HPD08/03/2026§ 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY
HPD08/03/2026§ 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
ECB01/14/2000EXISTING APARTMENT DOORS OPEN DIRECTLY INTO STAIR ENCLOSURE CONTRARY TO SECTION 27-375(J). REMEDY: FILE PLANS TO LEGALIZE IF FEASIBLE & CONFORM TO CODE.Nothing owed — awaiting certificate of correction
ECB01/14/2000ROOF ACCESS IS MISSING IN THAT BUILDINGS MORE THAN THREE STORIES OR FOURTY FEET HIGH SHALL HAVE AN ACCESS TO THE ROOF BY AT LEAST ONE INTERIOR STAIR AS PER SECTION 27-375(K) OF THE BUILDING CODE. REMEDY:Nothing owed — awaiting certificate of correction
ECB01/14/2000SKYLIGHT AND VENTILATORS FOR STAIR ENCLOSURE ARE NOT PROVIDED AS PER SECTION 27-375(I)(4)C OF THE BUILDING CODE. REMEDY: FILE PLANS TO LEGALIZE IF FEASIBLE & CONFORM TO CODE.Nothing owed — awaiting certificate of correction
ECB01/14/2000BULKHEAD OF FIRE RESISTANT CONSTRUCTION MEETING THE REQUIREMENTS OF SUB-CHAPTER FIVE OF THE BUILDING CODE IS NOT PROVIDED AS PER 27-375(K)(1). REMEDY: FILE PLANS TO LEGALIZE IF FEASIBLE & CONFORM TO CODE.Nothing owed — awaiting certificate of correction
ECB01/14/2000STAIR ENCLOSURE DOES NOT COMPLY WITH THE REQUIRED FIRE RESISTANCE RAT-ING, IN THAT THE BUILDING IS BUILT AS A FOUR-STORY, OCCUPANCY GROUP J-2, WHICH REQUIRES A TWO-HOUR FIRE RATED ENCLOSURES AS PER SECTION 27-3Nothing owed — awaiting certificate of correction
ECB01/14/2000HANDICAP ACCESS TO THE BUILDING IS NOT PROVIDED AS PER SECTION 27-292.5(A) OF THE BUILDING CODE. REMEDY: FILE PLANS TO LEGALIZE IF FEASIBLE & CONFORM TO CODE.Nothing owed — awaiting certificate of correction
ECB01/14/2000PARAPET ON EXTERIOR WALL OF BUILDING IS NOT PROVIDED AT THE ROOF OF THE FOURTH FLOOR AS PER SECTION 27-333 OF THE BUILDING CODE. REMEDY: FILE PLANS TO LEGALIZE IF FEASIBLE AND CONFORM TO CODENothing owed — awaiting certificate of correction
ECB01/14/2000FIRE STOPPING AT PARTY WALLS OF BUILDING IS NOT PROVIDED , CONTRARY TO REQUIREMENTS OR SECTION 27-332 OF THE BUILDING CODE . REMEDY: FILE PLANS TO LEGALIZE IF FEASIBLE AND CONFORM TO CODENothing owed — awaiting certificate of correction
ECB01/14/2000STRUCTURAL DEFECT WHICH VIOLATE REFRENCE STANDARD RS-10-5B WERE OBSERVED , IN THAT : 1- NO STRAP BRACING FOR "C" JOISTS PRESENT . II) ANCHORAGE BETWEEN JOIST AND BEARING OR NON-BEARING WALL WAS NOT PROVIDED.Nothing owed — awaiting certificate of correction
ECB01/14/2000WOOD STAIR BETWEEN CELLAR AND FIRST FLOOR IS NOT PERMITTED AS PER SECTION 27-375 (H) REMEDY: MAKE STAIR OF NON-COMBUSTIBLE MATERIAL AS REQUIED BY CODE ,AND OBTAIN DOB INSPECTIONNothing owed — awaiting certificate of correction
ECB01/14/2000SECOND MEANS OF EGRESS FOR FOUR-STORY BUILDING, CONSTRUCTION CLASS IIBIS NOT PROVIDED AS PER SECTION 27-366 OF THE BUILDING CODE. REMEDY: FILE PLANS TO LEGALIZE IF FEASIBLE & CONFORM TO CODE.Nothing owed — awaiting certificate of correction
ECB01/14/2000BUILDING DOES NOT COMPLY WITH QUALITY HOUSING PROGRAM AS PER SECTION 28-12 AND 28-22 OF THE ZONING RESOLUTION IN THAT THERE ARE NO DOUBLE GLAZED WINDOWS NOR REQUIRED PLANTINGS . REMEDY: FILE PLANS TO LEGALIZE ANothing owed — awaiting certificate of correction
ECB01/13/2000WOOD STAIR BETWEEN CELLAR AND FIRST FLOOR IS NOT PERMITTED AS PER SECTION 27-375 (H). MAKE STAIR OF NON COMBUSTIBLE MATERAIL AS REQUIRED BY CODE AND OBTAIN D.O.B. INSPECTION.Nothing owed — awaiting certificate of correction
ECB01/13/2000EXISTING APARTMENT DOORS OPEN DIRECTLY INTON STAIR ENCLOSURE CONTRARY TO SECTION 27-375(J) REMEDY: FILE PLANS TO LEGALIZE IF FEASIBKE AND CONFORM TO CODE.Nothing owed — awaiting certificate of correction
ECB01/13/2000ROOF ACCESS IS MISSING IN THAT BUILDINGS MORE THAN THREE STORIES OR FORTY FEET HIGH SHALL HAVE AN ACCESS TO THE ROOF BY AT LEAST ONE INTERIOR STAIR AS ER SECTION 27-375(K) OF THE BUILDING CODE . REMEDY; FILE PLNothing owed — awaiting certificate of correction
ECB01/13/2000SKYLIGHT AND VENTILATORS FOR STAIR ENCLOSURE ARE NOT PROVIDED AS PER SECTION 27-375 (I)(4) C OF THE BUILDING CODE. REMEDY: FILE PLANS TO LEGALIZE IF FEASIBLE AND CONFORM TO CODE.Nothing owed — awaiting certificate of correction
ECB01/13/2000BULKHEAD OF FIRE RESISTANT CONSTRUCTION MEETING THE REQUIREMENTS OF SUB CHAPTER FIVE OF THE BUILDING CODE IS NOT PROVIDED AS PER 27-375 (K) (1). FILE PLANS TO LEGALIZE IF FEASIBLE AND CONFORM TO CODE.Nothing owed — awaiting certificate of correction
ECB01/13/2000STAIR ENCLOSURE DOES NOT COMPLY WITH THE FIRE RESISTANCE RATING , IN THAT THE BUILDING IS BUILT AS A FOUR -STORY ,OCCUOANCY GROUP J-2, WHICH REQUIRES A TWO- HOUR FIRE RATED ENCLOSURES AS PER SECTION 27-375 (I)Nothing owed — awaiting certificate of correction
ECB01/13/2000PARAPET ON EXTERIOR WALL OF BUILDING IS NOT PROVIDED AT THE ROOF OF THE FOURTH FLOOR AS PER SECTION 27-333 OF THE BUILDING CODE . REMEDY: FILE PLANS TO LEGALIZE IF FEASIBLE AND CONFORM TO CODENothing owed — awaiting certificate of correction
ECB01/13/2000FIRE STOPPING AT PARTY WALLS OF BUILDING IS NOT PROVIDED , CONTRARY TO REQUIREMENTRS OF SECTION 27-332 OF THE BUILDING CODE. REMEDY: FILE PLANS TO LEGALIZE IF FEASIBLE AND CONFORM TO CODE.Nothing owed — awaiting certificate of correction
ECB01/13/2000STRUCTURAL DEFECTS WHICH VIOLATE REFRENCE STANDARD RS10-5B WERE OBSERVED, IN THAT : (I) NO STRAP BRACING FOR "C" JOISTS PRESENT (II) ANCHORAGE BETWEEN JOIST AND BEARING OR NON-BEARING WALL WAS NOT PROVIDED (IIINothing owed — awaiting certificate of correction
ECB01/13/2000BUILDING DOES NOT COMPLY WITH QUALITY HOUSING PROGRAM AS PER SECTIONS 28-12 & 28-22 OF THE ZONING RESOLUTION IN THAT THERE ARE NO DOUBLE-GLAZED WINDOWS NOR REQUIRED PLANTING.FILE PLANS TO LEGALIZE & CONFORM TONothing owed — awaiting certificate of correction
ECB01/13/2000HANDICAP ACCESS TO THE BUILDING IS NOT PROVIDED AS PER SECTION 27-292.5(A) OF THE BUILDING CODE. REMEDY: FILE PLANS TO LEGALIZE IF FEASIBLE AND CONFORM TO CODENothing owed — awaiting certificate of correction
ECB01/13/2000SECOND MEANS OF EGRESS FOR FOUR - STORY BUILDING , CONSTRUCTION CLASS 2B, IS NOT PROVIDED AS PER SECTION 27-366 OF THE BUILDING CODE, REMEDY: FILE PLANS TO LEGALIZE IF FEASIBLE AND CONFORM TO CODENothing owed — awaiting certificate of correction
ECB11/06/1998WORK W/O A PERMIT. WORK NOTED: ERECTING AN EXTENSION ON ROOF OF PREMISES W/O A PERMIT. REMEDY: STOP ALL WORK. OBTAIN A PERMIT IF FEASIBLE OR RESTORE (REMOVE) TO PRIOR LEGAL CONDITION.Nothing owed — awaiting certificate of correction
Four families · Owner of record: 56 MIDDLETON LLC · 2,066 sf lot · 3.87 FAR built · Flood zone X500