← Back
Elevator cooperative
25 PLAZA ST WEST
BROOKLYN · BIN 3024549
💬 Discuss this project
1941Year Built
6Stories
D4Building Class
R8XZoning
72,900 sfGross Floor Area
71Units
LL97 CoveredRent Stabilized10 Open Violations ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: 25 PLAZA TENANTS CORP. · 15,624 sf lot · 4.67 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 7 docs
Floor 12p · 1 filing · 17 docs
CellarUnder Construction3p · 1 filing · 7 docs
1 job · most recent 11/10/2023
Ventilation Systems
FiledStatusContractorScope
11/10/2023——Ventilation Systems
1 job · most recent 11/10/2023
Water/Sanitary
FiledStatusContractorScope
11/10/2023——Water/Sanitary
25 jobs · most recent 06/18/2026
General Wiring
FiledStatusContractorScope
06/18/2026CompleteZIN ELECTRICAL, INC—
07/01/2025CompleteZIN ELECTRICAL, INC—
04/30/2025Permit IssuedCRESCO ELECTRICAL CORPGeneral Wiring
04/17/2025CompleteI.D.K. ELECTRIC CO., INC.General Wiring
02/25/2025CompleteRIVIERA ELECTRIC CORPGeneral Wiring
01/09/2025Permit IssuedACCURATE ELEC'L CORP.General Wiring
09/17/2024CompleteSJ ELECTRICAL SERVICES LLGeneral Wiring
07/12/2024CompleteHIGH QUALITY ELECTRIC OF—
01/19/2024CompleteZIN ELECTRICAL, INCGeneral Wiring
07/17/2023CompleteA&E ELECTRICAL SYSTEMS COGeneral Wiring
06/07/2023CompleteZIN ELECTRICAL, INCGeneral Wiring
04/26/2023CompleteFIU CORP DBA FIU ELECTRIC—
02/01/2023CompleteSAFETECH ELECL CONTNG CORGeneral Wiring
10/11/2022CompleteMICHAEL F. ADANUNCIO ELECGeneral Wiring
11/19/2021Permit IssuedSUPER CHARGED ELEC. INC.General Wiring
1 job · most recent 01/29/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
01/29/2025Permit IssuedPNA CONTRACTING CORPSuspended Scaffold (SC)
Building Lifecycle
All (234)Filed (17)Permit Issued (14)Signed Off (11)Facade (FISP) (12)Violation (60)Inspection (10)Objection (80)Special Inspection (30)
07/14/2026
Permit issued — General Construction
B01269935-I1-GC
03/26/2026
Filed — Alteration
SOUND EXPOSED CONCRETE SURFACES & REMOVE LOOSE MATERIAL, CONDUCT VERTICAL & OVERHEAD CONCRETE REPAIRS, ROUTE & SEAL ALL NON MOVING CRACKS. APPLY BREATHABLE COATING TO ALL EXPOSED VERTICAL &OVERHEAD CONCRETE SURFACES. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01269935-I1
03/12/2026
Signed off — Alteration
FILING FOR KITCHEN AND BATHROOM UPDATE AT APT 2L. WORK INCLUDES REMOVAL AND REPLACEMENT OF CABINETRY, INTERIOR NON-LOAD BEARING PARTITIONS, DOORS, AND FINISH WORK. NO CHANGE IN FIXTURE LOCATIONS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
B01197060-I1
11/19/2025
Violation issued (HPD, closed)
I
08/11/2025
Special inspection requirement — Final
Christopher Krepcio
08/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Christopher Krepcio
08/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
Dean Mendez
06/10/2025
Violation issued (HPD, closed)
A
04/14/2025
Permit issued — General Construction
B01197060-I1-GC
03/21/2025
Filed — Alteration
FILING FOR KITCHEN AND BATHROOM UPDATE AT APT 2L. WORK INCLUDES REMOVAL AND REPLACEMENT OF CABINETRY, INTERIOR NON-LOAD BEARING PARTITIONS, DOORS, AND FINISH WORK. NO CHANGE IN FIXTURE LOCATIONS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
B01197060-I1
03/19/2025
Signed off — Alteration
PAINT GUARD RAILS, FIRE ESCAPES, WINDOW LINTEL WITH RUST INHIBITIVE PAINT, PROTECTING THE EXISTING BRICK AND REPLACE THE CRACKED MORTAR, REPOINT BRICK WORK, STUCCO COATING REPAIR AND REAPPLICATION OF WHITEBREATHABLE COATING WORK AS PER PLAN.
B00980109-I1
03/18/2025
Cycle 9 facade report signed — SAFE
03/18/2025
Special inspection requirement — Final
Frank Demmerle
03/13/2025
Special inspection requirement — HVAC-R and service water heating system controls
03/13/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
03/13/2025
Special inspection requirement — HVAC-R and service water heating equipment
03/04/2025
Cycle 9 facade inspection completed
02/03/2025
Permit issued — General Construction
B00980109-I1-GC
01/31/2025
Permit issued — Suspended Scaffold
B01171272-I1-SC
01/30/2025
Objection raised — Admin
01/30/2025
Objection resolved — Addressed
01/29/2025
Filed — Alteration
Installation of suspended scaffold for facade work or inspection
B01171272-I1
01/28/2025
Cycle 9 facade report submitted
01/28/2025
Special inspection requirement — Post-installed Anchors
Leo Lee
01/28/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Leo Lee
11/27/2024
Violation issued (HPD, closed)
I
11/21/2024
Signed off — Alteration
B01036285-I1
11/08/2024
Permit issued — Structural
B01036285-I1-GC-CX
11/05/2024
Signed off — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01072503-I1
11/05/2024
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01064436-I1
08/09/2024
Objection raised — Scope
08/09/2024
Objection resolved — Addressed
07/18/2024
Objection raised — Other
07/18/2024
Objection resolved — Addressed
07/10/2024
Special inspection requirement — Tenant Protection Plan Compliance
INDARDEO PARBHUNATH
07/01/2024
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01072503-I1
07/01/2024
Permit issued — Supported Scaffold
B01072503-I1-SF
06/25/2024
Signed off — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01064442-I1
06/21/2024
Permit issued — Supported Scaffold
B01064442-I1-SF
06/21/2024
Permit issued — Sidewalk Shed
B01064436-I1-SH
06/20/2024
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01064436-I1
06/20/2024
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01064442-I1
05/28/2024
Objection raised — Other
05/28/2024
Objection resolved — Addressed
05/28/2024
Objection raised — Other
05/28/2024
Objection resolved — Addressed
05/28/2024
Objection raised — Other
05/28/2024
Objection resolved — Addressed
05/28/2024
Objection raised — Other
05/28/2024
Objection resolved — Addressed
05/18/2024
Filed — Alteration
B01036285-I1
04/15/2024
Special inspection requirement — Structural Wood Frame
INDARDEO PARBHUNATH
04/15/2024
Special inspection requirement — Final
Ozmar Martinez Suarez
04/15/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
INDARDEO PARBHUNATH
04/11/2024
Signed off — Alteration
Filing to remove and replace existing plumbing fixtures, remove and cap off the gas dryer. No drawings required
B00691713-I1
04/11/2024
Signed off — Alteration
Filing and obtaining approval for the renovation of adding partitions for new closets in existing bedrooms as per drawings
B00691300-I1
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/30/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/30/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/12/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 234 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
METRO MANAGEMENT1807/15/2026
25 PLAZA TENANTS3403/22/2026
EXO INDUSTRIES103/22/2026
ADVANCED MANAGEMENT SE203/22/2026
25 PLAZA ST TENANTS603/21/2026
METRO MANAGEMENT DEVEL.INC103/21/2026
25 PLAZA TENNANT303/21/2026
METRO MANAG 25 PLAZA ST WEST203/21/2026
METRO MANAGEMENT DEVELOPMENT303/21/2026
METRO MANAGEMENT DEVEL203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CEPRINE CONSTRUCTION INCGeneral Contractor707/08/2026
H&M RENOVATION AND MORE IGeneral Contractor307/08/2026
RIVIERA ELECTRIC CORP 004346General Contractor203/22/2026
NEW YORK PLBG-HTG-COOLINGPlumbing207/08/2026
SALVATORE FEOLAElectrical103/21/2026
ZIN ELECTRICAL, INCElectrical103/22/2026
NEW AMERICAN CONSTRUCTION INCGeneral Contractor107/08/2026
PNA CONTRACTING CORPGeneral Contractor104/08/2026
XINOS CONSTRUCTION CORPGeneral Contractor107/15/2026
CARLTON ASPINALLElectrical103/21/2026
SCARPONI&SON PLBG&HTG CORPlumbing107/08/2026
FEOLA SALVATOREElectrical103/21/2026
GOTHAM WIRING LICENSEDElectrical103/22/2026
IRVING BAPTISTEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DEAN MENDEZ ARCHITECT, P.8621103/26/2026
MERRITT ENGINEERING CONSU460103/26/2026
LEO Y LEE ASSOCIATES2481101/29/2025
IP CONCRETE TESTING AND I6252205/18/2024
GEORGE J. XERAKIAS, PE1658112/20/2023
MUNICIPAL TESTING LABORAT230308/30/2023
MOORE ASSOCIATES, LLC3408202/24/2023
O'ROURKE ENGINEERING, LLC5873202/24/2023
WINTON GROUP ARCHITECTURE4343103/24/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedXINOS CONSTRUCTION CORP07/14/2026
DOB NOWGeneral ConstructionSigned-offH&M RENOVATION AND MORE I04/14/2025
DOB NOWGeneral ConstructionSigned-offPNA CONTRACTING CORP02/03/2025
DOB NOWSuspended ScaffoldPermit IssuedPNA CONTRACTING CORP01/31/2025
DOB NOWStructuralSigned-offMETRO MANAGEMENT11/08/2024
DOB NOWSupported ScaffoldSigned-offCEPRINE CONSTRUCTION INC07/01/2024
DOB NOWSupported ScaffoldSigned-offCEPRINE CONSTRUCTION INC06/21/2024
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC06/21/2024
DOB NOWPlumbingSigned-offSCARPONI&SON PLBG&HTG COR07/17/2023
DOB NOWGeneral ConstructionSigned-offH&M RENOVATION AND MORE I05/26/2023
DOB NOWSprinklersSigned-offNEW YORK PLBG-HTG-COOLING01/11/2023
DOB NOWSprinklersSigned-offNEW YORK PLBG-HTG-COOLING01/11/2023
DOB NOWGeneral ConstructionSigned-offH&M RENOVATION AND MORE I07/19/2021
DOB NOWSidewalk ShedSigned-offNEW AMERICAN CONSTRUCTION10/20/2019
BISOTISSUEDH&M RENOVATION AND MORE I09/19/2019
BISOTISSUEDDESIGN DEVELOPMENT NYC IN04/26/2019
BISOTISSUEDDESIGN DEVELOPMENT NYC IN03/18/2019
BISPLISSUEDMACREDDIN PLBG & HTG INC02/06/2016
BISMHISSUEDINDIAN HEAD CONTRACTING11/06/2015
BISPLISSUEDMACREDDIN PLBG & HTG INC12/11/2014
BISOTISSUEDTHE ENGLISH PAINTING CO09/30/2014
BISPLISSUEDR&A HEATING & CONTRG CO.I01/14/2014
BISOTISSUEDABR MOLDING ANDY LLC12/19/2013
BISPLISSUEDHYDROKINETIC PLBG & HTG I08/15/2013
BISOTISSUEDPML RENOVATIONS INC08/06/2013
BISOTISSUEDH&M RENOVATION AND MORE I07/23/2013
BISPLISSUEDDNA PLUMBING CONTR. INC01/18/2013
BISOTISSUEDH&M RENOVATION AND MORE I01/04/2013
BISEQISSUEDROCK SCAFFOLDING CORP04/06/2012
BISOTISSUEDCENTRAL CONSTRUCTION MANAGEMENT03/27/2012
BISPLISSUEDPETER MICELI PLUMBING03/26/2012
BISEQISSUEDROCK SCAFFOLDING CORP02/16/2012
BISOTISSUEDJABUS BUILDING CORP01/12/2012
BISPLISSUEDTHE PLUMBING COMPANY INC06/29/2010
BISOTISSUEDHEIGHTS CONSTRUCTION06/16/2010
BISEQISSUEDXINOS CONSTRUCTION CORP03/09/2010
BISOTISSUEDXINOS CONSTRUCTION CORP02/25/2010
BISOTISSUEDXINOS CONSTRUCTION CORP08/10/2009
BISEQISSUEDXINOS CONSTRUCTION CORP07/02/2009
BISPLISSUEDA.M.N. CORPORATION05/08/2008
+ 16 more permits on file
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
01/30/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/30/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/09/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/02/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/25/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/25/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/25/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/20/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/20/2023Certified Sprinkler - SP - RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
08/11/2025FinalChristopher Krepcioprogress
08/11/2025Structural Stability – Alterations of existing buildingsChristopher Krepciospecial
08/11/2025Tenant Protection Plan ComplianceDean Mendezspecial
03/18/2025FinalFrank Demmerleprogress
03/13/2025HVAC-R and service water heating system controls—energy_progress
03/13/2025HVAC-R and service water piping design and insulation—energy_progress
03/13/2025HVAC-R and service water heating equipment—energy_progress
01/28/2025Post-installed AnchorsLeo Leespecial
01/28/2025Alternative Materials - OTCR Buildings Bulletin NumberLeo Leespecial
07/10/2024Tenant Protection Plan ComplianceINDARDEO PARBHUNATHspecial
04/15/2024Structural Wood FrameINDARDEO PARBHUNATHprogress
04/15/2024FinalOzmar Martinez Suarezprogress
04/15/2024Structural Stability – Alterations of existing buildingsINDARDEO PARBHUNATHspecial
01/03/2024Energy Code Compliance InspectionsGeorge Xerakiasprogress
01/03/2024MasonryGeorge Xerakiasspecial
01/03/2024Structural Stability – Alterations of existing buildingsGeorge Xerakiasspecial
12/20/2023FinalGeorge Xerakiasprogress
12/20/2023Tenant Protection Plan ComplianceGeorge Xerakiasspecial
09/05/2023Fire-Resistant Penetrations and JointsCLOUD LEEspecial
08/23/2023Fire-Resistant Penetrations and JointsCLOUD LEEspecial
06/20/2023Energy Code Compliance InspectionsINDARDEO PARBHUNATHprogress
06/20/2023Ventilation and air distribution systemINDARDEO PARBHUNATHenergy_progress
06/20/2023Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
06/20/2023Lighting in dwelling unitsINDARDEO PARBHUNATHenergy_progress
05/22/2023FinalNAVEEN KUMARprogress
Latest 25 of 35.
▾Documents — 326 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch15
08/28/2026B00757313-P1Request digital key ↗
08/28/2026B00757313-I1Request digital key ↗
08/26/2026B00980109-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
08/15/2026B00474975-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00249127-I1Request digital key ↗
▸Applications & Permits65
▸BISWORK PERMIT APPLICATION28
09/20/2019322010239Open ↗
04/29/2019322027588Open ↗
03/28/2019322027588Open ↗
Showing 3 of 28 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION24
10/18/2021320378747Open ↗
09/09/2021320378747Open ↗
09/07/2021320378747Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWLPC Approval/Permit12
08/17/2026B01269935-I1Open ↗
08/15/2026B00474975-I1Open ↗
08/14/2026B00691713-I1Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
10/10/2019322027588Open ↗
▸Seals & Professional Certifications95
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION31
12/24/2019322010239Open ↗
09/20/2019322010239Open ↗
12/06/2018322027588Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/23/2026B00757313-I1Open ↗
09/23/2026B00757313-I1Open ↗
09/18/2026B01036285-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/01/2026B00474975-I1Open ↗
08/28/2026B00757313-P1Open ↗
08/28/2026B00757313-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/18/2026B01036285-I1Open ↗
09/18/2026B01036285-I1Open ↗
08/29/2026B00474975-I1Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
12/06/2018322027588Open ↗
12/05/2018322027588Open ↗
11/13/2015321266731Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
12/06/2018322027588Open ↗
12/05/2018322027588Open ↗
11/13/2015321266731Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
02/22/2012320431118Open ↗
11/15/2011320393374Open ↗
07/02/2009320047221Open ↗
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment18
▸BISSELF-CERT PLUMBING NOTICE7
07/14/2014320877360Open ↗
06/30/2014320877360Open ↗
06/14/2014320877360Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING5
11/04/2013320877360Open ↗
07/25/2013320835441Open ↗
10/03/2012320427150Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
10/12/2019322027588Open ↗
12/06/2018322027588Open ↗
12/05/2018322027588Open ↗
Showing 3 of 5 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
10/10/2019322027588Open ↗
▸Safety & Tenant Protection7
▸BISTenant Protection Plan and Notes3
08/21/2019322010239Open ↗
12/06/2018322027588Open ↗
12/05/2018322027588Open ↗
▸BISSTREET TREE CHECKLIST2
07/25/2013320835441Open ↗
10/19/2011320378747Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026B00878766-I1Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026B00249127-I1Open ↗
▸Environmental & Asbestos25
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/28/2026B00757313-I1Open ↗
08/28/2026B00757313-P1Open ↗
08/22/2026B01197060-I1Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
12/06/2018322027588Open ↗
12/05/2018322027588Open ↗
09/12/2014320971613Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
11/15/2011320393374Open ↗
10/19/2011320378747Open ↗
04/07/2010320146882Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
07/02/2009320047221Open ↗
04/21/2009320008674Open ↗
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
12/06/2018322027588Open ↗
12/05/2018322027588Open ↗
01/11/2016321266731Open ↗
Showing 3 of 9 on file for this type
▸BISTR8: Energy Code Progress Inspections3
10/24/2013320427150Open ↗
07/26/2013320740917Open ↗
11/07/2011320378747Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
12/24/2019322010239Open ↗
07/07/2014320877360Open ↗
10/24/2013320427150Open ↗
▸BISTECHNICAL REPORT: ENERGY2
11/15/2011320393374Open ↗
10/19/2011320378747Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/15/2026B00474975-I1Open ↗
▸Approvals, Objections & Sign-offs30
▸BISADMINISTRATIVE OBJECTIONS10
09/12/2014320971613Open ↗
07/25/2013320835441Open ↗
02/22/2012320431118Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
12/24/2019322010239Open ↗
01/11/2016321266731Open ↗
11/09/2010320146882Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
11/14/2015321266731Open ↗
07/07/2014320877360Open ↗
07/07/2014320877360Open ↗
Showing 3 of 7 on file for this type
▸BISLANDMARKS APPROVAL4
08/21/2019322010239Open ↗
12/05/2018322027588Open ↗
11/14/2015321266731Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership25
▸BISCOST AFFIDAVIT25
12/24/2019322010239Open ↗
08/21/2019322010239Open ↗
12/06/2018322027588Open ↗
Showing 3 of 25 on file for this type
▸Filing & Intake Forms17
▸BISEFILING COVER SHEET13
08/21/2019322010239Open ↗
12/05/2018322027588Open ↗
12/04/2018322027588Open ↗
Showing 3 of 13 on file for this type
▸BISADDITIONAL INFORMATION3
12/24/2019322010239Open ↗
10/12/2019322027588Open ↗
11/15/2011320393374Open ↗
▸BISBOROUGH INTAKE FORM1
12/24/2019322010239Open ↗
▸Other Documents9
▸DOB NOWDHCR Document5
08/14/2026B00691713-I1Open ↗
08/14/2026B00691713-I1Open ↗
08/13/2026B00691713-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWManufacturer's Specifications1
08/13/2026B01171272-I1Open ↗
▸DOB NOWCalculations1
08/13/2026B01171272-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00878766-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026B00878766-I1Open ↗