← Back
BuildNYC
Miscellaneous asylum / home
25 LAWTON STREET
BROOKLYN · BIN 3347834
💬 Discuss this project
1994Year Built
3Stories
N9Building Class
R6Zoning
20,625 sfGross Floor Area
0Units
14 Active Violations 13 unresolved · 1 paperwork only 1 old, status unconfirmed ▸FDNY Report ↗
Miscellaneous asylum / home · Owner of record: Icl Real Property Holding · 11,600 sf lot · 1.78 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof2 filings
Floor 32 filings
Floor 22 filings
Floor 14 filings
Cellar4 filings
Site & exterior1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ICL1607/08/2026
Camale Realty703/22/2026
Icl Real Property Holding303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EQ Architecture904/28/2026
FL&M Engineering Design & Inspection110/10/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Planhandlers703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Tri Borough ScaffoldingScaffold603/21/2026
M. Early Plumbing & HeatingPlumbing607/08/2026
FPS ContractingGeneral Contractor304/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Metric Consulting and Ins1803904/28/2026
Vibranalysis Inc., Dba VT6864112/12/2023
Building Lifecycle
All (167)Filed (10)Permit Issued (6)Signed Off (2)Violation (100)Inspection (6)Special Inspection (29)
09/23/2026
Signed off — Alteration
Install new AC equipment in public areas on first floor & with some additional ductwork; install new kitchen & bathroom fans to replace existing; new dryer exhaust, all in existing Community Residence for the Developmentally Disabled.
B00420420-I1
07/23/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/12/2026
§ 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT…
HPD violation · closed
04/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
04/29/2026
Special inspection requirement — HVAC and service water heating system controls
SAMI HAJJAR P.E
04/29/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
04/29/2026
Special inspection requirement — HVAC and service water heating equipment
SAMI HAJJAR P.E
04/29/2026
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
04/29/2026
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
04/28/2026
Filed — Alteration
Install new AC equipment in public areas on first floor & with some additional ductwork; install new kitchen & bathroom fans to replace existing; new dryer exhaust, all in existing Community Residence for the Developmentally Disabled.
B00420420-P1
04/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
04/14/2026
Filed — Alteration
Plumbing work as per plans filed herewith, all in conjunction with ALT II 340694671.
B00418850-P2
04/09/2026
Boiler inspection report filed
Initial · no defects · Accepted
01/08/2026
Permit renewed — Plumbing
Renewed without changes
B00418850-I1-PL
12/29/2025
§ 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3R, 3rd STORY, 6th APARTMENT FROM NORTH…
HPD violation · open
12/26/2025
§ 27-2028, 2032 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FROM AN APPROVED CENTRAL HEATING SYSTEM, OR AN APPROVED SYSTEM OF GAS OR ELECTRICAL…
HPD violation · open
12/26/2025
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 8th APARTMENT FROM NORTH AT EAST
HPD violation · open
12/26/2025
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT…
HPD violation · open
12/24/2025
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 2B, 2nd…
HPD violation · open
12/24/2025
§ 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 8th APARTMENT FROM SOUTH…
HPD violation · open
12/24/2025
§ 27-2005, 2012 HMC & § 309 MDL: ABATE THE NUISANCE CONSISTING OF EXCESSIVE STORAGE OF MATERIAL COLLYER IN THE ENTIRE APARTMENT LOCATED AT APT 2B,…
HPD violation · open
12/21/2025
567 (c) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 hmc: abate the nuisance consisting of evidence of rats and all…
HPD violation · open
11/06/2025
Failure to maintain building in code compliant manner. Upon inspection, the device is found to be out of service. Remedy: restore to service and…
ECB violation · open
09/23/2025
Elevator Category 1 inspection report filed
08/19/2025
Only elevator in a shelter out of service. This condition affects numerous clients, including those with special needs, thereby creating a…
ECB violation · closed
07/17/2025
§ 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSE ELECTRICAL WIRE AT CEILING IN THE…
HPD violation · open
07/17/2025
FA-05-01: Failed to install fire alarm system conforming with the Fire Department-approved plans meeting all applicable requirements of the New…
FDNY_ORDER violation · closed
07/17/2025
FA-02-03: Failed to obtain approval from the Fire Department for a new or alteration to the existing monitoring services by a central station…
FDNY_ORDER violation · closed
07/17/2025
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR…
HPD violation · open
07/17/2025
§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT…
HPD violation · open
07/17/2025
§ 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE ELECTRICAL LIGHT FIXTURE AT CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 10th APARTMENT…
HPD violation · open
07/17/2025
§ 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING WATER SPRINKLER COVER AT WEST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 2B, 2nd STORY, 10th…
HPD violation · open
07/11/2025
Boiler inspection report filed
Initial · no defects · Accepted
03/01/2025
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 8th APARTMENT FROM EAST AT SOUTH
HPD violation · closed
02/20/2025
§ 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 8th APARTMENT FROM NORTH…
HPD violation · closed
11/19/2024
Permit renewed — Plumbing
Renewed without changes
B00418850-I1-PL
06/20/2024
Special inspection requirement — HVAC and service water heating equipment
SAMI HAJJAR P.E
06/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
06/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
06/20/2024
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
06/20/2024
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
06/20/2024
Special inspection requirement — Final
SAMI HAJJAR P.E
06/20/2024
Special inspection requirement — HVAC and service water heating system controls
SAMI HAJJAR P.E
05/15/2024
BF35: BF35:
FDNY_NOV violation · closed
01/18/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/17/2024
Permit issued — Boiler Equipment
B00955986-I1-BE
01/17/2024
Boiler inspection report filed
Initial · no defects · Accepted
12/28/2023
Permit renewed — Mechanical Systems
Renewed without changes
B00420420-I1-MS
12/12/2023
Filed — Alteration
Remove 2 AO Smith boilers (HW-520) & 1 Hydrotherm boiler (MR-900B).Replace with 1 Laars Neo Therm NTH 399 Boiler in existing boiler room, per plans filed herewith. This is filed in conjunction with ALT II 34069467 & B00955986 (filed for 2nd Laars Boiler
B00421139-P2
12/12/2023
Filed — Alteration
Install new Laars Neo Therm NTH 399 Boiler in existing boiler room all as per plans filed herewith in conjunction with ALT I #340694671 & Boiler Application B00421139. Please see comments for further information.
B00955986-I1
12/12/2023
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
12/12/2023
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
12/12/2023
Special inspection requirement — HVAC and service water heating system controls
SAMI HAJJAR P.E
12/12/2023
Special inspection requirement — HVAC and service water heating equipment
SAMI HAJJAR P.E
12/07/2023
Permit renewed — Plumbing
Renewed without changes
B00418850-I1-PL
11/21/2023
Special inspection requirement — Tenant Protection Plan Compliance
JUAN GOMEZ
10/31/2023
Special inspection requirement — Maintenance information
10/31/2023
Special inspection requirement — HVAC and service water heating system controls
SAMI HAJJAR P.E
10/31/2023
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
10/31/2023
Special inspection requirement — HVAC and service water heating equipment
SAMI HAJJAR P.E
Latest 60 of 167 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—M. Early Plumbing & Heating—
DOB NOW—M. Early Plumbing & Heating—
DOB NOW—M. Early Plumbing & Heating—
DOB NOW—FPS Contracting—
DOB NOW—M. Early Plumbing & Heating—
DOB NOW—FPS Contracting—
DOB NOW—M. Early Plumbing & Heating—
DOB NOW—M. Early Plumbing & Heating—
DOB NOW—Tri Borough Scaffolding—
DOB NOW—Tri Borough Scaffolding—
BIS—FPS Contracting—
BIS—FPS Contracting—
BIS—FPS Contracting—
BIS—American Standard Plumbing & Heating—
BIS—American Standard Plumbing & Heating—
BIS—Theodre Wagner Plumbing & Heating—
BIS—J.C.H. Delta Contracting—
BIS—J.C.H. Delta Contracting—
BIS—J.C.H. Delta Contracting—
Nothing on file for this building.
Nothing on file for this building.
▾Documents — 80 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch - Boiler Equipment3
08/29/2026B00421139-I1Request the plans ↗
08/29/2026B00421139-P2Request the plans ↗
08/29/2026B00421139-P1Request the plans ↗
▸DOB NOWPlans/Sketch - Mechanical Systems3
08/17/2026B00420420-I1Request the plans ↗
08/17/2026B00420420-P1Request the plans ↗
08/15/2026B00420420-I1Request the plans ↗
▸DOB NOWPlans/Sketch - Plumbing3
08/27/2026B00418850-I1Request the plans ↗
08/15/2026B00418850-P1Request the plans ↗
08/15/2026B00418850-P2Request the plans ↗
▸DOB NOWPlans/Sketch2
08/28/2026B08010510-I1Request the plans ↗
08/26/2026B00955986-I1Request the plans ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION4
09/29/2023340694671Open ↗
05/19/2023340694671Open ↗
02/25/2016321174199Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION1
11/25/2022340694671Open ↗
▸Seals & Professional Certifications30
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/29/2026B00421139-I1Open ↗
08/29/2026B00421139-P2Open ↗
08/29/2026B00421139-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/23/2026B00955986-I1Open ↗
09/23/2026B00421139-I1Open ↗
09/23/2026B00955986-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026B00421139-I1Open ↗
09/23/2026B00421139-I1Open ↗
09/01/2026B00420420-P1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
11/04/2015321174199Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
09/19/2019340694671Open ↗
▸Safety & Tenant Protection8
▸DOB NOWTenant Protection Plan8
08/29/2026B00421139-I1Open ↗
08/29/2026B00421139-P2Open ↗
08/29/2026B00421139-P1Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/29/2026B00421139-I1Open ↗
08/27/2026B00418850-I1Open ↗
08/17/2026B00420420-I1Open ↗
Showing 3 of 4 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
11/22/2022340694671Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
10/20/2022340694671Open ↗
05/26/2020340694671Open ↗
09/19/2019340694671Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/29/2026B00421139-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
10/20/2022340694671Open ↗
05/26/2020340694671Open ↗
10/02/2019340694671Open ↗
▸Approvals, Objections & Sign-offs6
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/17/2026B00420420-I1Open ↗
08/17/2026B00420420-P1Open ↗
08/13/2026B00418850-P2Open ↗
Showing 3 of 6 on file for this type
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
09/19/2019340694671Open ↗
11/04/2015321174199Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION4
05/25/2023340694671Open ↗
05/25/2023340694671Open ↗
05/26/2020340694671Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
09/19/2019340694671Open ↗
▸BISEFILING COVER SHEET1
11/04/2015321174199Open ↗