEATING COPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738812/16/2025
NKM ENGINEERING PLLC6244102/19/2024
Building Lifecycle
All (95)Filed (7)Permit Issued (7)Signed Off (3)Inspection (8)Objection (40)Special Inspection (30)
07/06/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
Construction of a new 2nd floor rear addition and interior alterations. Addition is approximately 306 square feet.
S00850550-I1
03/19/2026
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
03/19/2026
Special inspection requirement — Mechanical Systems
anthony santoro
03/19/2026
Special inspection requirement — Air barrier continuity plan testing
anthony santoro
03/19/2026
Special inspection requirement — Permanent certificate
anthony santoro
03/19/2026
Special inspection requirement — Demolition
anthony santoro
03/19/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
03/19/2026
Special inspection requirement — Insulation placement and R values
anthony santoro
03/19/2026
Special inspection requirement — Lighting controls
anthony santoro
03/19/2026
Special inspection requirement — Fenestration air leakage
anthony santoro
03/19/2026
Special inspection requirement — Air barrier — testing
anthony santoro
03/19/2026
Special inspection requirement — Fenestration areas
anthony santoro
03/19/2026
Special inspection requirement — Air barrier - visual inspection
anthony santoro
03/19/2026
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
03/19/2026
Special inspection requirement — Ventilation and air distribution system
anthony santoro
03/19/2026
Special inspection requirement — Footing and Foundation
anthony santoro
03/19/2026
Special inspection requirement — Final
anthony santoro
03/19/2026
Special inspection requirement — Designated Seismic System
anthony santoro
03/19/2026
Special inspection requirement — Interior lighting power
anthony santoro
03/19/2026
Special inspection requirement — Structural Steel - Welding
anthony santoro
03/19/2026
Special inspection requirement — Lowest Floor Elevation
anthony santoro
03/19/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
12/16/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Construction of a new 2nd floor rear addition and interior alterations. Addition is approximately 306 square feet.
S00850550-P7
12/15/2025
Special inspection requirement — Designated Seismic System
12/12/2025
Special inspection requirement — Final
anthony santoro
12/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
12/12/2025
Special inspection requirement — Structural Steel - Welding
anthony santoro
12/12/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
12/12/2025
Special inspection requirement — Interior lighting power
anthony santoro
12/12/2025
Special inspection requirement — Air barrier continuity plan testing
anthony santoro
12/12/2025
Special inspection requirement — Insulation placement and R values
anthony santoro
12/12/2025
Special inspection requirement — Mechanical Systems
anthony santoro
12/02/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Construction of a new 2nd floor rear addition and interior alterations. Addition is approximately 306 square feet.
S00850550-P6
10/09/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/10/2025
Objection resolved — Addressed
09/08/2025
Objection raised — Other
08/22/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Construction of a new 2nd floor rear addition and interior alterations. Addition is approximately 306 square feet.
S00850550-P4
08/14/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
Construction of a new 2nd floor rear addition and interior alterations. Addition is approximately 306 square feet.
S00850550-S1
05/13/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/28/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Construction of a new 2nd floor rear addition and interior alterations. Addition is approximately 306 square feet.
S00850550-P3
04/21/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
02/19/2025
Permit issued — Plumbing
S00850550-S1-PL
11/15/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/22/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/22/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/24/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/29/2024
Permit issued — Plumbing
S00850550-S1-PL
04/25/2024
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK.
S01003004-I1
04/22/2024
Permit issued — Mechanical Systems
S00850550-I1-FO
04/17/2024
Permit issued — Structural
S00850550-I1-ST
04/12/2024
Permit issued — General Construction
S00850550-I1-MS
04/11/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
Construction of a new 2nd floor rear addition and interior alterations. Addition is approximately 306 square feet.
S00850550-S1
03/28/2024
Permit issued — Solar
S01003004-I1-SL
03/18/2024
Objection resolved — Addressed
03/18/2024
Objection resolved — Addressed
03/18/2024
Objection resolved — Addressed
03/18/2024
Objection resolved — Addressed
02/26/2024
Objection raised — Other
02/26/2024
Objection raised — Other
02/26/2024
Objection raised — Other
Latest 60 of 95 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offKCM PLUMBING & HEATING CO02/19/2025
DOB NOWPlumbingSigned-offBLUEWATER PLBG& HTG INC05/29/2024
DOB NOWMechanical SystemsSigned-offD.R. CONTRACTING04/22/2024
DOB NOWStructuralSigned-offD.R. CONTRACTING04/17/2024
DOB NOWGeneral ConstructionSigned-offD.R. CONTRACTING04/12/2024
DOB NOWSolarSigned-offLONG ISLAND POWER SOLUTIO03/28/2024
DOB NOWMechanical SystemsPermit IssuedD.R. CONTRACTING08/31/2023
1 project · most recent 12/16/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
12/16/2025Signed-offD.R. CONTRACTINGHeating and Air Conditioning Systems
Heat / Cool
U.S. Boiler Company X-204 X-203 400,000 BTU · Furnace ×6
Goodman ARUF31B14AC 3 tons · Fan Coil Indoor ×3
Nordyne B6EMMX36K-B 3 tons · Fan Coil Indoor ×3
1 project · most recent 12/16/2025
Gas Water/Sanitary
FiledStatusContractorScope
12/16/2025Signed-off1215 CORP DBA KCM PLBG &Gas, Water/Sanitary
2 projects · most recent 06/04/2024
General Wiring
FiledStatusContractorScope
06/04/2024CompleteRIDGE ELECTRIC CORP.General Wiring
02/16/2024CompleteCATIZONE ELECTRICAL INC—
1 project · most recent 12/16/2025
Wood
FiledStatusContractorScope
12/16/2025Signed-off1215 CORP DBA KCM PLBG &Wood
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
10/09/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/13/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/21/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/15/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/22/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/22/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/24/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/07/2024Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 119
DateRequirementInspectorRole
03/19/2026Air barrier continuity plan testinganthony santoroenergy_progress
03/19/2026Air barrier - visual inspectionanthony santoroenergy_progress
03/19/2026HVAC-R and service water heating system controlsanthony santoroenergy_progress
03/19/2026Ventilation and air distribution systemanthony santoroenergy_progress
03/19/2026Fenestration areasanthony santoroenergy_progress
03/19/2026Permanent certificateanthony santoroenergy_progress
03/19/2026Air barrier — testing anthony santoroenergy_progress
03/19/2026Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
03/19/2026HVAC-R and service water heating equipmentanthony santoroenergy_progress
03/19/2026Fenestration air leakageanthony santoroenergy_progress
03/19/2026Structural Steel - Weldinganthony santorospecial
03/19/2026Designated Seismic Systemanthony santorospecial
03/19/2026Demolitionanthony santorospecial
03/19/2026Mechanical Systemsanthony santorospecial
03/19/2026Footing and Foundationanthony santoroprogress
03/19/2026Lowest Floor Elevationanthony santoroprogress
03/19/2026Finalanthony santoroprogress
03/19/2026HVAC-R and service water piping design and insulationanthony santoroenergy_progress
03/19/2026Insulation placement and R valuesanthony santoroenergy_progress
03/19/2026Interior lighting poweranthony santoroenergy_progress
03/19/2026Lighting controlsanthony santoroenergy_progress
12/15/2025Designated Seismic System—special
12/12/2025Air barrier - visual inspectionanthony santoroenergy_progress
12/12/2025HVAC-R and service water heating equipmentanthony santoroenergy_progress
12/12/2025Permanent certificateanthony santoroenergy_progress
Latest 25 of 119.
▾Documents — 101 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/21/2026S01003004-I1Request digital key ↗
08/21/2026S00850550-P3Request digital key ↗
08/21/2026S00850550-P7Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram5
08/21/2026S00850550-P7Open ↗
08/21/2026S00850550-P6Open ↗
08/21/2026S00850550-P5Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/21/2026S00850550-P7Open ↗
08/21/2026S00850550-P6Open ↗
08/21/2026S00850550-P5Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026S00850550-I1Open ↗
▸Seals & Professional Certifications63
▸DOB NOWProgress Inspector Seal & Signature40
09/03/2026S00850550-P6Open ↗
09/03/2026S00850550-P6Open ↗
09/03/2026S00850550-P6Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/01/2026S00850550-P6Open ↗
09/01/2026S00850550-P6Open ↗
09/01/2026S00850550-P3Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/21/2026S00850550-P7Open ↗
08/21/2026S00850550-P6Open ↗
08/21/2026S00850550-P5Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/14/2026S00850550-I1Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/14/2026S00850550-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01003004-I1Open ↗
▸Other Documents16
▸DOB NOWSite Survey: Initial5
08/21/2026S00850550-P7Open ↗
08/21/2026S00850550-P6Open ↗
08/21/2026S00850550-P5Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/21/2026S00850550-P7Open ↗
08/21/2026S00850550-P6Open ↗
08/21/2026S00850550-P5Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/21/2026S00850550-P7Open ↗
08/21/2026S00850550-P6Open ↗
08/21/2026S00850550-P5Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFinal Survey1
08/14/2026S00850550-I1Open ↗