← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Parkchester South Condominium
25 METROPOLITAN OVAL · BIN 2096664
💬 Discuss this project
0Year Built
—Stories
RMBuilding Class
R6Zoning
2,199,075 sfGross Floor Area
2,719Units
Rent Stabilized952 Open Violations 951 unresolved · 1 paperwork only ▸FISP: SAFEFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: PARKCHESTER SOUTH CONDOMINIUM ASSOC · 951,289 sf lot · 2.31 FAR built · Flood zone X
Locations of Work
Structural
Roof1p · 1 filing · 10 docs
Floor 51p · 1 filing · 3 docs
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KINGS GROUP NY407/08/2026
OWNER OF 1430 PARKCHES203/22/2026
OWNR OF 1430 PARKCHEST103/22/2026
P CHESTER CONDO303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CONNOLLY ENGINEERING, PLLC405/27/2026
SYED ENGINEERING, P.C.102/12/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
OUTSOURCE CONSULTANTS, INC.303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VINCO BUILDERS LLCGeneral Contractor507/08/2026
ALEXANDER EUGENEElectrical103/21/2026
KINGS GROUP NY CORPGeneral Contractor107/08/2026
TWO-TONE CONTRACTING CORP.General Contractor107/16/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CONNOLLY ENGINEERING, PLL3427405/27/2026
OUTSOURCE SPECIAL INSPECT2827203/27/2026
Building Lifecycle
All (109)Filed (5)Permit Issued (5)Signed Off (3)Facade (FISP) (12)Violation (60)Objection (8)Special Inspection (16)
07/15/2026
Permit issued — General Construction
X01370755-I1-GC
06/10/2026
Special inspection requirement — Final
daniel connolly
06/10/2026
Special inspection requirement — Concrete - Cast-In-Place
daniel connolly
06/10/2026
Special inspection requirement — Post-installed Anchors
daniel connolly
06/10/2026
Special inspection requirement — Tenant Protection Plan Compliance
JONAR MADRIAGA
05/27/2026
Filed — Alteration
Alterations to building entry as per ADA requirement including removal of stairs, installation of ADA ramp. Work to include removal & replacement of building entry vestibule as per plans filed herewith. No change in use, egress or occupancy.
X01370755-P1
05/21/2026
Special inspection requirement — Concrete - Cast-In-Place
daniel connolly
05/21/2026
Special inspection requirement — Post-installed Anchors
daniel connolly
05/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/21/2026
Special inspection requirement — Final
daniel connolly
04/08/2026
Objection raised — Other
04/08/2026
Objection resolved — Resolved
04/08/2026
Objection raised — Other
04/08/2026
Objection resolved — Resolved
03/27/2026
Filed — Alteration
Alterations to building entry as per ADA requirement including removal of stairs, installation of ADA ramp. Work to include removal & replacement of building entry vestibule as per plans filed herewith. No change in use, egress or occupancy.
X01370755-I1
03/23/2026
Violation issued (HPD, closed)
A
03/23/2026
Violation issued (HPD, closed)
C
03/23/2026
Violation issued (HPD, closed)
C
03/23/2026
Violation issued (HPD, closed)
B
03/23/2026
Violation issued (HPD, closed)
A
03/18/2026
Violation issued (HPD, closed)
B
03/18/2026
Violation issued (HPD, closed)
B
03/18/2026
Violation issued (HPD, closed)
B
03/18/2026
Violation issued (HPD, closed)
B
03/18/2026
Violation issued (HPD, closed)
B
03/18/2026
Violation issued (HPD, closed)
B
03/18/2026
Violation issued (HPD, closed)
B
03/18/2026
Violation issued (HPD, closed)
B
03/11/2026
Violation issued (HPD, closed)
C
03/11/2026
Violation issued (HPD, closed)
C
03/11/2026
Violation issued (HPD, closed)
C
02/09/2026
Violation issued (HPD, closed)
B
02/09/2026
Violation issued (HPD, closed)
A
02/09/2026
Violation issued (HPD, closed)
B
02/09/2026
Violation issued (HPD, closed)
B
02/09/2026
Violation issued (HPD, closed)
B
02/09/2026
Violation issued (HPD, closed)
B
02/09/2026
Violation issued (HPD, closed)
B
02/09/2026
Violation issued (HPD, closed)
A
02/09/2026
Violation issued (HPD, closed)
B
02/09/2026
Violation issued (HPD, closed)
A
02/09/2026
Violation issued (HPD, closed)
C
02/09/2026
Violation issued (HPD, closed)
B
11/18/2025
Violation issued (HPD, closed)
C
11/02/2025
Violation issued (HPD, closed)
C
11/02/2025
Violation issued (HPD, closed)
B
11/02/2025
Violation issued (HPD, closed)
C
11/02/2025
Violation issued (HPD, closed)
B
08/09/2025
Violation issued (HPD, closed)
B
08/09/2025
Violation issued (HPD, closed)
B
08/09/2025
Violation issued (HPD, closed)
B
08/09/2025
Violation issued (HPD, closed)
B
04/08/2025
Signed off — Alteration
STRUCTURAL WORK AT THE SUBJECT PREMISES FOR ROOF SLAB REINFORCEMENT AS PER PLANS AT APTS 12A, 12B, 12C, 12D, 12E, 12F, 12G, 12H . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01089001-I1
02/13/2025
Permit issued — Structural
X01089001-I1-GC-CX
01/27/2025
Permit issued — General Construction
X01089001-I1-GC-CX
11/08/2024
Violation issued (HPD, open)
B
11/08/2024
Violation issued (HPD, open)
C
11/08/2024
Violation issued (HPD, closed)
A
11/08/2024
Violation issued (HPD, closed)
C
10/29/2024
Objection resolved — Addressed
Latest 60 of 109 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTWO-TONE CONTRACTING CORP.07/15/2026
DOB NOWStructuralSigned-offVINCO BUILDERS LLC02/13/2025
DOB NOWGeneral ConstructionSigned-offVINCO BUILDERS LLC01/27/2025
DOB NOWStructuralSigned-offVINCO BUILDERS LLC09/16/2021
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP02/12/2021
BISOTISSUEDCASTCAPA CONSTRUCTION LLC07/09/2021
BISOTISSUEDCASTCAPA CONSTRUCTION LLC03/16/2021
BISPLISSUEDNAT'L MECH. SVCS PLBG LLC01/29/2013
BISMHISSUEDNATIONAL MECHANICAL SERVI01/29/2013
BISEQISSUEDCS BRIDGE CORP05/18/2012
BISOTISSUEDCERCONE EXTERIOR REST COR05/03/2012
BISOTISSUEDCERONE EXTERIOR RESTORATION CORP07/25/2008
BISOTISSUEDCERCONE EXTERIOR REST COR04/03/2008
BISEQISSUEDOUTDOOR INSTALLATION LLC03/31/2008
BISOTISSUEDDNA CONTRACTING LLC07/29/2003
BISEQRE-ISSUEDSPRING SCAFFOLDING04/22/2003
BISOTISSUEDPPC CONSTRUCTION LLC07/17/2000
BISEQISSUEDATLANTIC HEYDT SCAFFOLD CORP04/12/2000
BISPLISSUEDMEDCO PLUMBING INC02/09/2000
BISOTISSUEDPPC CONSTRUCTION LLC02/09/2000
1 project · most recent 02/13/2021
FiledStatusContractorScope
02/13/2021Permit IssuedHIGH QUALITY ELECTRIC OF—
1 project · most recent 05/27/2026
Concrete
FiledStatusContractorScope
05/27/2026Permit IssuedTWO-TONE CONTRACTING CORPConcrete
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
06/10/2026Finaldaniel connollyprogress
06/10/2026Concrete - Cast-In-Placedaniel connollyspecial
06/10/2026Post-installed Anchorsdaniel connollyspecial
06/10/2026Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
05/21/2026Concrete - Cast-In-Placedaniel connollyspecial
05/21/2026Post-installed Anchorsdaniel connollyspecial
05/21/2026Tenant Protection Plan Compliance—special
05/21/2026Finaldaniel connollyprogress
07/31/2024Structural Steel - Detailsdaniel connollyspecial
07/31/2024Structural Steel - Weldingdaniel connollyspecial
07/31/2024Finaldaniel connollyprogress
07/31/2024Structural Steel - High Strength Boltingdaniel connollyspecial
07/31/2024Structural Stability – Alterations of existing buildingsdaniel connollyspecial
07/31/2024Post-installed Anchorsdaniel connollyspecial
07/31/2024Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
02/10/2021FinalRAFI HAMIDprogress
▾Documents — 109 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch4
08/25/2026X00533723-I1Request digital key ↗
08/21/2026X01089001-I1Request digital key ↗
08/17/2026X01370755-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/25/2026X00468456-I1Request digital key ↗
▸Applications & Permits17
▸BISWORK PERMIT APPLICATION8
03/16/2021240298094Open ↗
01/31/2013220250047Open ↗
01/31/2013220250047Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
12/31/2020240298094Open ↗
01/29/2013220250047Open ↗
05/18/2012220205828Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
12/31/2020240298094Open ↗
12/31/2020240298094Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
02/12/2013210040640Open ↗
▸Seals & Professional Certifications38
▸DOB NOWSpecial Inspector Seal & Signature11
08/30/2026X01370755-I1Open ↗
08/30/2026X01370755-I1Open ↗
08/30/2026X01370755-I1Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
02/20/2013220173522Open ↗
02/01/2013220205828Open ↗
01/29/2013220250047Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/25/2026X00533723-I1Open ↗
08/17/2026X01370755-P1Open ↗
08/17/2026X01370755-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
01/29/2013220250047Open ↗
05/18/2012220205828Open ↗
03/14/2012220173522Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
01/29/2013220250047Open ↗
05/18/2012220205828Open ↗
03/14/2012220173522Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/30/2026X01370755-I1Open ↗
08/24/2026X01089001-I1Open ↗
08/23/2026X00468456-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/31/2020240298094Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/31/2020240298094Open ↗
▸Trade Schedules & Equipment2
▸BISSELF-CERT PLUMBING NOTICE1
05/14/2013220250047Open ↗
▸BISSCHEDULE B - PLUMBING1
01/29/2013220250047Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
04/30/2021240298094Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/25/2026X00533723-I1Open ↗
08/17/2026X01370755-P1Open ↗
08/17/2026X01370755-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
12/31/2020240298094Open ↗
01/29/2013220250047Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
03/18/2008210040640Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/27/2008210041756Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/16/2021240298094Open ↗
12/31/2020240298094Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
03/30/2023240298094Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/30/2023240298094Open ↗
▸BISTECHNICAL REPORT: ENERGY1
03/14/2012220173522Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/30/2023240298094Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/29/2013220250047Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/31/2020240298094Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
03/30/2023240298094Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/20/2013220173522Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/31/2020240298094Open ↗
▸Approvals, Objections & Sign-offs12
▸BISADMINISTRATIVE OBJECTIONS5
01/29/2013220250047Open ↗
05/18/2012220205828Open ↗
03/14/2012220173522Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
03/31/2023240298094Open ↗
02/20/2013220173522Open ↗
02/12/2013210040640Open ↗
Showing 3 of 5 on file for this type
▸BISFINAL1
03/30/2023240298094Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
02/01/2013220205828Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT6
12/31/2020240298094Open ↗
02/20/2013220173522Open ↗
01/29/2013220250047Open ↗
Showing 3 of 6 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
03/30/2023240298094Open ↗
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET5
01/29/2013220250047Open ↗
05/18/2012220205828Open ↗
03/14/2012220173522Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION2
03/14/2012220173522Open ↗
03/27/2008210041756Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/31/2020240298094Open ↗