← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Parkchester South Condominium
25 METROPOLITAN OVAL · BIN 2096688
💬 Discuss this project
0Year Built
—Stories
RMBuilding Class
R6Zoning
2,199,075 sfGross Floor Area
2,719Units
Rent Stabilized951 Open Violations 950 unresolved · 1 paperwork only ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: PARKCHESTER SOUTH CONDOMINIUM ASSOC · 951,289 sf lot · 2.31 FAR built · Flood zone X
Locations of Work
ArchitectureGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 2 filings · 13 docs
BulkheadUnder Construction1p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PSC607/08/2026
OLSHAN PROPERTIES1107/08/2026
LEMX506/07/2026
PARKCHESTER S CONDO IN203/22/2026
OWNER OF 1469 EAST AVE103/22/2026
PARKCHESTER PRESERVATION COMPANY103/21/2026
METROPOLITIAN ASSOC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HIERARCH-E203/21/2026
AE DESIGN SOLUTION403/21/2026
ALL IN PERMIT CONSULTANTS103/21/2026
CONCEPT DESIGN GROUP103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PROTO RESTORATION CONSTRUCTIONGeneral Contractor707/08/2026
SMJ CONSTRUCTION TECH,LLCGeneral Contractor303/21/2026
LEMX CORPGeneral Contractor206/07/2026
JOSEPH SORTINOElectrical103/21/2026
POFI CONSTRUCTION CORPGeneral Contractor107/08/2026
ANTONIO TZOUMASElectrical103/21/2026
TJ SIGNS UNLIMITEDScaffold107/08/2026
DOUGLAS HEDBERGElectrical103/21/2026
ECO ELECTRICAL SERVCS LLCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RIMKUS NEW YORK, PLLC8123103/27/2026
Building Lifecycle
All (105)Filed (9)Permit Issued (9)Signed Off (3)Facade (FISP) (12)Violation (60)Special Inspection (12)
07/21/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X01367092-P2
06/05/2026
Permit issued — Sidewalk Shed
X01367092-I1-SH
05/28/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X01367092-P1
05/12/2026
Permit issued — General Construction
X01323402-I1-GC
04/08/2026
Violation issued (HPD, open)
C
04/08/2026
Violation issued (HPD, closed)
B
03/27/2026
Filed — Alteration
FACADE RESTORATION AND LEAK REPAIRS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01323402-I1
03/18/2026
Violation issued (HPD, closed)
A
03/18/2026
Violation issued (HPD, closed)
B
03/18/2026
Violation issued (HPD, open)
A
03/18/2026
Violation issued (HPD, open)
A
03/18/2026
Violation issued (HPD, closed)
B
03/18/2026
Violation issued (HPD, closed)
B
03/10/2026
Permit issued — Suspended Scaffold
X01364141-I1-SC
03/09/2026
Permit issued — Sidewalk Shed
X01367092-I1-SH
03/07/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X01367092-I1
03/04/2026
Filed — Alteration
SUSPENDED SCAFFOLD PLANS FOR FACADE REPAIRS AND INSPECTIONS
X01364141-I1
03/02/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
George Xerakias
03/02/2026
Special inspection requirement — Post-installed anchors in masonry
George Xerakias
12/18/2025
Special inspection requirement — Air barrier - visual inspection
JAMES MONAHAN
12/18/2025
Special inspection requirement — Masonry
JAMES MONAHAN
12/18/2025
Special inspection requirement — Post-installed Anchors
JAMES MONAHAN
12/18/2025
Special inspection requirement — Insulation placement and R values
JAMES MONAHAN
12/18/2025
Special inspection requirement — Energy Code Compliance Inspections
JAMES MONAHAN
12/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
JAMES MONAHAN
11/21/2025
Special inspection requirement — Final
JAMES MONAHAN
11/17/2025
Violation issued (HPD, closed)
I
04/16/2024
Violation issued (HPD, closed)
A
01/20/2024
Violation issued (HPD, closed)
B
01/20/2024
Violation issued (HPD, closed)
A
01/20/2024
Violation issued (HPD, closed)
A
01/20/2024
Violation issued (HPD, closed)
B
01/20/2024
Violation issued (HPD, closed)
B
01/20/2024
Violation issued (HPD, closed)
B
01/20/2024
Violation issued (HPD, closed)
A
01/16/2024
Violation issued (HPD, closed)
C
01/16/2024
Violation issued (HPD, closed)
C
01/16/2024
Violation issued (HPD, closed)
B
01/16/2024
Violation issued (HPD, closed)
A
01/16/2024
Violation issued (HPD, closed)
A
01/16/2024
Violation issued (HPD, closed)
B
11/13/2023
Violation issued (HPD, closed)
C
11/13/2023
Violation issued (HPD, closed)
C
03/29/2023
Violation issued (HPD, closed)
A
02/21/2023
Cycle 9 facade report submitted
02/21/2023
Cycle 9 facade report signed — SAFE
01/11/2023
Cycle 9 facade inspection completed
11/05/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00451933-I1
10/06/2022
Violation issued (HPD, closed)
B
10/06/2022
Violation issued (HPD, closed)
B
06/27/2022
Violation issued (HPD, closed)
B
06/27/2022
Violation issued (HPD, closed)
B
05/06/2022
Permit issued — Sidewalk Shed
X00451933-I1-SH
03/08/2022
Violation issued (HPD, closed)
A
12/17/2021
Violation issued (ECB, closed)
Construction
10/07/2021
Permit issued — Supported Scaffold
X00586579-I1-SF
10/06/2021
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00586579-I1
08/25/2021
Violation issued (HPD, closed)
C
08/25/2021
Violation issued (HPD, closed)
B
04/16/2021
Violation issued (HPD, closed)
A
Latest 60 of 105 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offLEMX CORP06/05/2026
DOB NOWGeneral ConstructionPermit IssuedPOFI CONSTRUCTION CORP05/12/2026
DOB NOWSuspended ScaffoldPermit IssuedPOFI CONSTRUCTION CORP03/10/2026
DOB NOWSidewalk ShedSigned-offLEMX CORP03/09/2026
DOB NOWSidewalk ShedSigned-offPROTO RESTORATION CONSTRU05/06/2022
DOB NOWSupported ScaffoldPermit IssuedPROTO RESTORATION CONSTRU10/07/2021
DOB NOWSidewalk ShedSigned-offPROTO RESTORATION CONSTRU02/19/2021
DOB NOWSignSigned-offAMERICAN SIGN & ELECL CON03/26/2018
DOB NOWConstruction FenceSigned-offSMJ CONSTRUCTION TECH,LLC02/21/2018
BISOTISSUEDPROTO RESTORATION CONSTRUCTION03/30/2021
BISPLISSUEDI DO PLUMBING & HTG INC02/13/2018
BISMHISSUEDSMJ CONSTRUCTION TECH,LLC02/01/2018
BISPLISSUEDR.J.C. MECHANICAL CORP11/21/2017
BISOTISSUEDTORC, INC11/17/2017
BIS—ISSUEDCITY SIGNS INC06/14/2016
BISOTISSUEDCITY SIGNS INC06/13/2016
BIS—ISSUEDCITY SIGNS INC06/10/2016
BISOTISSUEDHOBO CONSTRUCTION CO06/04/2009
BISEQISSUEDOUTDOOR INSTALLATIONS LLC04/29/2009
BISOTISSUEDHOBO CONSTRUCTION CO04/23/2009
BISOTISSUEDTECHINICAL CONSTRUCTION SRVCS,IN08/02/2005
BISPLISSUEDBLUEPRINT PLUMBING CORPORATION02/06/2003
BISOTISSUEDPPC CONSTRUCTION LLC02/06/2003
BISEQISSUEDATLANTIC HEYDT CORP.03/01/2001
BIS—ISSUEDPARKER SERVICE INDUSTRIES06/24/1999
BIS—ISSUEDPARKER SERVICE INDUSTRIES06/21/1999
BISPLISSUEDADVANCED PLBG LLC05/18/1999
BISMHISSUEDLORICH BUILDING CORP.05/03/1999
BISOTISSUEDLORICH BUILDING CORP.05/03/1999
7 projects · most recent 03/07/2026
General Wiring Lighting
FiledStatusContractorScope
03/07/2026Permit IssuedRICHARD NEU—
02/11/2026Permit IssuedWIRETECH ELECTRIC CORP1 meters, 1 new_meters
01/08/2021CompleteTOP SHELF ELECTRIC CORP—
12/15/2019CompleteAMBER ELECTL CONTNG INCGeneral Wiring
04/12/2018CompleteROBERT S. COVELLO—
02/09/2018Permit IssuedY.S ELECTRICGeneral Wiring, Lighting
12/26/2017Permit IssuedECO ELECTRICAL SERVCS LLC2 meters, 1 new_meters
2 projects · most recent 07/21/2026
Sidewalk Shed Scaffold
FiledStatusContractorScope
07/21/2026Signed-offLEMX CORPSidewalk Shed
10/06/2021Permit IssuedPROTO RESTORATION CONSTRUScaffold
1 project · most recent 03/04/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
03/04/2026Permit IssuedPOFI CONSTRUCTION CORPSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
03/02/2026Alternative Materials - OTCR Buildings Bulletin NumberGeorge Xerakiasspecial
03/02/2026Post-installed anchors in masonryGeorge Xerakiasspecial
12/18/2025Air barrier - visual inspectionJAMES MONAHANenergy_progress
12/18/2025MasonryJAMES MONAHANspecial
12/18/2025Post-installed AnchorsJAMES MONAHANspecial
12/18/2025Insulation placement and R valuesJAMES MONAHANenergy_progress
12/18/2025Energy Code Compliance InspectionsJAMES MONAHANprogress
12/11/2025Tenant Protection Plan ComplianceJAMES MONAHANspecial
11/21/2025FinalJAMES MONAHANprogress
01/11/2021FinalPaul Perdekprogress
03/01/2018FinalSALVATOR CARADONNAprogress
02/16/2018FinalYongho Kimprogress
▾Documents — 168 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch8
08/26/2026X00020218-I1Request digital key ↗
08/26/2026X00023595-I1Request digital key ↗
08/25/2026X00586579-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/25/2026X00451933-I1Request digital key ↗
▸Applications & Permits24
▸BISWORK PERMIT APPLICATION12
03/30/2021240298209Open ↗
02/14/2018240212952Open ↗
01/31/2018240212952Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION9
12/30/2020240298209Open ↗
01/31/2018240212952Open ↗
11/14/2017220617027Open ↗
Showing 3 of 9 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
06/19/2018240212952Open ↗
12/12/2012220004260Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
01/14/2021240298209Open ↗
▸Seals & Professional Certifications49
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
08/07/2018220617027Open ↗
05/07/2018240212952Open ↗
11/16/2017220617027Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/26/2026X00023595-I1Open ↗
08/25/2026X00586579-I1Open ↗
08/17/2026X01323402-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/19/2026X01323402-I1Open ↗
09/19/2026X01323402-I1Open ↗
09/19/2026X01323402-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
11/14/2017220617027Open ↗
06/14/2016220514726Open ↗
06/10/2016220514717Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
01/31/2018240212952Open ↗
11/14/2017220617027Open ↗
11/14/2017220617027Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/19/2026X01323402-I1Open ↗
09/19/2026X01323402-I1Open ↗
09/19/2026X01323402-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/30/2020240298209Open ↗
01/31/2018240212952Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
04/30/2009220004260Open ↗
04/23/2009220003323Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/30/2020240298209Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
01/31/2018240212952Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
11/14/2017220617027Open ↗
▸BISSCHEDULE B - PLUMBING1
01/31/2018240212952Open ↗
▸BISEQUIPMENT USE PERMITS1
06/19/2018240212952Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
06/19/2018240212952Open ↗
▸Safety & Tenant Protection2
▸BISTPP1: TENANT PROTECTION PLAN1
03/30/2021240298209Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
01/31/2018240212952Open ↗
▸Environmental & Asbestos11
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
12/30/2020240298209Open ↗
01/31/2018240212952Open ↗
11/14/2017220617027Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/26/2026X00023595-I1Open ↗
08/17/2026X01323402-I1Open ↗
08/13/2026X00020218-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
04/23/2009220003323Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
04/30/2009220004260Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
04/13/2022240298209Open ↗
04/06/2022240298209Open ↗
03/30/2021240298209Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
05/07/2018240212952Open ↗
11/14/2017220617027Open ↗
08/02/2016220514708Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
08/07/2018220617027Open ↗
06/19/2018240212952Open ↗
08/02/2016220514708Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
12/30/2020240298209Open ↗
01/31/2018240212952Open ↗
▸BISNYCECC ANALYSIS1
01/31/2018240212952Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/06/2022240298209Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
04/13/2022240298209Open ↗
04/13/2022240298209Open ↗
04/06/2022240298209Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs17
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST13
04/14/2022240298209Open ↗
08/13/2018220617027Open ↗
08/07/2018220617027Open ↗
Showing 3 of 13 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
04/30/2009220004260Open ↗
04/23/2009220003323Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/13/2026X00586579-I1Open ↗
08/13/2026X00451933-I1Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT13
12/30/2020240298209Open ↗
08/07/2018220617027Open ↗
06/19/2018240212952Open ↗
Showing 3 of 13 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
04/06/2022240298209Open ↗
▸Filing & Intake Forms14
▸BISEFILING COVER SHEET7
11/14/2017220617027Open ↗
11/14/2017220617027Open ↗
06/14/2016220514726Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM3
08/07/2018220617027Open ↗
06/19/2018240212952Open ↗
05/07/2018240212952Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
12/30/2020240298209Open ↗
01/31/2018240212952Open ↗
▸BISADDITIONAL INFORMATION2
05/03/2018240212952Open ↗
03/26/2018240212952Open ↗
▸Other Documents2
▸DOB NOWCalculations1
08/13/2026X01364141-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026X01364141-I1Open ↗